Home / Browse projects / Pune, Maharashtra / 47 East - B Wing A
47 East - B Wing A
By Kumar Properties and Developers LLP
RG-MH-46297 · RERA P52100047702 · Last updated on MahaRERA portal: 20 Apr 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Rs 11.79 crore secured on the land, in favour of Prachay Capital Limited and others
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
47 East - B Wing A is a Residential / Group Housing project by Kumar Properties and Developers LLP in Pune, Maharashtra, registered with MahaRERA as P52100047702 on 21 Nov 2022. Possession is promised by 30 Jun 2027. 55 of the 63 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete.
At a glance
Project
- Name47 East - B Wing A
- TypeResidential / Group Housing
- Location
- Hadapsar Mundhawa Road
- Mundhawa
- Haveli
- Pune
- 411028
- Pincode411028
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100047702
- ReraGenie IDRG-MH-46297
Builder
- NameKumar Properties and Developers LLP
- Entity typePartnership
- PartnerYogesh Yeshwant Bhave
- Other registrations3 more →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on21 Nov 2022
- Promised completion30 Jun 2027
- Revised completionNone
- Buildings1 building record
- Documents filed95 files
Current status
Figures as on 20 Apr 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| B Wing A | NA | 25 | 22 | 63 | 0 | 63 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 20 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
5 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 75%.
B Wing A: 61% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 71% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 75% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 24% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 20 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed132
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| B Wing A | NA | Rs 27.96 cr | Rs 20.62 cr |
| - | NA | Rs 7.50 cr | Rs 3.19 cr |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Vishal Deshpande |
| Engineer | Suneel Kulkarni |
| Engineer | Amit Nagpure |
| Chartered Accountant | Supriya Abhijit Mundada |
| Chartered Accountant | GMKS & Co. |
| Partner | Role in project |
|---|---|
| Kumar Properties and Developers LLP | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 28 Jul 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 31 Jul 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 1 Jan 2026 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 31 Jul 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 30 Jun 2027
Documents filed95
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 95 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 2A (FY 2025-2026)File: Form 2A - 2026_signed.pdf | 20 Apr 2026 |
| Withdrawal Update Form 1File: 1_Ar Certificate.pdf | 18 Apr 2026 |
| Withdrawal Update Form 2File: 2_Engg certificate.pdf | 18 Apr 2026 |
| Withdrawal Update Form 3File: 3_CA Certificate_compressed.pdf | 18 Apr 2026 |
| Withdrawal Update Form 1File: 1_Ar Certificate_Signed.pdf | 13 Jan 2026 |
| Withdrawal Update Form 2File: 2_Engg Certificate.pdf | 13 Jan 2026 |
| Withdrawal Update Form 3File: 3_CA Certificate.pdf | 13 Jan 2026 |
| Building plan approvalFile: 251222_Layout_B-A.pdf | 1 Jan 2026 |
| Building plan approvalFile: 251222_Basement Layout.pdf | 1 Jan 2026 |
| Building plan approvalFile: 251222_Bldg B-Wing A_Elev.pdf | 1 Jan 2026 |
| Building plan approvalFile: 251222_Bldg B-Wing A_Sec A.pdf | 1 Jan 2026 |
| Building plan approvalFile: 251222_Bldg B-Wing A_Sec.pdf | 1 Jan 2026 |
| Building plan approvalFile: 251222_Bldg B-Wing A_Typ_Fl.pdf | 1 Jan 2026 |
| Withdrawal Update Form 1File: 1_Ar Certificate_Signed.pdf | 28 Oct 2025 |
| Withdrawal Update Form 2File: 2_Engg Certificate_Signed.pdf | 28 Oct 2025 |
| Withdrawal Update Form 3File: 3_CA Certificate_Signed.pdf | 28 Oct 2025 |
| Form 5 (FY 2024-2025)File: Form 5_47 East_B A_Signed.pdf | 22 Sep 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Ar Certificate_B wing A.pdf | 19 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3_CA Certificate.pdf | 19 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate_B wing A.pdf | 19 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: 6_Disclosure of Sold Inventory.pdf | 19 Apr 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 5_Form 2A.pdf | 19 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: 6_Disclosure of Sold Inventory.pdf | 20 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Arch certificate_Signed.pdf | 18 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3_CA Certificate.pdf | 18 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf | 18 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: 5_Disclosure of sold inventory.pdf | 24 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Arch Certificate.pdf | 21 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3_CA Certificate.pdf | 21 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf | 21 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: 47 East_ Build B-A.pdf | 14 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Arch Certificate.pdf | 20 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf | 20 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: 6_Disclosure of sold inventory.pdf | 20 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3_CA Certificate_compressed (1).pdf | 20 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Arch Certificate.pdf | 20 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf | 20 Apr 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 5_Form 2A.pdf | 20 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: 5_Disclosure Inventory.pdf | 20 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3_CA Certificate.PDF | 20 Apr 2024 |
| Home Buyer /Allottee Grievance Redressal CellFile: 240318_Decl about Grievance Redressal Cell.pdf | 18 Mar 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Arch Certificate.pdf | 16 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf | 16 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: 47 East - B WIng A.pdf | 16 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3_CA Certificate.pdf | 16 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Arch Certificate.pdf | 19 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf | 19 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: 47 East - B WIng A.pdf | 19 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3_CA Certicate_compressed.pdf | 19 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: 48_47 East-B.pdf | 30 Sep 2023 |
| Layout approvalFile: 230717_Layout.pdf | 31 Jul 2023 |
| Building plan approvalFile: 230717_Bldg Plan_B Wing A_Flr Plan.pdf | 31 Jul 2023 |
| Copy of Layout Approval (in case of layout)File: 230717_Layout.pdf | 31 Jul 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 230717_Bldg Plan_B Wing A_Flr Plan.pdf | 31 Jul 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: 230717_Commencement Certificate.pdf | 31 Jul 2023 |
| Declaration about Commencement CertificateFile: 230717_Declaration about CC.pdf | 31 Jul 2023 |
| Copy of the legal title reportFile: 230728_Legal Title Report.pdf | 28 Jul 2023 |
| Details of encumbrances concerned to FinanceFile: 230728_Encumbrance Certificate_Finance.pdf | 28 Jul 2023 |
| Details of encumbrances concerned to LegalFile: 230728_Encumbrance Certificate_Finance.pdf | 28 Jul 2023 |
| Declaration in FORM BFile: 230728_Form B_Declaration.pdf | 28 Jul 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Arch Certificate.pdf | 19 Jul 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf | 19 Jul 2023 |
| Disclosure of sold/ booked inventoryFile: 47 East - B WIng A.pdf | 19 Jul 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3_CA Certificate_compressed.pdf | 19 Jul 2023 |
| Disclosure of sold/ booked inventoryFile: 34_47 East - B Wing A.pdf | 21 Apr 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3_CA Certificate.pdf | 21 Apr 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Arch Certificate_47E B(A).pdf | 20 Apr 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate_47E B(A).pdf | 20 Apr 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate_47E B(A).pdf | 20 Apr 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Arch Certificate.pdf | 23 Jan 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf | 23 Jan 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3_CA Certificate_compressed.pdf | 23 Jan 2023 |
| Disclosure of sold/ booked inventoryFile: 34_47 East - B Wing A.pdf | 20 Jan 2023 |
| Proforma of Agreement for saleFile: 221206_Agreement for Sale_R5.pdf | 6 Dec 2022 |
| Proforma of Agreement for saleFile: 221115_Agreement for Sale_R4.pdf | 15 Nov 2022 |
| Deviation Report with respect to model copy of AgreementFile: 221115_Deviation_Agreement for Sale_R4.pdf | 15 Nov 2022 |
| Proforma of Allotment letterFile: 221102_Allotment Letter_R1.pdf | 5 Nov 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 221008_CA Certificate_R1.pdf | 8 Oct 2022 |
| Layout approvalFile: 4_Layout.pdf | 7 Oct 2022 |
| Building plan approvalFile: 11_Building Plan.pdf | 7 Oct 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 3 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 95 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep 47 East - B Wing A on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Mundhawa13,700+ in Pune
Filed coordinates, straight-line distance. 193 registered projects within 2 km.
Amanora Arbano Towers 73,74,75 and 76
City Corporation Limited
Astrana
Dilip Baburao Tupe
Leisure Town Phase 1
Sai Proviso Homes
ARV Newtown Phase III
Vedant Infracon
Kumar Parc Residences - A2
Kumar Properties Infratech Developers Pvt
Kumar Parc residences - A1
Kumar Properties Infratech Developers Pvt
Builder: Kumar Properties and Developers LLP
Kumar Properties and Developers LLP has 4 registrations on MahaRERA, including 47 East - A and 47 East - B Wing A. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if 47 East - B Wing A is delayed beyond 30 Jun 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of 47 East - B Wing A?
The registered promoter entity is Kumar Properties and Developers LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in 47 East - B Wing A?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for 47 East - B Wing A?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at 47 East - B Wing A?
The professionals named in the filing: Architect: Vishal Deshpande; Engineer: Suneel Kulkarni; Engineer: Amit Nagpure; Chartered Accountant: Supriya Abhijit Mundada; Chartered Accountant: GMKS & Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in 47 East - B Wing A?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback