ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai Suburban, Maharashtra / 56 PARK AVENUE

Registered No litigation declared Residential / Group Housing project

56 PARK AVENUE

By KRISHANG INFRA PRIVATE LIMITED

RG-MH-06077 · RERA P51800052268 · Last updated on MahaRERA portal: 4 Aug 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 24 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 24 months from the original
5 of 11Construction stages donefurthest along: Installation of Lifts, 96%
23 of 37Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 48 documents Report an error

56 PARK AVENUE is a Residential / Group Housing project by KRISHANG INFRA PRIVATE LIMITED in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800052268 on 9 Aug 2023. Possession is promised by 31 Dec 2026. The completion date has moved by 24 months from the original filing. 14 of the 37 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete.

At a glance

Project

  • Name56 PARK AVENUE
  • TypeResidential / Group Housing
  • Location
    • AT LALLUBHAI ROAD
    • VILE PARLE (WEST)
    • Vileparle
    • Andheri
    • Mumbai Suburban
    • 400056
  • Pincode400056
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800052268
  • ReraGenie IDRG-MH-06077

Builder

  • NameKRISHANG INFRA PRIVATE LIMITED
  • Entity typeCompany
  • DirectorsDEVASHISH PRADEEP RAVAL, RAJU HARISH RAVAL

Key dates

this monthRegisteredAug 2023First promiseDec 2024Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on9 Aug 2023
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 31 Dec 2024)
  • Buildings1 building record
  • Documents filed48 files

Current status

38%14 of 37 units booked
80.1%Work done, per cost certificate

Figures as on 4 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
56 PARK AVENUENA111037037

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 4 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Installation of Lifts, at 96%.

56 PARK AVENUE: 80% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.94%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.96%

Progress on shared amenities15

As on 4 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes95%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes85%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes85%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed28

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots28
Closed/Covered28

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area920 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on23 Jul 2025
LandownerVillageDistrict
HIMANSHU MANDAR CO-OPERATIVE HOUSING SOCIETY LTDVileparleMumbai Suburban

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI1921.76
Proposed, not sanctioned1,922 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchVile Parle West
Estimated costRs 31.83 cr
Cost incurredRs 25.50 cr
Work done80.12%
BuildingWingEstimatedIncurred
56 PARK AVENUENARs 26.01 crRs 21.50 cr
-NARs 5.82 crRs 4.00 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectUMESH BHATT
EngineerDwijen Bhatt
Engineermohammed moosa yunus mansuri
Chartered AccountantNEHALI & CO
PartnerRole in project
KRISHANG INFRA PRIVATE LIMITED-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800027353Dec 2024 → Dec 2025

Reason as filed by the promoterIn light of this development, we intend to utilise the additional FSI as per the new guidelines. To facilitate this process and complete the requisite formalities, we humbly request an extension of I 2 months. This extension will allow us to: 1. Apply for and secure the additional FSI under the revised DCPR. 2. Complete the remaining construction

EA17022619863Dec 2024 → Dec 2026

Reason as filed by the promoterWe, Krishang Infra Pvt. Ltd. are the promoters of the real estate project known as "56 Park Avenue, Himanshu Mandar CHSL" bearing Maha RERA Registration No. P51800052268.We would like to respectfully bring to your attention that the project has encountered certain unforeseen technical challenges that have adversely impacted the originally proposed timelines for completion. We wish to place on record the following reasons for the delay:1. Delay in Statutory Clearances/Utility Approvals The redesigning and revised approvals of the plans had to be procured from BMC, and other government authoriti

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 8 Jun 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 8 Jun 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 8 Jun 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 13 Jul 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed48

