Home / Browse projects / Pune, Maharashtra / 57 ELEVATE

Registered No litigation declared Residential / Group Housing project

57 ELEVATE

By ESSEN VENKATESH LLP

RG-MH-99318 · RERA P52100049293 · Last updated on MahaRERA portal: 24 Jul 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 12 months
  • 1 extension taken
  • Rs 22.00 crore secured on the land, in favour of Bhagawan Peddawad

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedmoved 12 months from the original
15 of 33Construction stages doneacross 3 buildings; furthest along: Slabs of Super Structure, 83%
147 of 345Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 145 documents Report an error

57 ELEVATE is a Residential / Group Housing project by ESSEN VENKATESH LLP in Pune, Maharashtra, registered with MahaRERA as P52100049293 on 7 Feb 2023. Possession is promised by 31 Dec 2027. The completion date has moved by 12 months from the original filing. 198 of the 345 units on this registration are recorded sold or booked, and 15 of 33 construction stages are filed complete.

At a glance

Project

  • Name57 ELEVATE
  • TypeResidential / Group Housing
  • Location
    • WAKAD
    • Mulshi
    • Pune
    • 411057
  • Pincode411057
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100049293
  • ReraGenie IDRG-MH-99318

Builder

  • NameESSEN VENKATESH LLP
  • Entity typePartnership
  • PartnersNARENDRA BHIMSEN AGARWAL, SATISH BHIMSEN AGARWAL, DEEPALI ABHAY KHODE, BHAGWAN VENKATRAO PEDDAWAD, SUHAS BHAGWAN PEDDAWAD, PRAKASH RAMCHANDRA AGARWAL

Key dates

this monthRegisteredFeb 2023First promiseDec 2026Revised toDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on7 Feb 2023
  • Promised completion31 Dec 2027
  • Revised completionRevised to 31 Dec 2027 (originally 31 Dec 2026)
  • Buildings3 building records
  • Documents filed145 files

Current status

57%198 of 345 units booked
50.6%Work done, per cost certificate

Figures as on 24 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WING - INA34301170117
WING - JNA34301110111
WING - KNA34301170117

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 24 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

15 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Slabs of Super Structure, at 83%.

WING - I68%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure83%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises58%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.40%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.16%
WING - J68%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure83%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises58%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.40%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.16%
WING - K68%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure83%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises58%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.40%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.16%

Progress on shared amenities15

As on 24 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed724

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots724
Closed/Covered724
BuildingClosed/CoveredTotal
WING - I241241
WING - J242242
WING - K241241

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area17,007 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofBhagawan Peddawad
Secured amountRs 22.00 crore
CERSAI search filedYes
Declared on19 May 2026

Approvals and building plan

Sanctioning authorityPimpri Chinchwad Municipal Corporation
Permissible FSI38044.78
Proposed, not sanctioned38,045 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchWAKAD
Estimated costRs 145.00 cr
Cost incurredRs 73.31 cr
Work done50.56%
BuildingWingEstimatedIncurred
WING - INARs 43.34 crRs 24.44 cr
WING - JNARs 43.34 crRs 24.44 cr
WING - KNARs 43.34 crRs 24.44 cr
-NARs 14.99 cr-

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectGIRISH BRAHME
ArchitectSameer Valimbe
EngineerG A BHILARE
EngineerRohini Badgujar
EngineerSANDEEP MALI
Chartered AccountantPravin Pise & Associates
Chartered AccountantVaibhav S Bhise
PartnerRole in project
ESSEN VENKATESH LLP-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA03082622000Dec 2026 → Dec 2027

Reason as filed by the promoterRespected Sir/Madam, We, the promoters of 57 ELEVATE (Reg. No. P52100049293), respectfully seek extension of project registration. The current validity is till 30/12/2026, and we request extension till 31/12/2027 to enable completion of balance work and procurement of the Occupation Certificate. Grounds for Extension War & Material Shortage - The Asia-wide war disrupted supply of Ready Mix Concrete (RMC), causing delays and cost escalation. Finishing Materials - Tiles and allied materials were unavailable due to supply chain disruptions. Fuel & Transport Costs - Sharp rise in fuel prices incre

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 1 Dec 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 1 Apr 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 1 Apr 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 23 Nov 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed145

