Home / Browse projects / Pune, Maharashtra / 7 BUSINESS BAY

Registered No litigation declared Others project

7 BUSINESS BAY

By SAAJ BUILDCON PRIVATE LIMITED

RG-MH-90429 · RERA P52100052938 · Last updated on MahaRERA portal: 13 Jun 2026

Source: official MahaRERA filing

Red flags

  • Possession 3 months past the filed date
  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jul 2026Possession promised3 months past this date
0 of 11Construction stages donefurthest along: Excavation, 0%
14 of 15Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 78 documents Report an error

7 BUSINESS BAY is a Others project by SAAJ BUILDCON PRIVATE LIMITED in Pune, Maharashtra, registered with MahaRERA as P52100052938 on 5 Oct 2023. Possession was promised by 30 Jul 2026 and is now 3 months past that date. The completion date has moved by 12 months from the original filing. 1 of the 15 units on this registration are recorded sold or booked, and 0 of 11 construction stages are filed complete.

At a glance

Project

  • Name7 BUSINESS BAY
  • TypeOthers
  • Location
    • Baner Road
    • Pallod Farms 02
    • Behind Mauli Petrol Pump
    • Baner
    • Haveli
    • Pune
    • 411045
  • Pincode411045
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100052938
  • ReraGenie IDRG-MH-90429

Builder

  • NameSAAJ BUILDCON PRIVATE LIMITED
  • Entity typeCompany
  • DirectorsKULDEEP SHRIRAM SAPRE, SHARDULI SAPRE

Key dates

3 months past promisethis monthRegisteredOct 2023First promiseJul 2025Revised toJul 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on5 Oct 2023
  • Promised completion30 Jul 2026
  • Revised completionRevised to 30 Jul 2026 (originally 31 Jul 2025)
  • Buildings1 building record
  • Documents filed78 files

Current status

7%1 of 15 units booked

Figures as on 13 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
7 BUSINESS BAYNA8001515

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 13 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 0%.

7 BUSINESS BAY: 0% average across the applicable activities

ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 13 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed132

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots132
Closed/Covered132

Land and ownership2

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area600 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on15 Jun 2026
LandownerVillageDistrict
Ashok Shrirang DarshaneBanerPune
Prakash Shrirang DarshaneBanerPune

Approvals and building plan

Sanctioning authorityPune Municipal Corporation
Permissible FSI2845.5
Proposed, not sanctioned2,846 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHIVAJINAGAR, PUNE 411005

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectManguesh Bhandekar
ArchitectPushan Limaye
EngineerAmol Murlidhar Ajalkar
Chartered AccountantPhule Wagh & Associates LLP
PartnerRole in project
SAAJ BUILDCON PRIVATE LIMITED-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100024806Jul 2025 → Jul 2026

Reason as filed by the promotera) Our project 7 BUSINESS BAY bearing Reg. No. P52100052938 is getting delayed due to two reasons, The first being, while excavation, the strata was extremely hard due to which it took lot of time to excavate the project land as well as water was found beneath the hard strata which slowed down the excavation process, thereby delaying the project progress. The second reason being we may have erred in estimating the initial completion date shortly by 5-6 months. b) We have already communicated the same to all our allottees in a transparent manner regarding this issue. c) Thereby as a preventive

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 31 Aug 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 24 Jan 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 24 Jan 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 24 Jan 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed78

