Home / Browse projects / Mumbai Suburban, Maharashtra / 55 CORPORATE AVENUE BUILDING NO 2

Registered No litigation declared Mixed project

55 CORPORATE AVENUE BUILDING NO 2

By THE CANNONADE CONSTRUCTION COMPANY PVT LTD

RG-MH-26317 · RERA P51800006324 · Last updated on MahaRERA portal: 24 Feb 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 60 months
  • 4 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 60 months from the original
11 of 11Construction stages doneevery applicable stage filed complete
40 of 60Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 104 documents Report an error

55 CORPORATE AVENUE BUILDING NO 2 is a Mixed project by THE CANNONADE CONSTRUCTION COMPANY PVT LTD in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800006324 on 14 Aug 2017. Possession is promised by 30 Dec 2026. The completion date has moved by 60 months from the original filing. 20 of the 60 units on this registration are recorded sold or booked, and 11 of 11 construction stages are filed complete.

At a glance

Project

  • Name55 CORPORATE AVENUE BUILDING NO 2
  • TypeMixed
  • Location
    • SAKIVIHAR ROAD
    • TUNGVE
    • Kurla
    • Mumbai Suburban
    • 400072
  • Pincode400072
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800006324
  • ReraGenie IDRG-MH-26317

Builder

  • NameTHE CANNONADE CONSTRUCTION COMPANY PVT LTD
  • Entity typeCompany
  • CINU70101MH1987PTC044594
  • ChairpersonNARENDRA VISHWAMITRA BHATIA
  • Managing DirectorAVINASH NARENDRA BHATIA
  • Declared earlier projects1 →

Key dates

this monthRegisteredAug 2017First promiseDec 2021Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on14 Aug 2017
  • Promised completion30 Dec 2026
  • Revised completionRevised to 30 Dec 2026 (originally 30 Dec 2021)
  • Buildings1 building record
  • Documents filed104 files

Current status

33%20 of 60 units booked
48.9%Work done, per cost certificate

Figures as on 24 Feb 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
55 CORPORATE AVENUE BUILDING NO 2NA111106060

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 24 Feb 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 11 construction stages are filed complete.

55 CORPORATE AVENUE BUILDING NO 2: 100% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 24 Feb 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes100%

Parking filed66

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots66
Open Space66

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area5,857 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on24 Jun 2025

Approvals and building plan

Sanctioning authorityMUNICIPAL CORPORATION OFGREATER MUMBAI
Permissible FSI4720.08
Proposed, not sanctioned4,030 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch001/112 A WING SUNDER VILLA S V ROAD SANTACRUZ WEST MUMBAI 400 054
Estimated costRs 90.32 cr
Cost incurredRs 44.14 cr
Work done48.87%
BuildingWingEstimatedIncurred
55 CORPORATE AVENUE BUILDING NO 2NARs 45.16 crRs 22.07 cr
-NARs 45.16 crRs 22.07 cr

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSWAPNIL SAWANR
EngineerMR UMESH JOSHI PARTNER J W CONSUTANTS LLP
Chartered AccountantARUN KOCCHAR
PartnerRole in project
THE CANNONADE CONSTRUCTION COMPANY PVT LTD-

Extensions applied for4

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800015237Dec 2021 → Dec 2024

Reason as filed by the promoterProject is constructed in full. All Development work is also completed. However Final Occupancy Certificate from MCGM ( Approval Authority ) is yet to get. We require further time to receive OC , Form Association of Allottees and complete conveyance procedures

EXT51800012678Dec 2021 → Dec 2022

Reason as filed by the promoterImmediately thereafter COVID set in whereby everything was in a lockdown stage and our building was selected by the Municipal Corporation of Greater Mumbai for taking over the building as is where is basis for temporary accommodation for labours in view of pandemic of Corona COVID - 19 by their Order bearing No. CE/4248/BPES/AL DATED 31.03.2020. Now structure is handed back to us and project is completed in full. We require some time to complete OC formalities and handover

EXT51800027266Dec 2021 → Dec 2025

Reason as filed by the promoterWe had completed entire development work. However after completion Air Port Authority of India has directed us to demolish overhead water tank and reduce the height of structure. Hence we had started demolition of water tank and redesigning of the same. This work will take some time. After completion of this change we will apply for Occupancy Certificate and then proceed for Society Formation and Handover procedures. We need some time for this.