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 145 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Declaration and undertaking (Annexure A)File: Annexure A.pdf24 Jul 2026
Withdrawal Update Form 1File: Architect certificate - 57 elevate.pdf22 Jul 2026
Withdrawal Update Form 2File: Engineer certificate 57 elevate.pdf22 Jul 2026
Withdrawal Update Form 3File: FORM-3 57 Elevate_11zon.pdf22 Jul 2026
Withdrawal Update Form 1File: Architect Certificate 57 Elevant.pdf12 Jul 2026
Withdrawal Update Form 2File: Engineers Certificate 57 Elevant.pdf12 Jul 2026
Withdrawal Update Form 3File: form 3.pdf12 Jul 2026
Form 2A (FY 2025-2026)File: Form 2A-2025-26 (1).pdf13 Jun 2026
Withdrawal Update Form 1File: Architect Certificate 57 Elevant.pdf28 Apr 2026
Withdrawal Update Form 2File: Engineers Certificate 57 Elevant.pdf28 Apr 2026
Withdrawal Update Form 3File: Form-3 for Cost Correction (4)_11zon.pdf28 Apr 2026
Form 5 (FY 2024-2025)File: Form 5- 24-25 (1).pdf8 Apr 2026
Layout approvalFile: Main layout 57 elevate.pdf1 Apr 2026
Building plan approvalFile: SHEET NO 02_compressed (1).pdf1 Apr 2026
Building plan approvalFile: SHEET NO 03_compressed (1) (1).pdf1 Apr 2026
Building plan approvalFile: SHEET NO 04_compressed (1).pdf1 Apr 2026
Building plan approvalFile: SHEET NO 05_compressed (1).pdf1 Apr 2026
Building plan approvalFile: SHEET NO 06 (1)_compressed (1).pdf1 Apr 2026
Building plan approvalFile: SHEET NO 07_compressed (1).pdf1 Apr 2026
Building plan approvalFile: SHEET NO 08_compressed.pdf1 Apr 2026
Building plan approvalFile: SHEET NO 09_compressed (1).pdf1 Apr 2026
Form 1File: Form 1 Elevate.pdf31 Mar 2026
Form 2File: Form 2 elevate.pdf31 Mar 2026
Form 3File: Form 3 elevate.pdf31 Mar 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold elevate.pdf31 Mar 2026
Form 1File: Form 1 Elevate.pdf31 Mar 2026
Form 2File: Form 2 elevate.pdf31 Mar 2026
Form 3File: Form 3 elevate.pdf31 Mar 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold elevate.pdf31 Mar 2026
Form 5 (FY 2023-2024)File: 57 Elevate (1).pdf31 Mar 2026
Withdrawal Update Form 1File: WU FORM 1_rotated (1) (1).pdf30 Mar 2026
Withdrawal Update Form 2File: WU FORM 2.pdf30 Mar 2026
Withdrawal Update Form 3File: Form-3 for Cost Correction (4)_11zon.pdf30 Mar 2026
Withdrawal Update Form 1File: WU FORM 1_rotated (1) (1).pdf30 Jan 2026
Withdrawal Update Form 2File: WU FORM 2.pdf30 Jan 2026
Withdrawal Update Form 3File: CA Certificate (3).pdf30 Jan 2026
Form 2A (FY 2022-2023)File: Form-2A 2022-23.pdf18 Dec 2025
Form 2A (FY 2023-2024)File: Form-2A 2023-24.pdf18 Dec 2025
Form 2A (FY 2024-2025)File: Form-2A 2024-25.pdf18 Dec 2025
Form 1File: Architect certificate (14) (1).pdf13 Oct 2025
Form 2File: Engineer's Certificate.pdf13 Oct 2025
Form 3File: CA Certificate (2).pdf13 Oct 2025
Disclosure of Sold and Booked InventoryFile: Sold & Unsold.pdf13 Oct 2025
Form 5 (FY 2022-2023)File: F5 22-23.pdf23 Sep 2025
Form 1File: form 1 (29).pdf16 Jul 2025
Form 2File: form 2 July 2025 (1).pdf16 Jul 2025
Form 3File: form 3 (22).pdf16 Jul 2025
Disclosure of Sold and Booked InventoryFile: sold unsold (5).pdf16 Jul 2025
Form 1File: 1.pdf29 Jun 2025
Form 2File: 2.pdf29 Jun 2025
Form 3File: 3.pdf29 Jun 2025
Disclosure of Sold and Booked InventoryFile: sold-unsold.pdf29 Jun 2025
Form 1File: 1.pdf29 Jun 2025
Form 2File: 2.pdf29 Jun 2025
Form 3File: 3.pdf29 Jun 2025
Disclosure of Sold and Booked InventoryFile: sold-unsold.pdf29 Jun 2025
Form 1File: 1.pdf29 Jun 2025
Form 2File: 2.pdf29 Jun 2025
Form 3File: 3.pdf29 Jun 2025
Disclosure of Sold and Booked InventoryFile: sold-unsold.pdf29 Jun 2025
Form 1File: 1.pdf29 Jun 2025
Form 2File: 2.pdf29 Jun 2025
Form 3File: 3.pdf29 Jun 2025
Disclosure of Sold and Booked InventoryFile: sold-unsold.pdf29 Jun 2025
Form 1File: 1.pdf29 Jun 2025
Form 2File: 2.pdf29 Jun 2025
Form 3File: 3.pdf29 Jun 2025
Disclosure of Sold and Booked InventoryFile: sold-unsold.pdf29 Jun 2025
Form 1File: 1.pdf29 Jun 2025
Form 2File: 2.pdf29 Jun 2025
Form 3File: 3.pdf29 Jun 2025
Disclosure of Sold and Booked InventoryFile: sold-unsold.pdf29 Jun 2025
Form 1File: Architech's Certificate_ With Sign.pdf29 Jun 2025
Form 2File: Engineers Certificate_Q-3.pdf29 Jun 2025
Form 3File: CA Certificate_ Q-3 With Sign.pdf29 Jun 2025
Disclosure of Sold and Booked InventoryFile: SOLD DEC 24 (1).pdf29 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect's Certificate Q-4.pdf21 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3_CA Certificate (1).pdf21 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate.pdf21 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory (1).pdf21 Apr 2025

How this compares with Pune

57%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 12 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep 57 ELEVATE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near WAKAD13,700+ in Pune

Builder: ESSEN VENKATESH LLP

ESSEN VENKATESH LLP has 1 registration on MahaRERA, including 57 ELEVATE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if 57 ELEVATE is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of 57 ELEVATE?

The registered promoter entity is ESSEN VENKATESH LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in 57 ELEVATE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for 57 ELEVATE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at 57 ELEVATE?

The professionals named in the filing: Architect: GIRISH BRAHME; Architect: Sameer Valimbe; Engineer: G A BHILARE; Engineer: Rohini Badgujar; Engineer: SANDEEP MALI; Chartered Accountant: Pravin Pise & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in 57 ELEVATE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About 57 ELEVATE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save 57 ELEVATE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.