Home / Browse projects / Pune, Maharashtra / 47 East - A

Registered No litigation declared Residential / Group Housing project

47 East - A

By Kumar Properties and Developers LLP

RG-MH-15852 · RERA P52100024598 · Last updated on MahaRERA portal: 20 Apr 2026

Source: official MahaRERA filing

Red flags

  • 58 complaints at MahaRERA
  • Rs 42.84 crore secured on the land, in favour of JM Financial Credit Solutions Limited

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Mar 2027Possession promisedno revision filed
9 of 11Construction stages donefurthest along: Installation of Lifts, 50%
0 of 173Units unsoldnot recorded sold or booked
58Complaints at MahaRERAon this registration
Jump to the 127 documents Report an error

47 East - A is a Residential / Group Housing project by Kumar Properties and Developers LLP in Pune, Maharashtra, registered with MahaRERA as P52100024598 on 24 Feb 2020. Possession is promised by 30 Mar 2027. 173 of the 173 units on this registration are recorded sold or booked, and 9 of 11 construction stages are filed complete. 58 complaints are on record with the regulator.

At a glance

Project

  • Name47 East - A
  • TypeResidential / Group Housing
  • Location
    • Hadapsar Mundhwa Road
    • Mundhwa
    • Mundhawa
    • Haveli
    • Pune
    • 411028
  • Pincode411028
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100024598
  • ReraGenie IDRG-MH-15852

Builder

  • NameKumar Properties and Developers LLP
  • Entity typePartnership
  • PartnerYogesh Yeshwant Bhave
  • Other registrations3 more →

Key dates

this monthRegisteredFeb 2020PromisedMar 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on24 Feb 2020
  • Promised completion30 Mar 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed127 files

Current status

100%173 of 173 units booked
97.7%Work done, per cost certificate

Figures as on 20 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ANA25221730173

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 20 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 11 construction stages are filed complete. The stage furthest along is Installation of Lifts, at 50%.

A: 86% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%

Progress on shared amenities15

As on 20 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed346

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots346
Closed/Covered346

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area6,973 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofJM Financial Credit Solutions Limited
Secured amountRs 42.84 crore
CERSAI search filedYes
Declared on16 Jul 2025

Approvals and building plan

Sanctioning authorityPMC
Permissible FSI23086.76
Proposed, not sanctioned17,032 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKP Housing SOciety General Thimayya Road East STreet Camp Pune
Estimated costRs 63.70 cr
Cost incurredRs 62.23 cr
Work done97.7%
BuildingWingEstimatedIncurred
ANARs 48.97 crRs 47.50 cr
-NARs 14.73 crRs 14.73 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVishal Deshpande
EngineerSuneel Kulkarni
EngineerAmit Nagpure
Chartered AccountantSupriya Abhijit Mundada
Chartered AccountantGMKS & Co.
PartnerRole in project
Kumar Properties and Developers LLP-

