Completed No litigation declared Residential / Group Housing project

99 RIVERFRONT

By SRRINIVAS INFRABUILDTECH PRIVATE LIMITED

RG-MH-04685 · RERA P52100019974 · Last updated on MahaRERA portal: 27 Nov 2024

Source: official MahaRERA filing

Red flags

  • 2 complaints at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2023Possession promisedregistration recorded completed
11 of 11Construction stages doneevery applicable stage filed complete
2Complaints at MahaRERAon this registration
Jump to the 80 documents Report an error

99 RIVERFRONT is a Residential / Group Housing project by SRRINIVAS INFRABUILDTECH PRIVATE LIMITED in Pune, Maharashtra, registered with MahaRERA as P52100019974 on 15 Mar 2019. The registration is recorded completed; possession was promised by 30 Dec 2023. 2 complaints are on record with the regulator.

At a glance

Project

  • Name99 RIVERFRONT
  • TypeResidential / Group Housing
  • Location
    • BANER
    • Haveli
    • Pune
    • 411045
  • Pincode411045
  • RERA no.P52100019974
  • ReraGenie IDRG-MH-04685

Builder

  • NameSRRINIVAS INFRABUILDTECH PRIVATE LIMITED
  • Entity typeCompany
  • DirectorsROHIT GHANSHYAM GUPTA, ASHISH SATISH GUPTA
  • Other registrations1 more →
  • Completed2 of 2

Key dates

this monthRegisteredMar 2019PromisedDec 2023Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on15 Mar 2019
  • Promised completion30 Dec 2023
  • Revised completionNone
  • Buildings1 building record
  • Documents filed80 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A BUILDINGNA160000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 27 Nov 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 11 construction stages are filed complete.

A BUILDING: 100% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 27 Nov 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingNoNot applicable

Parking filed55

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots55
Closed/Covered51
Open Space4

Land and ownership13

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,500 sq m
Land owned byThe promoter, with other names on the file
Named landowners13
LandownerVillageDistrict
VITTHAL ALHATBanerPune
MRS VEENA SHAILENDRA AGARWALBanerPune
RAHUL SHAILENDRA AGARWALBanerPune
POOJA AVINASH AGARWALBanerPune
SHARDA VITTHAL ALHATBanerPune
ASHA VITTHAL ALHATBanerPune
NITIN VITTHAL ALHATBanerPune
JYOTSNA NITIN ALHATBanerPune
OM NITIN ALHATBanerPune
ARYA NITIN ALHATBanerPune
PRAGATI VITTHAL ALHATBanerPune
PRITI VITTHAL ALHATBanerPune
KANAN RAHUL AGARWALBanerPune

Approvals and building plan

Permissible FSI4343.87
Proposed, not sanctioned4,344 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch1548 By A, Sadashiv Peth, Off Tilak Road, Pune, Pin 411030

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMITESH SIDHPURA
EngineerDesign werkz
Chartered AccountantCA Avtarsingh H Saini
PartnerRole in project
SRRINIVAS INFRABUILDTECH PRIVATE LIMITED-

Litigation declared5

CaseCourtStatus
2a-2014/11457-14/5482/2018/2018IGR MAHARASHTRAPENDING
726/2020/2020Civil Court Senior Division Puneending for hearing of Amendment Application
2218/2022/2022CIVIL COURT SENIOR DIVISIONNext Date is Given
2380/2022/2022CIVIL COURT SENIOR DIVISIONNext Date is Given
2532/2022/2022CIVIL COURT SENIOR DIVISIONNext Date is Given

Complaints filed with MahaRERA2

Case no.ComplainantRespondentFiled
CC005000000023012Nirmiti Builders through Sunil PuranikSrrinivas Infrabuildtech Private Limited11/05/2019
CC005000000064697Srrinivas Realtors Pvt LtdSrrinivas Infrabuildtech Pvt Ltd04/10/2020

