Home / Browse projects / Pune, Maharashtra / 7 SKYE

Registered No litigation declared Others project

7 SKYE

By Swamisamarth Buildcorp LLP

RG-MH-80488 · RERA P52100076754 · Last updated on MahaRERA portal: 31 Aug 2026

Source: official MahaRERA filing

Red flags

  • Rs 3.46 crore secured on the land, in favour of IIFL HOME FINANCE LIMITED

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jun 2027Possession promisedno revision filed
6 of 22Construction stages doneacross 2 buildings; furthest along: Slabs of Super Structure, 90%
46 of 59Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 77 documents Report an error

7 SKYE is a Others project by Swamisamarth Buildcorp LLP in Pune, Maharashtra, registered with MahaRERA as P52100076754 on 25 Jun 2024. Possession is promised by 30 Jun 2027. 13 of the 59 units on this registration are recorded sold or booked, and 6 of 22 construction stages are filed complete.

At a glance

Project

  • Name7 SKYE
  • TypeOthers
  • Location
    • Near Manas Society
    • Dhayari
    • Dhayari (Part)
    • Haveli
    • Pune
    • 411041
  • Pincode411041
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100076754
  • ReraGenie IDRG-MH-80488

Builder

  • NameSwamisamarth Buildcorp LLP
  • Entity typePartnership
  • PartnersShrikant Shridharrao Gude, Babasaheb Chandrakant Kute, Yuvraj Tukaram Dangat, Sidram Shankar Jadhav, Ajay Vasant Jadhav, Kamlesh Bharat Pailwan, Dhananjay Tatyasaheb Patil

Key dates

this monthRegisteredJun 2024PromisedJun 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on25 Jun 2024
  • Promised completion30 Jun 2027
  • Revised completionNone
  • Buildings2 building records
  • Documents filed77 files

Current status

22%13 of 59 units booked
22.7%Work done, per cost certificate

Figures as on 31 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Wing ANA8748654
Wing BNA20055

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 31 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 90%.

Wing A52%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor80%
Slabs of Super Structure90%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks60%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Wing B35%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor80%
Slabs of Super Structure10%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 31 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed2

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots2
Closed/Covered2
BuildingClosed/CoveredTotal
Wing A11
Wing B11

Land and ownership6

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area2,400 sq m
Land owned byThe promoter, with other names on the file
Named landowners6
Encumbrance on the landDeclared present
Charge in favour ofIIFL HOME FINANCE LIMITED
Secured amountRs 3.46 crore
Declared on21 Apr 2026
LandownerVillageDistrict
Supreme Vision VenturesMarket YardPune
Shreyas Eknath KshirsagarMarket YardPune
Kavita Vaibhav DhokaPune (M Corp.)Pune
Jagdishkumar Dayaram ChaudhariDhayari (Part)Pune
Rajendrakumar Nathulal Chaudhari-Pali
Sachin PokaleDhayari (Part)Pune

Approvals and building plan

Sanctioning authorityPUNE MUNICIPLE CORPORATION
Permissible FSI8296.8
Proposed, not sanctioned3,698 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchJAYRAJ BUILDING S NO 50-22 AND 23 NEAR KASHIBAI NAVALE HOSPITAL, DHAYARI PHATA-NARHE ROAD PUNE 411
Estimated costRs 24.26 cr
Cost incurredRs 5.51 cr
Work done22.71%
BuildingWingEstimatedIncurred
Wing ANARs 11.53 crRs 5.51 cr
Wing BNARs 11.53 cr-
-NARs 1.20 cr-

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectANUJ GANGWAL
EngineerPRATIK KHALDE
EngineerDinesh Manjare
Chartered AccountantPRAVIN SALUNKE
Chartered AccountantJ P N R & ASSOCIATES
Chartered AccountantMANOJ P. BHANSALI & CO
PartnerRole in project
Swamisamarth Buildcorp LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 17 May 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 14 Jan 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 14 Jan 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 14 Jan 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Jun 2027

