Home / Browse projects / Mumbai City, Maharashtra / 96 TAGORE

Registered No litigation declared Residential / Group Housing project

96 TAGORE

By SSD VENTURES LLP

RG-MH-87450 · RERA P51900034416 · Last updated on MahaRERA portal: 4 Aug 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 20 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai City registration emailed to you, free during the pilot beta.
Oct 2026Possession promisedmoved 20 months from the original
6 of 11Construction stages donefurthest along: Sanitary Fittings within the flats /..., 95%
11 of 41Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 121 documents Report an error

96 TAGORE is a Residential / Group Housing project by SSD VENTURES LLP in Mumbai City, Maharashtra, registered with MahaRERA as P51900034416 on 5 Apr 2022. Possession is promised by 31 Oct 2026. The completion date has moved by 20 months from the original filing. 30 of the 41 units on this registration are recorded sold or booked, and 6 of 11 construction stages are filed complete.

At a glance

Project

  • Name96 TAGORE
  • TypeResidential / Group Housing
  • Location
    • 96 TAGORE ROAD
    • SANTACRUZ
    • Mumbai City
    • 400054
  • Pincode400054
  • RERA no.P51900034416
  • ReraGenie IDRG-MH-87450

Builder

  • NameSSD VENTURES LLP
  • Entity typePartnership
  • GSTIN27ABTFS6613D1ZW
  • PartnersHARSH MAHESH JAGWANI, MAHESH NOTANDAS JAGWANI

Key dates

this monthRegisteredApr 2022First promiseFeb 2025Revised toOct 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on5 Apr 2022
  • Promised completion31 Oct 2026
  • Revised completionRevised to 31 Oct 2026 (originally 22 Feb 2025)
  • Buildings1 building record
  • Documents filed121 files

Current status

73%30 of 41 units booked
91.7%Work done, per cost certificate

Figures as on 4 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
96 TAGORENA161241041

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 4 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 11 construction stages are filed complete. The stage furthest along is Sanitary Fittings within the flats / premises, at 95%.

96 TAGORE: 89% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises95%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%

Progress on shared amenities15

As on 4 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes90%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes90%
Storm Water DrainsYes90%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes98%
Water conservation /Rain water harvestingYes95%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes95%
Electrical meter room, sub-station, receiving stationYes90%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed101

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots101
Closed/Covered101

Land and ownership3

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,009 sq m
Land owned byThe promoter, with other names on the file
Named landowners3
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on21 May 2025
LandownerVillageDistrict
NIKUNJ PARMANAND SHAHMumbai CityMumbai City
RAJESH PARMANAND SHAHMumbai CityMumbai City
HARESH PARMANAND SHAHMumbai CityMumbai City

Approvals and building plan

Permissible FSI5749.22
Proposed, not sanctioned5,749 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchNOTAN CHAMBERS , G1, 893, MEZZANINE, TURNER ROAD, BANDRA WEST, MUMBAI 400050
Estimated costRs 45.00 cr
Cost incurredRs 41.28 cr
Work done91.73%
BuildingWingEstimatedIncurred
96 TAGORENARs 25.00 crRs 25.00 cr
-NARs 20.00 crRs 16.28 cr

Certifying professionals and partners8

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMS AR SEEMA PURI
ArchitectMS JAVARI & SONS
EngineerMS PRAVINGALA AND CONSULTANT PRIVATE LIMITED
EngineerPANORA INFRASTRUCTURE LLP
Chartered AccountantMS R M A & CO
Chartered AccountantMRP & ASSOCIATES
Chartered AccountantRMA & CO LLP
Chartered AccountantA K O R D & CO
PartnerRole in project
SSD VENTURES LLP-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51900027485Feb 2025 → Aug 2025

Reason as filed by the promoterProject is at finishing stage and we are going to apply Occupancy Certificate shortly. There is a slight delay in completion work mainly due to structural changes in BMC Plan.

EA28072621898Feb 2025 → Oct 2026

Reason as filed by the promoterSelf Declaration explaining the reason for delay is uploaded in "Other" document tab.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 17 Mar 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 23 Aug 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 9 Feb 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 17 Mar 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Oct 2026

Documents filed121

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 121 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1.pdf4 Aug 2026
Withdrawal Update Form 1File: FORM 1.pdf4 Aug 2026
Withdrawal Update Form 1File: FORM 1.pdf4 Aug 2026
Withdrawal Update Form 2File: FORM 2.pdf4 Aug 2026
Withdrawal Update Form 2File: FORM 2.pdf4 Aug 2026
Withdrawal Update Form 2File: FORM 2.pdf4 Aug 2026
Withdrawal Update Form 3File: FORM 3.pdf4 Aug 2026
Withdrawal Update Form 3File: FORM 3.pdf4 Aug 2026
Withdrawal Update Form 3File: FORM 3.pdf4 Aug 2026
Withdrawal Update Form 1File: FORM 1_.pdf27 Jul 2026
Withdrawal Update Form 1File: FORM 1.pdf27 Jul 2026
Withdrawal Update Form 2File: FORM 2.pdf27 Jul 2026
Withdrawal Update Form 2File: FORM 2.pdf27 Jul 2026
Withdrawal Update Form 3File: FORM 3.pdf27 Jul 2026
Withdrawal Update Form 3File: FORM 3.pdf27 Jul 2026
Form 2A (FY 2025-2026)File: FORM 2A.pdf27 Jul 2026
Form 5 (FY 2024-2025)File: FORM 5_FY 2024-25.pdf27 Jul 2026
Layout approvalFile: Drawing Pg 1 and 2.pdf23 Aug 2025
Layout approvalFile: Drawing Pg 3 and 4.pdf23 Aug 2025
Layout approvalFile: Drawing Pg 5 and 6.pdf23 Aug 2025
Layout approvalFile: Drawing Pg 7 and 8.pdf23 Aug 2025
Form 2A (FY 2022-2023)File: Quality Certificate.pdf28 May 2025
Form 2A (FY 2023-2024)File: Form 2A_SSD VENTURE_31.03.2024.pdf27 May 2025
Form 2A (FY 2024-2025)File: Form 2A_SSD VENTURE_31.03.2025.pdf27 May 2025
Form 5 (FY 2023-2024)File: Form -5.pdf27 May 2025
Form 5 (FY 2022-2023)File: Signed form 5 (96 Tagore).pdf27 May 2025
OthersFile: Form 2A March 2025.pdf26 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf22 May 2025
Disclosure of sold/ booked inventoryFile: Sold unsold inventory March 2025.pdf22 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 SSD Venture LLP 31-03-2025 signed.pdf7 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 March 2025.pdf5 May 2025
Declaration in FORM BFile: Notarised Form-B (2).pdf21 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1.pdf21 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2.pdf21 Mar 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory.pdf21 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A.pdf21 Mar 2025
Declaration in FORM BFile: Notarised Form-B.pdf12 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 as on 11-03-2025.pdf12 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf24 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Q3.pdf24 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf24 Jan 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory.pdf24 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architecture Certificate.pdf19 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf19 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf19 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: SSD-CERTIFICATE.pdf19 Nov 2024
Disclosure of sold/ booked inventoryFile: Sold unsold inventory details.pdf19 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architecture Certificate.pdf19 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf19 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf19 Nov 2024
Disclosure of sold/ booked inventoryFile: Sold unsold inventory details.pdf19 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: SSD-CERTIFICATE.pdf19 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architecture Certificate FORM 1.pdf25 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate FORM 2.pdf25 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate FORM 2.pdf25 Jul 2024
Disclosure of sold/ booked inventoryFile: Sold-Unsold Inventory.pdf25 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 SSD Venture LLP.pdf25 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect certificate 96 Tagore.pdf30 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 96 Tagore Engineer Certificate.pdf30 Apr 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory 96 Tagore.pdf30 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 96 TAGORE.pdf30 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3- SSD VENTURES LLP.pdf24 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect certificate_96 Tagore.pdf20 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 96 Tagore Engineer Certificate.pdf20 Jan 2024
Disclosure of sold/ booked inventoryFile: Scan_0002.pdf20 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Signed form 5 (96 Tagore).pdf24 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate_96 Tagore_Sep-23.pdf2 Nov 2023
Layout approvalFile: Drawing-1.pdf25 Oct 2023
Layout approvalFile: Drawing-2.pdf25 Oct 2023
Layout approvalFile: Drawing-3.pdf25 Oct 2023
Layout approvalFile: Drawing-4.pdf25 Oct 2023
Layout approvalFile: Drawing-5.pdf25 Oct 2023
Layout approvalFile: Drawing-6.pdf25 Oct 2023
Copy of Layout Approval (in case of layout)File: Drawing-1.pdf25 Oct 2023
Copy of Layout Approval (in case of layout)File: Drawing-2.pdf25 Oct 2023
Copy of Layout Approval (in case of layout)File: Drawing-3.pdf25 Oct 2023
Copy of Layout Approval (in case of layout)File: Drawing-4.pdf25 Oct 2023
Copy of Layout Approval (in case of layout)File: Drawing-5.pdf25 Oct 2023
Copy of Layout Approval (in case of layout)File: Drawing-6.pdf25 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect certificate.pdf25 Oct 2023

How this compares with Mumbai City

73%of this project is bookeddistrict median 17%
33%of Mumbai City projects moved their completion datethis one moved by 20 months
25%of Mumbai City registrations have lapsed or been cancelledthis one is on the register

Computed across the 780+ Mumbai City projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep 96 TAGORE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near SANTACRUZ780+ in Mumbai City

Builder: SSD VENTURES LLP

SSD VENTURES LLP has 1 registration on MahaRERA, including 96 TAGORE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai City district page.

Frequently asked questions

What are my rights if 96 TAGORE is delayed beyond 31 Oct 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of 96 TAGORE?

The registered promoter entity is SSD VENTURES LLP, a partnership as per the filing. Its GSTIN 27ABTFS6613D1ZW can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in 96 TAGORE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for 96 TAGORE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at 96 TAGORE?

The professionals named in the filing: Architect: MS AR SEEMA PURI; Architect: MS JAVARI & SONS; Engineer: MS PRAVINGALA AND CONSULTANT PRIVATE LIMITED; Engineer: PANORA INFRASTRUCTURE LLP; Chartered Accountant: MS R M A & CO; Chartered Accountant: MRP & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in 96 TAGORE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About 96 TAGORE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save 96 TAGORE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.