EA10012619394Dec 2021 → Dec 2026

Reason as filed by the promoterwe had completed our project in full. As per direction from Airport Authority we had also made necessary changes and applied for Air Port Authority NOC which is mandatory for OC. We will apply for OC once Airport Authority provides NOC. We also had given possession to customers for fit outs. We need time to get OC and complete society formation as well as Handover process.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 29 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 29 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 29 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 29 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Dec 2026

Documents filed104

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 104 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: form 1.pdf24 Feb 2026
Withdrawal Update Form 2File: FORM 2 CANNONADE.pdf24 Feb 2026
Withdrawal Update Form 3File: Annexure D - Form 3.pdf24 Feb 2026
Withdrawal Update Form 1File: arch.pdf10 Nov 2025
Withdrawal Update Form 2File: FORM 2 CANNONADE.pdf10 Nov 2025
Withdrawal Update Form 3File: Form 3 Cannonade - Signed.pdf10 Nov 2025
Form 1File: fORM 1.pdf24 Jun 2025
Form 2File: fORM 2.pdf24 Jun 2025
Form 3File: form 3.pdf24 Jun 2025
Disclosure of Sold and Booked InventoryFile: SOLD.pdf24 Jun 2025
Declaration in FORM BFile: FORM B - CANNONADE_0001.pdf13 Mar 2025
Certificates of CA (Form 3)File: REVISED FORM 3 - SANTOGEN_0001_compressed.pdf22 Jan 2025
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD - UNSOLD INVENTORY_0001.pdf22 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: CANN FORM 5_0001.pdf22 Jan 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: SANTOGEN - FORM 01.pdf16 Jan 2025
Certificates of CA (Form 3)File: FORM - 3_0001_compressed.pdf16 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: SANTOGEN - FORM 2A_compressed.pdf16 Jan 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RERA Form 1 .pdf26 Apr 2024
Certificates of CA (Form 3)File: SANOGEN - FORM 3_compressed.pdf26 Apr 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: RAJA BUILDERS FORM 5 781.pdf13 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: CANNONADE - FORM 5.pdf13 Mar 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: CANNONADE - FORM 3_compressed.pdf2 Feb 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1.pdf2 Feb 2024
Certificates of CA (Form 3)File: CANNONADE - FORM 3_compressed.pdf2 Feb 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCH .pdf20 Nov 2023
Certificates of CA (Form 3)File: Form-3_compressed.pdf20 Nov 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 BLDG 1.pdf27 Jul 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 BLDG 2.pdf27 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A.pdf27 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A.pdf27 Jul 2023
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD INVENTORY APRIL 23.pdf1 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: FORM-5 18-19.pdf1 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM-5 -19-20.pdf1 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM-5 - 20-21.pdf1 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM - 5- 21-22.pdf1 Mar 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RERA Form 1 Q3.pdf25 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Site Superviser Certificate Q3 22-23.pdf25 Feb 2023
Certificates of CA (Form 3)File: FORM 3 - SANTOGEN - CANNONADE_compressed.pdf25 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: FORM-5 - SANTOGEN - APRIL 2018 TO MARCH 2019_0001.pdf21 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM-5 - SANTOGEN - APRIL 2019 TO MARCH 2020_0001.pdf21 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM-5 - SANTOGEN - APRIL 2020 TO MARCH 2021_0001.pdf21 Feb 2023
Certificates of CA (Form 5)File: FORM 5 CANN_0001.pdf8 Oct 2022
CERSAI detailsFile: CERSAI REPORT.pdf6 Oct 2022
Certificates of CA (Form 3)File: CANN CA CERTIFICATE FORM 3 - RERA_compressed.pdf6 Oct 2022
Declaration about Commencement CertificateFile: DECLARATION CC.pdf3 Oct 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM2 A.pdf3 Oct 2022
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD INVENTORY.pdf3 Oct 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCH Q1.pdf30 Sep 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: CANN - Architect Certificate - 1.pdf7 Feb 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: CANN - Architect Certificate - 2.pdf7 Feb 2019
Certificates of CA (Form 5)File: CANN - CA Certificate - 1.pdf7 Feb 2019
Certificates of CA (Form 5)File: CANN - CA Certificate - 2.pdf7 Feb 2019
Certificates of CA (Form 5)File: CANN - CA Certificate - 3.pdf7 Feb 2019
Certificates of CA (Form 5)File: CANN - CA Certificate - 4.pdf7 Feb 2019
Certificates of CA (Form 5)File: CANN - CA Certificate - 5.pdf7 Feb 2019
Declaration in FORM BFile: Affidavit-cum-Declaration - ON STAMP PAPER - PAGE -0001.pdf11 Aug 2017
Declaration in FORM BFile: Affidavit-cum-Declaration - ON STAMP PAPER - PAGE -0002.pdf11 Aug 2017
Declaration in FORM BFile: Affidavit-cum-Declaration - ON STAMP PAPER - PAGE -0003.pdf11 Aug 2017
Declaration in FORM BFile: Affidavit-cum-Declaration - ON STAMP PAPER - PAGE -0004.pdf11 Aug 2017
Layout approvalFile: CANN - CTS PLAN.pdf29 Jul 2017
Building plan approvalFile: IOD - 55 CORPORATE AVENUE - PAGE -0005.pdf29 Jul 2017
Building plan approvalFile: IOD - 55 CORPORATE AVENUE - PAGE -0001.pdf29 Jul 2017
Building plan approvalFile: IOD - 55 CORPORATE AVENUE - PAGE -0002.pdf29 Jul 2017
Building plan approvalFile: IOD - 55 CORPORATE AVENUE - PAGE -0003.pdf29 Jul 2017
Building plan approvalFile: IOD - 55 CORPORATE AVENUE - PAGE -0004.pdf29 Jul 2017
Building plan approvalFile: CANN - APPROVED PLAN - PAGE - 2.pdf29 Jul 2017
Building plan approvalFile: CANN - APPROVED PLAN - PAGE - 3.pdf29 Jul 2017
Building plan approvalFile: IOD - 55 CORPORATE AVENUE - PAGE -0008.pdf29 Jul 2017
Building plan approvalFile: CANN - APPROVED PLAN - PAGE - 1.pdf29 Jul 2017
Building plan approvalFile: IOD - 55 CORPORATE AVENUE - PAGE -0006.pdf29 Jul 2017
Building plan approvalFile: IOD - 55 CORPORATE AVENUE - PAGE -0007.pdf29 Jul 2017
Building plan approvalFile: CANN - APPROVED PLAN - PAGE - 5.pdf29 Jul 2017
Building plan approvalFile: CANN - APPROVED PLAN - PAGE - 6.pdf29 Jul 2017
Building plan approvalFile: CANN - APPROVED PLAN - PAGE - 4.pdf29 Jul 2017
PAN CardFile: PAN CANNONADE.pdf29 Jul 2017
Copy of the legal title reportFile: TITLE CERTIFICATE - 55 CORPORATE AVENUE - PAGE -0001.pdf29 Jul 2017
Copy of the legal title reportFile: TITLE CERTIFICATE - 55 CORPORATE AVENUE - PAGE -0002.pdf29 Jul 2017
Copy of the legal title reportFile: TITLE CERTIFICATE - 55 CORPORATE AVENUE - PAGE -0003.pdf29 Jul 2017
Copy of the legal title reportFile: TITLE CERTIFICATE - 55 CORPORATE AVENUE - PAGE -0004.pdf29 Jul 2017
Copy of the legal title reportFile: TITLE CERTIFICATE - 55 CORPORATE AVENUE - PAGE -0005.pdf29 Jul 2017