Documents filed77

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1 Architecture-Signed.pdf31 Aug 2026
Withdrawal Update Form 2File: FORM 2 Engg-Signed.pdf31 Aug 2026
Withdrawal Update Form 3File: FORM 3 CA-Signed_compressed.pdf31 Aug 2026
Withdrawal Update Form 1File: FORM 1.pdf29 Apr 2026
Withdrawal Update Form 2File: FORM 2.pdf29 Apr 2026
Withdrawal Update Form 3File: FORM 3.pdf29 Apr 2026
Withdrawal Update Form 1File: FORM 1.pdf30 Jan 2026
Withdrawal Update Form 2File: FORM 2.pdf30 Jan 2026
Withdrawal Update Form 3File: FORM 3 SIGNED.pdf30 Jan 2026
Form 5 (FY 2024-2025)File: Swamisamarth Buildcorp LLP - RERA AUDIT - FY2024-2025.pdf2 Jan 2026
Withdrawal Update Form 1File: Form 1.pdf25 Nov 2025
Withdrawal Update Form 2File: Form 2 Engg certificate .pdf25 Nov 2025
Withdrawal Update Form 3File: Form 3_144dpi_75%.pdf25 Nov 2025
Withdrawal Update Form 1File: FORM 1.pdf22 Nov 2025
Withdrawal Update Form 2File: Form 2 Engineer Certificate_144dpi_75%.pdf22 Nov 2025
Withdrawal Update Form 3File: Form 3_Signed_144dpi_75%.pdf22 Nov 2025
Withdrawal Update Form 1File: FORM 1.pdf11 Aug 2025
Withdrawal Update Form 2File: 231203_Eng_Certificate_7 SKYE_SSBLLP_page-0001.pdf11 Aug 2025
Withdrawal Update Form 3File: Form 3_CA Certificate(1)(2).pdf11 Aug 2025
Form 2A (FY 2024-2025)4 Jun 2025
Form 1File: FORM 1.pdf28 May 2025
Form 2File: FORM 2_compressed.pdf28 May 2025
Form 3File: Form 3.pdf28 May 2025
Form 1File: FORM 1.pdf28 May 2025
Form 2File: Form 2.pdf28 May 2025
Form 3File: Form 3.pdf28 May 2025
Form 1File: FORM 1.pdf28 May 2025
Form 2File: FORM 2.pdf28 May 2025
Form 3File: FORM 3.pdf28 May 2025
Form 1File: ARCHITECT CERTIFICATE.pdf28 May 2025
Form 2File: ENGINEER CERTIFICATE.pdf28 May 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD UNSOLD-SIGNNED.pdf28 May 2025
Form 3File: FORM 3_SIGNED_NEW_compressed.pdf28 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf21 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf21 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf21 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf17 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf17 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf17 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf17 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2_compressed.pdf17 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf17 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf17 Feb 2025
Other - LegalFile: DA_compressed-1.pdf6 Jun 2024
Other - LegalFile: DA_compressed-2.pdf6 Jun 2024
Other - LegalFile: DA_compressed-3.pdf6 Jun 2024
Other - LegalFile: 221004_14656-2022_DA_Pokle to Shreyas Kshirsagar (1).pdf5 Jun 2024
Other - LegalFile: 31955.pdf5 Jun 2024
Copy of the legal title reportFile: Title Certificate_Final.pdf17 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_CA Certificate(1)(2).pdf25 Apr 2024
Details of encumbrances concerned to FinanceFile: 240317_Financial Encumbrance Certificate_page-0001.pdf19 Mar 2024
Details of encumbrances concerned to LegalFile: 240317_Financial Encumbrance Certificate_page-0001.pdf19 Mar 2024
CERSAI detailsFile: cersai 123.pdf19 Mar 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Foem A.pdf19 Mar 2024
Deviation Report with respect to model copy of AgreementFile: DEVIATION OF MODEL FORM OF AGREEMENT_page-0001.pdf17 Feb 2024
Other - LegalFile: AUTHORITY LETTER_ 7 SKYE_page-0001.pdf17 Feb 2024
Details of encumbrances concerned to FinanceFile: 231204_Legal_Encumbrance Certificate_SSBLLP_page-0001.pdf9 Feb 2024
Details of encumbrances concerned to LegalFile: 231204_Legal_Encumbrance Certificate_SSBLLP_page-0001.pdf9 Feb 2024
Declaration about Commencement CertificateFile: 231204_declaration for CC_SSBLLP_page-0001.pdf9 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate for RERA_240122_page-0001.pdf9 Feb 2024
Proforma of Agreement for saleFile: Proforma of Agreement - Final Blank Draft.pdf9 Feb 2024
Proforma of Allotment letterFile: 231204_Model Allotment letter_SSBLLP_page-0001.pdf9 Feb 2024
Other - LegalFile: 230313_LLP Deed_compressed(1)-1-11.pdf9 Feb 2024
Other - LegalFile: 230313_LLP Deed_compressed(1)-12-22.pdf9 Feb 2024
Other - TechnicalFile: 240123_Undertaking_ANNEXURE A_no double registration -_page-0001.pdf24 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 231203_Eng_Certificate_7 SKYE_SSBLLP_page-0001.pdf16 Jan 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank Account Encumbrance Certificate.pdf16 Jan 2024
Layout approvalFile: Layout Sanction.pdf14 Jan 2024
Building plan approvalFile: 01_02.pdf14 Jan 2024
Building plan approvalFile: 02-02.pdf14 Jan 2024
PAN CardFile: PAN CARD.pdf14 Jan 2024
Copy of Layout Approval (in case of layout)File: Layout Sanction.pdf14 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: 01_02.pdf14 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: 02-02.pdf14 Jan 2024
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf14 Jan 2024
Declaration in FORM BFile: Form B_Legal Encumbrance Certificate.pdf14 Jan 2024
Deviation Report with respect to Allotment letterFile: Deviation Report on Allotment Letter.pdf14 Jan 2024

How this compares with Pune

22%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep 7 SKYE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Dhayari13,700+ in Pune

2 km7 SKYECompleted 49Lapsed / revoked 34Other 84Dot size: filed unitsN

Filed coordinates, straight-line distance. 167 registered projects within 2 km.

Builder: Swamisamarth Buildcorp LLP

Swamisamarth Buildcorp LLP has 1 registration on MahaRERA, including 7 SKYE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if 7 SKYE is delayed beyond 30 Jun 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of 7 SKYE?

The registered promoter entity is Swamisamarth Buildcorp LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in 7 SKYE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for 7 SKYE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at 7 SKYE?

The professionals named in the filing: Architect: ANUJ GANGWAL; Engineer: PRATIK KHALDE; Engineer: Dinesh Manjare; Chartered Accountant: PRAVIN SALUNKE; Chartered Accountant: J P N R & ASSOCIATES; Chartered Accountant: MANOJ P. BHANSALI & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in 7 SKYE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About 7 SKYE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save 7 SKYE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.