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: ARCHITECT CERTIFICATE FORM 1.pdf4 Aug 2026
Withdrawal Update Form 2File: output (1).pdf4 Aug 2026
Withdrawal Update Form 3File: CA form 3.pdf4 Aug 2026
Withdrawal Update Form 1File: form 1.pdf4 May 2026
Withdrawal Update Form 2File: form 2 (2).pdf4 May 2026
Withdrawal Update Form 3File: form 3.pdf4 May 2026
Withdrawal Update Form 1File: form 1 (architect certificate) with signatures (1).pdf16 Feb 2026
Withdrawal Update Form 2File: form 2 engineer certificate (2).pdf16 Feb 2026
Withdrawal Update Form 3File: Revised CA certificate form 3.pdf16 Feb 2026
Withdrawal Update Form 1File: form 1.pdf13 Feb 2026
Withdrawal Update Form 2File: form 2.pdf13 Feb 2026
Withdrawal Update Form 3File: form 3.pdf13 Feb 2026
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT'S CERTIFICATE.pdf15 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed_CA Certificate 56 park avenue deva ashish raval mar'25.pdf15 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ANNEXURE B ( ENGINEER'S CERTIFICATE).pdf15 Apr 2025
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD BOOKED INVENTORY BUILDING WISE PLOT.pdf15 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: ANNEXURE A ( Site supervisor's certificate).pdf15 Apr 2025
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD BOOKED INVENTORY.pdf17 Mar 2025
Declaration in FORM BFile: Form B.pdf10 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf28 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 1.pdf28 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Signed 56 park avenue form 5 23-24.pdf24 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf20 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed CA Certificate 56 park avenue deva ashish raval sept 24.pdf15 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf18 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: form 2A 23-24.pdf18 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf21 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: form 2A.pdf16 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Adobe Scan 02 Aug 2023.pdf2 Aug 2023
Commencement Certificates / NA Order for plotted developmentFile: 2379527-FurtherCC-signed.pdf13 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RESigned CA Certificate 56 park avenue deva ashish raval reg.pdf13 Jul 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: DECLARATION OF SEPARATE BANK ACCOUNT FOR REAL ESTATE PROJECTS.pdf13 Jul 2023
Deviation Report with respect to Allotment letterFile: no deviation allotment.pdf9 Jun 2023
Deviation Report with respect to model copy of AgreementFile: deviation agreement (1).pdf9 Jun 2023
Layout approvalFile: Drawing.pdf8 Jun 2023
Building plan approvalFile: 2304799Amendletter_signed.pdf8 Jun 2023
PAN CardFile: KRISHANG INFRA PRIVATE LIMITED PAN CARD (1).pdf8 Jun 2023
Copy of the legal title reportFile: TITLE REPORT FOR RERA HIMANSHU MANDAR.pdf8 Jun 2023
Details of encumbrances concerned to FinanceFile: No Encumbrance Self Declaration 56Park Avenue RERA.pdf8 Jun 2023
Details of encumbrances concerned to LegalFile: No Encumbrance Self Declaration 56Park Avenue RERA.pdf8 Jun 2023
Copy of Layout Approval (in case of layout)File: Drawing.pdf8 Jun 2023
Building Plan Approval / NA Order for plotted developmentFile: 2304799Amendletter_signed.pdf8 Jun 2023
Declaration about Commencement CertificateFile: CC Covering Letter 56 Park Avenue RERA .pdf8 Jun 2023
Declaration in FORM BFile: FORM B 56Park Avenue RERA .pdf8 Jun 2023
CERSAI detailsFile: CERSAI Declaration 56 Park Avenue RERA .pdf8 Jun 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: ANNEXURE A DOI.pdf8 Jun 2023
Proforma of Allotment letterFile: ALLOTMENT LETTER FINAL (9).pdf8 Jun 2023
Proforma of Agreement for saleFile: RERA_Agreement_for_Sale_of_Flat (1) (1) (1) (1).pdf8 Jun 2023

How this compares with Mumbai Suburban

38%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 24 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep 56 PARK AVENUE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near VILE PARLE (WEST)6,700+ in Mumbai Suburban

2 km56 PARK AVENUECompleted 171Lapsed / revoked 110Other 169Dot size: filed unitsN

Filed coordinates, straight-line distance. 450 registered projects within 2 km.

Builder: KRISHANG INFRA PRIVATE LIMITED

KRISHANG INFRA PRIVATE LIMITED has 1 registration on MahaRERA, including 56 PARK AVENUE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if 56 PARK AVENUE is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of 56 PARK AVENUE?

The registered promoter entity is KRISHANG INFRA PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in 56 PARK AVENUE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for 56 PARK AVENUE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at 56 PARK AVENUE?

The professionals named in the filing: Architect: UMESH BHATT; Engineer: Dwijen Bhatt; Engineer: mohammed moosa yunus mansuri; Chartered Accountant: NEHALI & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in 56 PARK AVENUE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About 56 PARK AVENUE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save 56 PARK AVENUE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.