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
ABS ESTATERANWAR VILLAGE VERONICA ROAD BANDRA WEST24CompletedMay 2008Feb 2008

How this compares with Mumbai Suburban

33%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 60 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep 55 CORPORATE AVENUE BUILDING NO 2 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near TUNGVE6,700+ in Mumbai Suburban

2 km55 CORPORATE AVENUE BUILCompleted 56Lapsed / revoked 28Other 41Dot size: filed unitsN

Filed coordinates, straight-line distance. 125 registered projects within 2 km.

Builder: THE CANNONADE CONSTRUCTION COMPANY PVT LTD

THE CANNONADE CONSTRUCTION COMPANY PVT LTD has 1 registration on MahaRERA, including 55 CORPORATE AVENUE BUILDING NO 2. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if 55 CORPORATE AVENUE BUILDING NO 2 is delayed beyond 30 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of 55 CORPORATE AVENUE BUILDING NO 2?

The registered promoter entity is THE CANNONADE CONSTRUCTION COMPANY PVT LTD, a company as per the filing. Its CIN U70101MH1987PTC044594 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in 55 CORPORATE AVENUE BUILDING NO 2?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for 55 CORPORATE AVENUE BUILDING NO 2?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at 55 CORPORATE AVENUE BUILDING NO 2?

The professionals named in the filing: Architect: SWAPNIL SAWANR; Engineer: MR UMESH JOSHI PARTNER J W CONSUTANTS LLP; Chartered Accountant: ARUN KOCCHAR. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in 55 CORPORATE AVENUE BUILDING NO 2?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About 55 CORPORATE AVENUE BUILDING NO 2. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save 55 CORPORATE AVENUE BUILDING NO 2 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.