Complaints filed with MahaRERA58

Case no.ComplainantRespondentFiled
CC12503850Payal HaldarKumar Properties and Developers LLP02/11/2025
CC12504483ABHISHEK SINHAKumar Properties and Developers LLP15/12/2025
CC12504488VIPIN NARAYAN ADMULWARKumar Properties and Developers LLP16/12/2025
CC12504630PRATEEK SINGHKumar Properties and Developers LLP26/12/2025
CC12602618Pranit Vikas NaikKumar Properties and Developers LLP05/05/2026
CC12601298Ajay KainthKumar Properties and Developers LLP10/03/2026
CC12601393Kartik SharmaKumar Properties and Developers LLP13/03/2026
CC12602622Amolkumar Ramakant BedreKumar Properties and Developers LLP05/05/2026
CC12601958Vedant KumarKumar Properties and Developers LLP03/04/2026
CC12602210ANKIT SAHUKumar Properties and Developers LLP15/04/2026
CC12602790Dheeraj RautKumar Properties and Developers LLP13/05/2026
CC12603023bhimashankar vishwanath shivaneKumar Properties and Developers LLP21/05/2026
CC12602196Naresh Madhavdas BhagwaniKumar Properties and Developers LLP14/04/2026
CC12602431Pranali Prasad KhenatKumar Properties and Developers LLP25/04/2026
CC12602447Darshan Bacchukant FulfagarKumar Properties and Developers LLP26/04/2026
CC12602376Subhash ChandraKumar Properties and Developers LLP22/04/2026
CC12602556Sweta BhaktaKumar Properties and Developers LLP01/05/2026
CC12602657Neeraj KumarKumar Properties and Developers LLP07/05/2026
CC12602557Veena BhaktaKumar Properties and Developers LLP01/05/2026
CC12602611Kewal ThakkarKumar Properties and Developers LLP04/05/2026
CC12602615Sagar Vijay KhandelwalKumar Properties and Developers LLP05/05/2026
CC12602843Rahul Rohidas RathodKumar Properties and Developers LLP15/05/2026
CC12602890Umesh Dnyaneshwar KhadtareKumar Properties and Developers LLP17/05/2026
CC12602626Kuldeep KumarKumar Properties and Developers LLP05/05/2026
CC12602627Madhuri Kunal KhandelwalKumar Properties and Developers LLP06/05/2026
CC12602656Neha GautamKumar Properties and Developers LLP07/05/2026
CC12603127Abid Ajmuddin BhaldarKumar Properties and Developers LLP26/05/2026
CC12602714sujata hemraj firakeKumar Properties and Developers LLP09/05/2026
CC12602922Tejas Nilkanthrao JagtapKumar Properties and Developers LLP18/05/2026
CC12602712Shrikant Ramkrishna DholeKumar Properties and Developers LLP09/05/2026
CC12602724ROHIT KISHORE WAGHMAREKumar Properties and Developers LLP10/05/2026
CC12602737ASHWINI JAYESH SHINDEKumar Properties and Developers LLP11/05/2026
CC12602754Naresh Shankar EtkyalKumar Properties and Developers LLP11/05/2026
CC12602800Anis Abdulaziz NadafKumar Properties and Developers LLP13/05/2026
CC12602857Aniket SheteKumar Properties and Developers LLP15/05/2026
CC12602883VIJAY KRISHNANKumar Properties and Developers LLP16/05/2026
CC12602970Nutan Sampat KasareKumar Properties and Developers LLP20/05/2026
CC12602920Dheeraj RautKumar Properties and Developers LLP18/05/2026
CC12602929Tejas Nilkanthrao JagtapKumar Properties and Developers LLP18/05/2026
CC12602953Sandeep Digamber KholeKumar Properties and Developers LLP19/05/2026
CC12603218Pratik Ravindra BarapatreKumar Properties and Developers LLP28/05/2026
CC12603271Sushmita BiswasKumar Properties and Developers LLP31/05/2026
CC12603076Dinesh Jhalaram PariharKumar Properties and Developers LLP24/05/2026
CC12603265pratik digambar gadewarKumar Properties and Developers LLP31/05/2026
CC12603243Akshay Dilip RawateKumar Properties and Developers LLP29/05/2026
CC12603576Bharat Vinayak ShitoleKumar Properties and Developers LLP09/06/2026
CC12603276Harshal Krishnahari JorigalKumar Properties and Developers LLP31/05/2026
CC12604357Amit SoniKumar Properties and Developers LLP12/07/2026
CC12604158Amol G KhatokarKumar Properties and Developers LLP03/07/2026
CC12603472Neha KankaneKumar Properties and Developers LLP05/06/2026
CC12603476Santosh Shivnath MoteKumar Properties and Developers LLP05/06/2026
CC12603984RESHMA PATELKumar Properties and Developers LLP27/06/2026
CC12603530sneha Dhanraj kabraKumar Properties and Developers LLP08/06/2026
CC12603629Ketaki ParanjapeKumar Properties and Developers LLP12/06/2026
CC12603637Seema Santosh BhagwatKumar Properties and Developers LLP12/06/2026
CC12603881GIRISH RAMESH SAWANTKumar Properties and Developers LLP23/06/2026
CC12603849Sameer Tukaram PalweKumar Properties and Developers LLP21/06/2026
CC12604215Disha Nikhil VaidyaKumar Properties and Developers LLP05/07/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 28 Jul 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 31 Jul 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 1 Jan 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 31 Jul 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Mar 2027

