ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / 51B Inclusive Housing

Completed Litigation declared Others project

51B Inclusive Housing

By Vilas Javdekar Eco Housing Private Limited

RG-MH-51055 · RERA P52100051227 · Last updated on MahaRERA portal: 12 Dec 2025

Source: official MahaRERA filing

Red flags

  • Litigation declared, 2 cases

Clear

  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2025Possession promisedregistration recorded completed
8 of 11Construction stages donefurthest along: External plumbing and external plaster, 80%
10 of 67Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 111 documents Report an error

51B Inclusive Housing is a Others project by Vilas Javdekar Eco Housing Private Limited in Pune, Maharashtra, registered with MahaRERA as P52100051227 on 8 Jun 2023. The registration is recorded completed; possession was promised by 31 Dec 2025. 57 of the 67 units on this registration are recorded sold or booked, and 8 of 11 construction stages are filed complete.

At a glance

Project

  • Name51B Inclusive Housing
  • TypeOthers
  • Location
    • Balewadi
    • Haveli
    • Pune
    • 411045
  • Pincode411045
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100051227
  • ReraGenie IDRG-MH-51055

Builder

  • NameVilas Javdekar Eco Housing Private Limited
  • Entity typePartnership
  • CINU68200PN2025PTC245244
  • GSTIN27AAOFV2616F1Z1
  • CIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • PartnerSarvesh Vilas Javdekar
  • Other registrations3 more →
  • Completed1 of 4
  • Declared earlier projects1 →

Key dates

this monthRegisteredJun 2023PromisedDec 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on8 Jun 2023
  • Promised completion31 Dec 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed111 files

Current status

85%57 of 67 units booked
67.8%Work done, per cost certificate

Figures as on 12 Dec 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building DNA131263467

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 12 Dec 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 11 construction stages are filed complete. The stage furthest along is External plumbing and external plaster, at 80%.

Building D: 86% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.70%

Progress on shared amenities15

As on 12 Dec 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes70%
Water SupplyYes80%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes90%
Landscaping & Tree PlantingYes0%
Street LightingYes80%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes80%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes80%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes80%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes80%

Parking filed120

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots120
Closed/Covered114
Open Space6

Land and ownership73

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area625 sq m
Land owned byThe promoter, with other names on the file
Named landowners73
Encumbrance on the landDeclared none
Declared on30 Sep 2024
LandownerVillageDistrict
Mega Spaces LLPPune (M Corp.)Pune
Kamlabai Arjun BalwadkarBalewadiPune
Kundlik Arjun BalwadkarBalewadiPune
Rajshri Kundlik BalwadkarBalewadiPune
Tejas Kundlik BalwadkarBalewadiPune
Vasundhara Santosh BhegadeBanerPune
Abhimanyu Arjun BalwadkarBalewadiPune
Manisha Abhimanyu BalwadkarBalewadiPune
Pratiksha Abhimanyu BalwadkarBalewadiPune
Prajakta Abhimanyu BalwadkarBalewadiPune
Krishna Abhimanyu BalwadkarBalewadiPune
Sunanda Arjun BalwadkarBalewadiPune
Kunal Spaces Pvt. Ltd.Pune (M Corp.)Pune
Ankush Ramchandra BalwadkarBalewadiPune
Vimal alias Yamuna Ankush BalwadkarBalewadiPune
Vikram Ankush BalwadkarBalewadiPune
Vishakha Vikram BalwadkarBalewadiPune
Rajveer Vikram BalwadkarBalewadiPune
Chetan Ankush BalwadkarBalewadiPune
Sayali Chetan BalwadkarBalewadiPune
Shivanya Chetan BalwadkarBanerPune
Pallavi Sandeep DabhadeInduriPune
Rajaram Ramchandra BalwadkarBalewadiPune
Amit Rajaram BalwadkarBalewadiPune
Kanchan Amit BalwadkarBalewadiPune
Rohit Rajaram BalwadkarBalewadiPune
Sneha Rohit BalwadkarBalewadiPune
Rudraraj Rohit BalwadkarBalewadiPune
Pooja Mahesh MoreWarjePune
Machhindra Ramchandra BalwadkarBalewadiPune
Sumati Machhindra BalwadkarBalewadiPune
Mayur Machhindra BalwadkarBalewadiPune
Omkar Machhindra BalwadkarBalewadiPune
Megharani Nitish LagadNandedPune
Angad Ramchandra BalwadkarBalewadiPune
Savita Angad BalwadkarBalewadiPune
Akshada Ramesh JagtapBalewadiPune
Sayali Angad BalwadkarBalewadiPune
Swaraj Angad BalwadkarBalewadiPune
Vikas Magan BalwadkarBalewadiPune
Sarita Vikas BalwadkarBalewadiPune
Sarthak Vikas BalwadkarBalewadiPune
Anvika Vikas BalwadkarBalewadiPune
Haribhau Bhikoba BalwadkarBalewadiPune
Taibai Haribhau BalwadkarBalewadiPune
Rohit Haribhau BalwadkarBalewadiPune
Pratiksha Rohit BalwadkarBalewadiPune
Shashwat Rohit BalwadkarBalewadiPune
Hiraman Bhikoba BalwadkarBalewadiPune
Bhimabai Hiraman BalwadkarBalewadiPune
Sagar Hiraman BalwadkarBalewadiPune
Sonali Sagar BalwadkarBalewadiPune
Shravan Sagar BalkwadkarBalewadiPune
Kavita Vilas YewaleChandkhedPune
Shivaji Shripati BalwadkarBalewadiPune
Mangal Shivaji BalwadkarBalewadiPune
Moreshwar Shivaji BalwadkarBalewadiPune
Pallavi Moreshwar BalwadkarBalewadiPune
Harshwardhan Moreshwar BalwadkarBalewadiPune
Rajwardhan Moreshwar BalwadkarBalewadiPune
Somnath Shivaji BalwadkarBalewadiPune
Monika Somnath BalwadkarBalewadiPune
Jaywardhan Somnath BalwadkarBalewadiPune
Riya Somnath BalwadkarBalewadiPune
Bhaskar Namdev BalwadkarBalewadiPune
Asha Bhaskar BalwadkarBalewadiPune
Tarkesh Bhaskar BalwadkarBalewadiPune
Pooja Bhaskar BalwadkarBalewadiPune
Laxmi Prashant BambeBalewadiPune
Jyoti Vishal ChondheBhugaonPune
Sunita Yashwant BalwadkarBalewadiPune
Yashwant Baburao BalwadkarBalewadiPune
Swaraj Yashwant BalwadkarBalewadiPune

Approvals and building plan

Sanctioning authorityPune Municipal Corporation
Permissible FSI6704.0
Proposed, not sanctioned4,726 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKOTHRUD, PUNE
Estimated costRs 14.45 cr
Cost incurredRs 9.80 cr
Work done67.82%
BuildingWingEstimatedIncurred
Building DNARs 14.45 crRs 9.80 cr

Certifying professionals and partners8

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAsad J. Ahmed
ArchitectAsad J Ahmed
ArchitectVoussoirs
ArchitectAr Surendra Gade
ArchitectAR Prajakta Yadav
EngineerSagar Subhash Kale
Chartered AccountantSunil Shamrao Nimbalkar
Chartered AccountantAbhijit Mundada
PartnerRole in project
Vilas Javdekar Eco Housing Private Limited-

Litigation declared2

CaseCourtStatus
1463/2022The Honorable Civil Judge Senior DivisionOngoing
Civil Suit No. 1463/2022The Hon’ble Civil JudgeOngoing

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 2 Jun 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 19 Feb 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 19 Feb 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 19 Feb 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed111

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 111 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupational CertificateFile: 51B IHP_Completion Certificate_Dated-11122025.pdf12 Dec 2025
Occupational CertificateFile: 51B_Completion Certificate- A Wing & IHP_Dated- 13032025.pdf12 Dec 2025
Withdrawal Update Form 1File: Architect certificate 51B 30-09-25.pdf11 Oct 2025
Withdrawal Update Form 2File: Engineer certificate 51B 30-09-25.pdf11 Oct 2025
Withdrawal Update Form 3File: CA Certificate 51B 30-09-25.pdf11 Oct 2025
Form 5 (FY 2024-2025)File: VJEHLLP_Form 5_P52100051227_51B IHP.pdf27 Sep 2025
Withdrawal Update Form 1File: Architech Certificate 51B 30-06-25.pdf12 Jul 2025
Withdrawal Update Form 2File: Engineer certificate 51B 30-06-25.pdf12 Jul 2025
Withdrawal Update Form 3File: VJEHLLP 51B INCLUSIVE HOUSING.pdf12 Jul 2025
Form 2A (FY 2024-2025)File: 51B IHP_Form2A_31032025_Signed.pdf26 Jun 2025
Withdrawal Update Form 1File: 51B IHP_Architect_31032025_Signed.pdf8 May 2025
Withdrawal Update Form 2File: 51B IHP_Engineer_31032025_Signed.pdf8 May 2025
Withdrawal Update Form 3File: 51B IHP_CA_ 31032025_Signed.pdf8 May 2025
Form 1File: 51B IHP_Architect_31032025_Signed.pdf6 May 2025
Form 2File: 51B IHP_Engineer_31032025_Signed.pdf6 May 2025
Form 3File: 51B IHP_CA_ 31032025_Signed.pdf6 May 2025
Disclosure of Sold and Booked InventoryFile: 51B IHP_Sold Inventory_31032025_Signed.pdf6 May 2025
OthersFile: 51B IHP_Form2A_31032025_Signed.pdf6 May 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 51B IHP_Form2A_31032025_Signed.pdf26 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 51B IHP_Architect_31032025_Signed.pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 51B IHP_Engineer_31032025_Signed.pdf19 Apr 2025
Disclosure of sold/ booked inventoryFile: 51B IHP_Sold Inventory_31032025_Signed.pdf19 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate (Form 3)_51B IHP_ Signed_.pdf4 Apr 2025
Layout approvalFile: 01 - Layout.pdf19 Feb 2025
Building plan approvalFile: 02 - Section.pdf19 Feb 2025
Copy of Layout Approval (in case of layout)File: 01 - Layout.pdf19 Feb 2025
Commencement Certificates / NA Order for plotted developmentFile: CC dated 06-02-2025.pdf19 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: 02 - Section.pdf19 Feb 2025
Declaration about Commencement CertificateFile: 51B IHP Declaration about CC.pdf19 Feb 2025
Declaration about Commencement CertificateFile: Declaration about cc 51B Inclusive 01102024_signed.pdf16 Jan 2025
Disclosure of sold/ booked inventoryFile: Disclosure of sold inventory 51 Inclusive_signed.pdf11 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architech certificate 51B 31-12-24_signed.pdf10 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate - 51B Inclusive Housing_signed.pdf10 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate 51B 31-12-24_signed.pdf10 Jan 2025
Layout approvalFile: 01- Layout Plan_compressed.pdf13 Nov 2024
Copy of Layout Approval (in case of layout)File: 01- Layout Plan_compressed.pdf13 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECH 51 B INCLUSIVE HOUSING_signed.pdf22 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate- 51B IHP_signed.pdf22 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER 51B IHP_signed.pdf22 Oct 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD INVENTORY 51B INCLUSIVE HOUSING-signed.pdf22 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: 26_Form 5 VJ 51B inclusive housing_signed.pdf15 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 19_Form 2A_51B_31032024.pdf15 Jul 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD INVENTORY 51B IHP_signed.pdf15 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer_certificate_51B_IHP_signed.pdf13 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_51B IHP_signed.pdf13 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect_certificate_51B_IHP_signed.pdf12 Jul 2024
Declaration about Commencement CertificateFile: 51B Inclusive housing commencement certificate 28032024_signed.pdf29 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 19_Architect_51B_31032024_signed.pdf15 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 19_Engineer Certificate_51B IHP_signed.pdf15 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 19_Form 2A_51B_31032024.pdf15 Apr 2024
Disclosure of sold/ booked inventoryFile: 19_51B_Inventory_31032024_signed.pdf15 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 19_CA Certificate_51B IHP_signed.pdf15 Apr 2024
Layout approvalFile: 01- Layout Plan_compressed.pdf11 Apr 2024
Building plan approvalFile: 43- Building D Floor Plans_compressed.pdf11 Apr 2024
Building plan approvalFile: 44- Building D Floor Plans_compressed.pdf11 Apr 2024
Copy of Layout Approval (in case of layout)File: 01- Layout Plan_compressed.pdf11 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: 43- Building D Floor Plans_compressed.pdf11 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: 44- Building D Floor Plans_compressed.pdf11 Apr 2024
Commencement Certificates / NA Order for plotted developmentFile: CC dated 28-03-2024.pdf11 Apr 2024
Declaration about Commencement CertificateFile: CC Declaration_51B_28032024_signed.pdf11 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 8 Architect_51B IHP_31122023.pdf13 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 8 Engineer Certificate_51B IHP.pdf13 Jan 2024
Disclosure of sold/ booked inventoryFile: 8 Sold Unsold_51B IHP_31122023_signed.pdf13 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 8 CA Certificate_51B IHP_compressed.pdf13 Jan 2024
Other - TechnicalFile: 51B IHP.pdf20 Oct 2023
Layout approvalFile: 01-Layout_compressed.pdf12 Oct 2023
Building plan approvalFile: 32-Building D Floor Plans_compressed.pdf12 Oct 2023
Building plan approvalFile: 33-Building D Floor Plans_compressed.pdf12 Oct 2023
Copy of Layout Approval (in case of layout)File: 01-Layout_compressed.pdf12 Oct 2023
Building Plan Approval / NA Order for plotted developmentFile: 32-Building D Floor Plans_compressed.pdf12 Oct 2023
Building Plan Approval / NA Order for plotted developmentFile: 33-Building D Floor Plans_compressed.pdf12 Oct 2023
Declaration about Commencement CertificateFile: CC dated 10-10-2023.pdf12 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate_51B IHP_signed.pdf10 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_51B IHP_compressed.pdf10 Oct 2023
Disclosure of sold/ booked inventoryFile: 51B IHP.pdf9 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect_51B IHP_Sept 2023_signed.pdf7 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: fORM3_compressed.pdf3 Jun 2023
Layout approvalFile: AREA_for_RERA_IHP_625_compressed.pdf2 Jun 2023
Copy of the legal title reportFile: TSR_page 1 to 16_compressed.pdf2 Jun 2023
Copy of the legal title reportFile: TSR_page 17 TO 32_compressed.pdf2 Jun 2023