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 11 Mar 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 11 Mar 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 11 Mar 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 11 Mar 2019Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 5 Oct 2023

Documents filed80

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: riverfront ph 1.pdf27 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: 99 River_Phase 1_17-18 18-19_Uploaded.pdf12 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: 99 River_Phase 1_17-18 18-19_Uploaded.pdf12 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: 99 Riverfront_FORM 5_Phase 1.pdf12 Oct 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: BANER SNO 154 FULL COMPLETION CERTIFICATE OCC.pdf5 Oct 2023
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 Phase 1 A Wing.pdf5 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: 99 RIver_Phase 2_17-18 18-19.pdf25 Sep 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: 99 RIver_Phase 2_17-18 18-19.pdf25 Sep 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: 99 Riverfront_FORM 5_Phase 2.pdf29 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Ph 1.pdf3 Aug 2023
Certificates of CA (Form 3)File: CA Cert Ph 1.pdf19 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arc Cert Ph 1.pdf14 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Cert Ph 1.pdf14 Jul 2023
Disclosure of sold/ booked inventoryFile: Sold Unsold Ph 1.pdf14 Jul 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: PART COMPLETION.pdf26 May 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 99 A WING.pdf20 Apr 2023
Certificates of CA (Form 3)File: CA Certificate_99 RIVERFRONT_A_BUILDING_compressed.pdf20 Apr 2023
Disclosure of sold/ booked inventoryFile: Sold Unsold Ph 1.pdf19 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Cert Ph 1.pdf18 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arc Cert Ph 1.pdf13 Apr 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank Declaration Ph 1_.pdf23 Mar 2023
Certificates of CA (Form 3)File: CA Certificate_99 RIVERFRONT_A_BUILDING_compressed.pdf20 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arc Cert Ph 1.pdf19 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Cert Ph 1.pdf19 Jan 2023
Disclosure of sold/ booked inventoryFile: Sold Unsold Ph 1.pdf19 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: 99 Riverfront_Phase 1.pdf6 Dec 2022
Status of Formation of Legal Entity (Society/Co Op etc.)File: 99 Riverfront_Society formation.pdf28 Oct 2022
Certificates of CA (Form 3)File: CA Certificate_99 RIVERFRONT_A_BUILDING_compressed.pdf20 Oct 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Srrinivas Ph 1.pdf20 Oct 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arc Cert_Ph 1.pdf17 Oct 2022
Certificates of CA (Form 3)File: CA Certificate_99 RIVERFRONT_A_BUILDING_compressed (2).pdf27 Aug 2022
Disclosure of sold/ booked inventoryFile: Sold Unsold_ph1.pdf12 Jul 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Certificate_phase 1_bldg A.pdf7 Jul 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2_ENG CERT_PH1_WING A.pdf7 Apr 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM-2A_ENG CERT_PH1_A WING.pdf7 Apr 2022
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD_A BUILDING.pdf7 Apr 2022
Certificates of CA (Form 3)File: FORM 3_CA CERT_A BUILDING.pdf7 Apr 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARC_PH1_A BUILDING.pdf8 Jan 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENG_PHASE1.pdf8 Jan 2022
CERSAI detailsFile: CERSAI_REPORT.pdf8 Jan 2022
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD_BUIL A.pdf8 Jan 2022
Certificates of CA (Form 3)File: CA_CERT_BUIL_A_compressed.pdf8 Jan 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: A BUILDING.pdf7 Oct 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: eng scan.pdf6 Oct 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: eng scan-1-3.pdf6 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Shrinivas A Building -Quality_compressed.pdf6 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Shrinivas B Building -Quality_compressed.pdf6 Oct 2021