Documents filed127

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 127 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: Form 2A- 2026_Signed.pdf20 Apr 2026
Withdrawal Update Form 1File: 1_Ar Certificate.pdf18 Apr 2026
Withdrawal Update Form 2File: 2_Engg Certificate.pdf18 Apr 2026
Withdrawal Update Form 3File: 3_CA Certificate_compressed.pdf18 Apr 2026
Withdrawal Update Form 1File: 1_Ar Certificate.pdf17 Jan 2026
Withdrawal Update Form 2File: 2_Engg Certificate.pdf17 Jan 2026
Withdrawal Update Form 3File: 3_CA Certificate.pdf17 Jan 2026
Building plan approvalFile: 1_251222_Layout_A.pdf1 Jan 2026
Building plan approvalFile: 3_251222_Building A_Typical Fl.pdf1 Jan 2026
Building plan approvalFile: 2_251222_Basement Layout.pdf1 Jan 2026
Building plan approvalFile: 4_251222_Building A_Refuge.pdf1 Jan 2026
Building plan approvalFile: 5_251222_Building A_Elev.pdf1 Jan 2026
Withdrawal Update Form 1File: 1_Ar Certificate_Signed.pdf28 Oct 2025
Withdrawal Update Form 2File: 2_Engg Certificate_Signed.pdf28 Oct 2025
Withdrawal Update Form 3File: 3_CA Certificate_Signed.pdf28 Oct 2025
Form 5 (FY 2024-2025)File: Form 5_47 East_A_Signed.pdf22 Sep 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Ar Certificate_A.pdf19 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3_CA Certificate.pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate_A.pdf19 Apr 2025
Disclosure of sold/ booked inventoryFile: 6_Disclosure of Sold Inventory.pdf19 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 5_Form 2A_A.pdf19 Apr 2025
Disclosure of sold/ booked inventoryFile: 6_Disclosure of Sold Inventory.pdf20 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Arch Certificate_Signed.pdf18 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3_CA Certificate.pdf18 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf18 Jan 2025
Disclosure of sold/ booked inventoryFile: 5_Disclosure of sold inventory.pdf24 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Arch Certificate.pdf21 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3_CA Certificate.pdf21 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf21 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: 47 East_ Build A.pdf14 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Arch Certificate.pdf20 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf20 Jul 2024
Disclosure of sold/ booked inventoryFile: 6_Disclosure of sold inventory_47 East A.pdf20 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3_CA Certificate_compressed.pdf20 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Arch Certificate.pdf20 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf20 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 5_Form 2A.pdf20 Apr 2024
Disclosure of sold/ booked inventoryFile: 5_Disclosure Inventory.pdf20 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3_CA Certificate.PDF20 Apr 2024
Home Buyer /Allottee Grievance Redressal CellFile: 240318_Decl about Grievance Redressal Cell.pdf18 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Arch Certificate.pdf16 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf16 Jan 2024
Disclosure of sold/ booked inventoryFile: 47 East - A.pdf16 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3_CA Certificate.pdf16 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Arch Certificate.pdf19 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf19 Oct 2023
Disclosure of sold/ booked inventoryFile: 47 East - A_compressed.pdf19 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3_CA Certicate_compressed.pdf19 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: 36_47 East-A.pdf30 Sep 2023
Layout approvalFile: 230717_Layout.pdf31 Jul 2023
Building plan approvalFile: 230717_Bldg Plan_A_Flr Plan.pdf31 Jul 2023
Copy of Layout Approval (in case of layout)File: 230717_Layout.pdf31 Jul 2023
Building Plan Approval / NA Order for plotted developmentFile: 230717_Bldg Plan_A_Flr Plan.pdf31 Jul 2023
Commencement Certificates / NA Order for plotted developmentFile: 230717_Commencement Certificate.pdf31 Jul 2023
Declaration about Commencement CertificateFile: 230717_Declaration about CC.pdf31 Jul 2023
Copy of the legal title reportFile: 230728_Legal Title Report.pdf28 Jul 2023
Details of encumbrancesFile: 230728_Encumbrance Certificate_Finance.pdf28 Jul 2023
Declaration in FORM BFile: 230728_Form B_Declaration.pdf28 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Arch Certificate.pdf19 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf19 Jul 2023
Disclosure of sold/ booked inventoryFile: 47 East - A_compressed.pdf19 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3_CA Certificate_compressed.pdf19 Jul 2023
Disclosure of sold/ booked inventoryFile: 18_47 East - A.pdf21 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3_CA Certificate_compressed.pdf21 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Arch Certificate_47E A.pdf20 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate_47E A.pdf20 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Arch Certificate.pdf23 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf23 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3_CA Certificate.pdf23 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Arch Certificate.pdf17 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Arch Certificate.pdf17 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf17 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf17 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3_CA Certificate_1.pdf17 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3_CA Certificate_2.pdf17 Jan 2023
Disclosure of sold/ booked inventoryFile: 18_47 East - A.pdf13 Jan 2023
Proforma of Agreement for saleFile: 221013_Allot Agreement for Sale.pdf15 Nov 2022
Disclosure of sold/ booked inventoryFile: 18_47 East - A.pdf19 Oct 2022
Building plan approvalFile: 221014_Building Plan.pdf14 Oct 2022
Layout approvalFile: 221014_Layout.pdf14 Oct 2022

How this compares with Pune

100%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep 47 East - A on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Mundhwa13,700+ in Pune

2 km47 East - ACompleted 71Lapsed / revoked 25Other 96Dot size: filed unitsN

Filed coordinates, straight-line distance. 192 registered projects within 2 km.

Builder: Kumar Properties and Developers LLP

Kumar Properties and Developers LLP has 4 registrations on MahaRERA, including 47 East - A and 47 East - B Wing A. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if 47 East - A is delayed beyond 30 Mar 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of 47 East - A?

The registered promoter entity is Kumar Properties and Developers LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in 47 East - A?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against 47 East - A?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for 47 East - A?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at 47 East - A?

The professionals named in the filing: Architect: Vishal Deshpande; Engineer: Suneel Kulkarni; Engineer: Amit Nagpure; Chartered Accountant: Supriya Abhijit Mundada; Chartered Accountant: GMKS & Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in 47 East - A?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About 47 East - A. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save 47 East - A to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.