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Form 1 Architects Certificate Q4 FY 2025-26.pdf13 Jun 2026
Form 2File: Form 2 Engineers Cartificate Q4 FY 2025-26.pdf13 Jun 2026
Form 3File: Q4 FY 2025-26 7BB FORM 3 Chartered Accountant Certificate.pdf13 Jun 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Unsold Inventory Q4 FY 2025-26 7BB.pdf13 Jun 2026
Form 1File: Form 1 Architect cartificate Q2 FY 2025-26.pdf13 Jun 2026
Form 2File: Form 2 Engineers Cartificate Q2 FY 2025-26.pdf13 Jun 2026
Form 3File: 7BB FORM 3 Chartered Accountant Certificate Q2 FY 2025-26.pdf13 Jun 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Unsold Inventory Q2 FY 2025-26.pdf13 Jun 2026
Form 1File: Form 1 Architects Certificate Q3 FY 2025-26.pdf13 Jun 2026
Form 2File: Form 2 Engineers Cartificate Q3 FY 2025-26.pdf13 Jun 2026
Form 3File: 7BB FORM 3 Chartered Accountant Certificate Q3 FY 2025-26.pdf13 Jun 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Unsold Inventory Declaration Q3 FY 2025-26.pdf13 Jun 2026
Form 1File: Form 1 Q1 FY 2025-26.pdf19 Jul 2025
Form 2File: Form 2 Q1 FY 2025-26.pdf19 Jul 2025
Form 3File: 7BB FORM 3 Chartered Accountant Certificate 30062025.pdf19 Jul 2025
Disclosure of Sold and Booked InventoryFile: Inventory Q1 FY 2025-26.pdf19 Jul 2025
Form 1File: No Progress Decleration Q4 2024-25.pdf3 Jun 2025
Form 2File: Form 2 Engineer Certificate.pdf3 Jun 2025
Form 3File: Form 3 Chartered Accountant Certificate 31032025.pdf3 Jun 2025
Disclosure of Sold and Booked InventoryFile: Draft Inventory Declaration format.pdf3 Jun 2025
Form 1File: No Progress Decleration Q4 2024-25.pdf3 Jun 2025
Form 2File: Form 2 Engineer Certificate.pdf3 Jun 2025
Form 3File: Form 3 Chartered Accountant Certificate 31032025.pdf3 Jun 2025
Disclosure of Sold and Booked InventoryFile: Draft Inventory Declaration format.pdf3 Jun 2025
Form 2A (FY 2024-2025)File: Form 2A Saaj Buildcon.pdf3 Jun 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 7BB FORM 3 Chartered Accountant Certificate 31032025.pdf28 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate.pdf28 Apr 2025
Disclosure of sold/ booked inventoryFile: Draft Inventory Declaration format.pdf28 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 scan q3 saaj 7bb.pdf20 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A-FY 2023-24.pdf18 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A-FY 2023-24.pdf18 Oct 2024
Declaration in FORM BFile: Form B Saaj Buildcon.pdf17 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect certificate.pdf17 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate (1).pdf17 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 7BB FORM 3 Chartered Accountant Certificate 30092024.pdf9 Oct 2024
Disclosure of sold/ booked inventoryFile: Draft Inventory Declaration format.pdf9 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORMAT Form 5 - CA Certificate FY 23-24.pdf9 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 7BB FORM 3 Chartered Accountant Certificate 31032024.pdf15 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 7BB FORM 3 Chartered Accountant Certificate 31032024.pdf14 May 2024
Declaration about Commencement CertificateFile: Format D.pdf10 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate.pdf10 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Enginner Certificate.pdf10 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed - Form 3.pdf31 Jan 2024
Layout approvalFile: plan 01-03.pdf24 Jan 2024
Building plan approvalFile: plan 02-03.pdf24 Jan 2024
Building plan approvalFile: plan 03-03.pdf24 Jan 2024
Copy of Layout Approval (in case of layout)File: plan 01-03.pdf24 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: plan 02-03.pdf24 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: plan 03-03.pdf24 Jan 2024
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf24 Jan 2024
Copy of the legal title reportFile: RERA_FORM-A-SEARCH REPORT-310823.pdf31 Aug 2023
Proforma of Agreement for saleFile: Revised Daviation model form of Agreement (1) 190823.pdf31 Aug 2023
Deviation Report with respect to model copy of AgreementFile: Deviation Report of sale agreement 18082023.pdf31 Aug 2023
Copy of the legal title reportFile: Format A legal Title Report.pdf29 Aug 2023
Proforma of Agreement for saleFile: Revised Daviation model form of Agreement (1) 190823.pdf29 Aug 2023
Deviation Report with respect to model copy of AgreementFile: Deviation Report of sale agreement 18082023.pdf29 Aug 2023
Layout approvalFile: Sanctioned Plan 1.pdf22 Aug 2023
Copy of Layout Approval (in case of layout)File: Sanctioned Plan 1.pdf22 Aug 2023
Proforma of Agreement for saleFile: Revised Daviation model form of Agreement (1) 190823.pdf22 Aug 2023
Deviation Report with respect to model copy of AgreementFile: Deviation of AFS_compressed.pdf22 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed Form 3.pdf16 Aug 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: declaration about separate bank account.pdf31 Jul 2023
Building plan approvalFile: Sanctioned Plan 2.pdf26 Jul 2023
Copy of the legal title reportFile: Final Search Report-Baner.pdf26 Jul 2023
Details of encumbrances concerned to FinanceFile: SBPL_Self Declaration Finance.pdf26 Jul 2023
Details of encumbrances concerned to FinanceFile: SBPL_Self Declaration Legal.pdf26 Jul 2023
Details of encumbrances concerned to LegalFile: SBPL_Self Declaration Finance.pdf26 Jul 2023
Details of encumbrances concerned to LegalFile: SBPL_Self Declaration Legal.pdf26 Jul 2023
Building Plan Approval / NA Order for plotted developmentFile: Sanctioned Plan 2.pdf26 Jul 2023
Commencement Certificates / NA Order for plotted developmentFile: C C- Baner 7 Business Bay_compressed.pdf26 Jul 2023
Declaration about Commencement CertificateFile: SBPL_Declaration about Commencement.pdf26 Jul 2023
Declaration in FORM BFile: Affidavit- Saaj Buildcon.pdf26 Jul 2023
CERSAI detailsFile: SBPL_Undertaking for Creation of Security.pdf26 Jul 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: SBPL_Disclosure of Interest_KS.pdf26 Jul 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: SBPL_Disclosure of Interest_SS.pdf26 Jul 2023
Proforma of Allotment letterFile: SBPL_Allotment Letter.pdf26 Jul 2023
Deviation Report with respect to Allotment letterFile: SBPL_Deviation Report to Allotment.pdf26 Jul 2023
PAN CardFile: PAN Card - Saaj Buildcon Pvt Ltd.pdf17 Jul 2023

How this compares with Pune

7%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 12 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep 7 BUSINESS BAY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Pallod Farms 02, Behind Mauli Petrol Pump13,700+ in Pune

2 km7 BUSINESS BAYCompleted 80Lapsed / revoked 29Other 117Dot size: filed unitsN

Filed coordinates, straight-line distance. 226 registered projects within 2 km.

Builder: SAAJ BUILDCON PRIVATE LIMITED

SAAJ BUILDCON PRIVATE LIMITED has 1 registration on MahaRERA, including 7 BUSINESS BAY. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if 7 BUSINESS BAY is delayed beyond 30 Jul 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of 7 BUSINESS BAY?

The registered promoter entity is SAAJ BUILDCON PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in 7 BUSINESS BAY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for 7 BUSINESS BAY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at 7 BUSINESS BAY?

The professionals named in the filing: Architect: Manguesh Bhandekar; Architect: Pushan Limaye; Engineer: Amol Murlidhar Ajalkar; Chartered Accountant: Phule Wagh & Associates LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in 7 BUSINESS BAY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About 7 BUSINESS BAY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save 7 BUSINESS BAY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.