Disclosure of sold/ booked inventoryFile: a building_compressed.pdf6 Oct 2021
Certificates of CA (Form 3)File: CA Certificate for RERA Baner phase 1 A building_compressed.pdf6 Oct 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: srrinivas infrabuildtech pvt ltd from 5 phase 1 19-20.pdf6 Oct 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: srrinivas infrabuildtech pvt ltd from 5 phase 1 19-20.pdf6 Oct 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: srrinivas infrabuildtech pvt ltd from 5 phase 2 20-21.pdf6 Oct 2021
Declaration about Commencement CertificateFile: 99 RF.pdf4 Oct 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SRRINIVA Phase 1 Arct.pdf19 Aug 2021
Certificates of CA (Form 3)File: CA Form 3 RERA Baner phase 1 A building.pdf19 Aug 2021
Disclosure of sold/ booked inventoryFile: Srrinivas A Building.pdf27 Jul 2021
Disclosure of sold/ booked inventoryFile: Srriniwas Infrabuildtect PVT LTD PH 1.pdf18 Jun 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: A bldg ACRCHITECT PHASE 1.pdf23 Nov 2020
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGG CERTIFICATE PHASE 1.pdf23 Nov 2020
Certificates of CA (Form 3)File: CA CERTIFICATE PHASE1.pdf23 Nov 2020
Proforma of Allotment letterFile: Baner ATS.pdf8 Jun 2019
Details of encumbrancesFile: BANER Encumbrances Letter.pdf12 Apr 2019
Details of encumbrancesFile: Declaration.pdf12 Mar 2019
Declaration in FORM BFile: Affidavit cum Declaration Srrinivas Infrabuildtech Pvt Ltd.pdf12 Mar 2019
Certificates of CA (Form 3)File: RERA Certificate.pdf12 Mar 2019
Proforma of Allotment letterFile: Agreement to Sale Letter of Allotment.pdf12 Mar 2019
Layout approvalFile: BANER LAYOUT PLAN.pdf11 Mar 2019
Building plan approvalFile: BANER BP PLAN 1.pdf11 Mar 2019
Building plan approvalFile: BANER BP PLAN 2.pdf11 Mar 2019
Building plan approvalFile: BANER BP PLAN 3.pdf11 Mar 2019
Building plan approvalFile: BANER BP PLAN 4.pdf11 Mar 2019
Copy of the legal title reportFile: TITLE SEARCH.pdf11 Mar 2019
Copy of Layout Approval (in case of layout)File: BANER LAYOUT PLAN.pdf11 Mar 2019
Building Plan Approval (IOD)File: BANER BP PLAN 1.pdf11 Mar 2019
Building Plan Approval (IOD)File: BANER BP PLAN 2.pdf11 Mar 2019
Building Plan Approval (IOD)File: BANER BP PLAN 3.pdf11 Mar 2019
Building Plan Approval (IOD)File: BANER BP PLAN 4.pdf11 Mar 2019
Commencement Certificates / NA Order for plotted developmentFile: BANER BP CC.pdf11 Mar 2019
Commencement Certificates / NA Order for plotted developmentFile: BANER LAYOUT CC.pdf11 Mar 2019
PAN CardFile: Srrinivas Infrabuildtech Pvt Ltd.pdf10 Mar 2019

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep 99 RIVERFRONT on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near BANER13,700+ in Pune

Builder: SRRINIVAS INFRABUILDTECH PRIVATE LIMITED

SRRINIVAS INFRABUILDTECH PRIVATE LIMITED has 2 registrations on MahaRERA, including 99 RIVERFRONT and 99 RIVERFRONT. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if 99 RIVERFRONT is delayed beyond 30 Dec 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of 99 RIVERFRONT?

The registered promoter entity is SRRINIVAS INFRABUILDTECH PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in 99 RIVERFRONT?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against 99 RIVERFRONT?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for 99 RIVERFRONT?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at 99 RIVERFRONT?

The professionals named in the filing: Architect: MITESH SIDHPURA; Engineer: Design werkz; Chartered Accountant: CA Avtarsingh H Saini. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in 99 RIVERFRONT?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About 99 RIVERFRONT. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save 99 RIVERFRONT to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.