How this compares with Pune

85%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep 51B Inclusive Housing on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Balewadi13,700+ in Pune

2 km51B Inclusive HousingCompleted 130Lapsed / revoked 42Other 108Dot size: filed unitsN

Filed coordinates, straight-line distance. 280 registered projects within 2 km.

Builder: Vilas Javdekar Eco Housing Private Limited

Vilas Javdekar Eco Housing Private Limited has 4 registrations on MahaRERA, including Palladio Balewadi Central Phase 1 and 51B Inclusive Housing. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Litigation is declared on 4 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if 51B Inclusive Housing is delayed beyond 31 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of 51B Inclusive Housing?

The registered promoter entity is Vilas Javdekar Eco Housing Private Limited, a partnership as per the filing. Its CIN U68200PN2025PTC245244 and GSTIN 27AAOFV2616F1Z1 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in 51B Inclusive Housing?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for 51B Inclusive Housing?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at 51B Inclusive Housing?

The professionals named in the filing: Architect: Asad J. Ahmed; Architect: Asad J Ahmed; Architect: Voussoirs; Architect: Ar Surendra Gade; Architect: AR Prajakta Yadav; Engineer: Sagar Subhash Kale. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in 51B Inclusive Housing?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About 51B Inclusive Housing. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save 51B Inclusive Housing to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.