Home / Browse projects / 90 Madhukunj
90 Madhukunj
RG-MH-47379 · RERA P52100017943 · Last updated on MahaRERA portal: 2 Mar 2025
Source: official MahaRERA filing
Red flags
- 1 complaint at MahaRERA
- Completion date moved by 10 months
- 1 extension taken
Clear
- No litigation declared
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: .Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
90 Madhukunj is a Others project by Gokhale Shelters LLP in Bopodi, 411012, registered with MahaRERA as P52100017943 on 28 Sep 2018. The registration is recorded completed; possession was promised by 31 Jan 2024. The completion date has moved by 10 months from the original filing. 1 complaint is on record with the regulator.
At a glance
Project
- Name90 Madhukunj
- TypeOthers
- Location
- Spicer College Road
- Bopodi
- 411012
- Pincode411012
- RERA no.P52100017943
- ReraGenie IDRG-MH-47379
Builder
- NameGokhale Shelters LLP
- Entity typePartnership
- GSTIN27AAOFG7360H1Z1
- PartnersPoonam Vishal Gokhale, Vishal Vasant Gokhale
- Other registrations2 more →
- Completed2 of 3
- No longer live1 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on28 Sep 2018
- Promised completion31 Jan 2024
- Revised completionRevised to 31 Jan 2024 (originally 30 Mar 2023)
- Buildings1 building record
- Documents filed107 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| 90 Madhukunj | NA | 22 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 2 Mar 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
11 of 11 construction stages are filed complete.
90 Madhukunj: 100% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 2 Mar 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | No | Not applicable |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 100% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | No | Not applicable |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed331
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership2
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| M/s Gokhale Shelters LLP | Pune (M Corp.) | Pune |
| Sanjeev Vishnu Dhurandhar | - | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Siddharth Harishchandrakar |
| Architect | Mangesh Gotal |
| Engineer | J W Consultants |
| Engineer | Mahesh Mate |
| Chartered Accountant | CA SIDDHARTH SATCHIDANAND SMART |
| Partner | Role in project |
|---|---|
| Gokhale Shelters LLP | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterDue to Covid-19 pandemic we were not able to construct anymore because of lack of labour contractors and the poor market condition we were unable to complete the project within the due time.
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC12600162 | Shafik Jahangir Shaikh | Gokhale Shelters LLP | 10/01/2026 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 10 Sep 2018 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 18 Sep 2018 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 2 Mar 2025 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 2 Mar 2025Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 17 Nov 2024
Documents filed107
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 107 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Building plan approvalFile: 1_compressed.pdf | 2 Mar 2025 |
| Building plan approvalFile: 2.pdf | 2 Mar 2025 |
| Building plan approvalFile: 3.pdf | 2 Mar 2025 |
| Building plan approvalFile: 4_compressed.pdf | 2 Mar 2025 |
| Building plan approvalFile: 5_compressed.pdf | 2 Mar 2025 |
| Building plan approvalFile: 6.pdf | 2 Mar 2025 |
| Building plan approvalFile: 7.pdf | 2 Mar 2025 |
| Building plan approvalFile: 8.pdf | 2 Mar 2025 |
| Building plan approvalFile: 9.pdf | 2 Mar 2025 |
| Building plan approvalFile: 10.pdf | 2 Mar 2025 |
| Commencement Certificates / NA Order for plotted developmentFile: CC315923 Dated 11032024.pdf | 2 Mar 2025 |
| Building Plan Approval (IOD)File: 1_compressed.pdf | 2 Mar 2025 |
| Building Plan Approval (IOD)File: 2.pdf | 2 Mar 2025 |
| Building Plan Approval (IOD)File: 3.pdf | 2 Mar 2025 |
| Building Plan Approval (IOD)File: 4_compressed.pdf | 2 Mar 2025 |
| Building Plan Approval (IOD)File: 5_compressed.pdf | 2 Mar 2025 |
| Building Plan Approval (IOD)File: 6.pdf | 2 Mar 2025 |
| Building Plan Approval (IOD)File: 7.pdf | 2 Mar 2025 |
| Building Plan Approval (IOD)File: 8.pdf | 2 Mar 2025 |
| Building Plan Approval (IOD)File: 9.pdf | 2 Mar 2025 |
| Building Plan Approval (IOD)File: 10.pdf | 2 Mar 2025 |
| Architect’s Certificate on Completion of Project (Form 4)File: Form 4 90 Madhukunj Revised 1.pdf | 6 Dec 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 90 Madhukunj Full 250424.pdf | 17 Nov 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 90 Madhukunj Full 250424.pdf | 17 Nov 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: 90 Madhukunj.pdf | 24 Oct 2024 |
| Certificates of CA (Form 3)File: Form 3 90 Madhukunj 31032024.pdf | 13 Oct 2024 |
| Certificates of CA (Form 3)File: Form 3 90 Madhukunj 25042024.pdf | 13 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: 90 Madhukunj.pdf | 13 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Madhukunj 25 04 24 - Signed.pdf | 10 Aug 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - 90 Madhukunj - 25 04 2024.pdf | 18 Jun 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1_90 Madhukunj_31 03 2024.pdf | 21 May 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 90 - Madhukunj - Form 1 - 25 04 2024 - Signed.pdf | 8 May 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - 90 MK - 31 03 2024 - Signed.pdf | 6 May 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 2A - 90 Madhukunj - 2021-22 - Signed.pdf | 30 Apr 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 2A - 90 Madhukunj - 2022-23 - signed.pdf | 30 Apr 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 2A - 90 Madhukunj - 2023-24 - Signed.pdf | 30 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold 31 03 2023 - Signed.pdf | 30 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold 30 06 2023 - Signed.pdf | 30 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold 30 09 2023 - Signed.pdf | 30 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold 31 12 2023 - Signed.pdf | 30 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold 31 03 2024 - Signed.pdf | 30 Apr 2024 |
| Certificates of CA (Form 3)File: Form 3 - 90 MK - 31 12 2023.pdf | 29 Feb 2024 |
| Certificates of CA (Form 3)File: Madhukunj 30 06 2023.pdf | 27 Jan 2024 |
| Certificates of CA (Form 3)File: Madhukunj 30 09 2023.pdf | 27 Jan 2024 |
| Certificates of CA (Form 3)File: Madhukunj 31 12 2023.pdf | 27 Jan 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 June.pdf | 6 Jan 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 September.pdf | 6 Jan 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 December.pdf | 6 Jan 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 September.pdf | 6 Jan 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 December.pdf | 6 Jan 2024 |
| Details of encumbrances concerned to FinanceFile: Encumbrance Certificate - 90 Madhukunj.PDF | 7 Dec 2023 |
| Details of encumbrances concerned to LegalFile: Encumbrance Certificate - 90 Madhukunj.PDF | 7 Dec 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: 90 Madhukunj.pdf | 30 Sep 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Madhukunj F1 Mar 20.pdf | 13 Sep 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Madhukunj F1 Mar 21.pdf | 13 Sep 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Madhukunj F1 Dec 21-3.pdf | 13 Sep 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Madhukunj F1 Mar 22-4.pdf | 13 Sep 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Madhukunj F1 Jun 22-5.pdf | 13 Sep 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Madhukunj F1 Sep 22-6.pdf | 13 Sep 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Madhukunj F1 Dec 22-7.pdf | 13 Sep 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Madhukunj F1 Mar 23-8.pdf | 13 Sep 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Madhukunj F2 Mar 20-1.pdf | 13 Sep 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Madhukunj F2 Mar 21-2.pdf | 13 Sep 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Madhukunj F2 Dec 21-3.pdf | 13 Sep 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Madhukunj F2 Mar 22-4.pdf | 13 Sep 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Madhukunj F2 Jun 22-5.pdf | 13 Sep 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Madhukunj F2 Sep 22-6.pdf | 13 Sep 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Madhukunj F2 Dec 22-7.pdf | 13 Sep 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Madhukunj F2 Mar 23-8.pdf | 13 Sep 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Madhukunj F2 June 23-9.pdf | 13 Sep 2023 |
| Certificates of CA (Form 3)File: Form 3 - Madhukunj 31-03-2023.PDF | 12 Sep 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate 31-03-2023.pdf | 27 Jun 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - oct22.PDF | 21 Jun 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 90 Madhukunj_Dec22.pdf | 21 Jun 2023 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Annexure E FORM 4.PDF | 21 Jun 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 90 MADHUKUNJ.pdf | 2 Jun 2023 |
| Details of encumbrances concerned to FinanceFile: Declaration of CC.PDF | 16 Jan 2023 |
| Details of encumbrances concerned to LegalFile: Declaration of CC.PDF | 16 Jan 2023 |
| Declaration about Commencement CertificateFile: Declaration of CC.PDF | 16 Jan 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: 90Madhukunj SIGNED.pdf | 30 Sep 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 2 other registrations, which the RERA portal never shows together
- All 107 filed documents as one ZIP, foldered, with a manifest
Keep 90 Madhukunj on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bopodi
GREEN PARK
SANTOSH MHADEO ATOLE
AVALON CITY - C5 and C6
Classic Promoters and Builders Private Lim
MAYUR SKYLIFE
BUNTY HOMES
Avalon City - C2
Classic Promoters and Builders Private Lim
HORIZON HARMONY
RAMGEET DEVELOPERS
KATE RAMDARA
KATE RAMDARA DEVELOPERS
Builder: Gokhale Shelters LLP
Gokhale Shelters LLP has 3 registrations on MahaRERA, including RAHULKUNJ and 90 Madhukunj. Its filings disclose no earlier MahaRERA projects. Read the full track record.
Frequently asked questions
What are my rights if 90 Madhukunj is delayed beyond 31 Jan 2024?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of 90 Madhukunj?
The registered promoter entity is Gokhale Shelters LLP, a partnership as per the filing. Its GSTIN 27AAOFG7360H1Z1 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in 90 Madhukunj?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against 90 Madhukunj?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for 90 Madhukunj?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at 90 Madhukunj?
The professionals named in the filing: Architect: Siddharth Harishchandrakar; Architect: Mangesh Gotal; Engineer: J W Consultants; Engineer: Mahesh Mate; Chartered Accountant: CA SIDDHARTH SATCHIDANAND SMART. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in 90 Madhukunj?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback