Home / Browse projects / Pune, Maharashtra / 41 Zillenia

Registered Litigation declared Residential / Group Housing project

41 Zillenia

By Tirupati Skyscrapers LLP

RG-MH-88647 · RERA P52100051790 · Last updated on MahaRERA portal: 16 Jul 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 2 cases
  • 2 complaints at MahaRERA

Clear

  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Sep 2027Possession promisedno revision filed
17 of 33Construction stages doneacross 3 buildings; furthest along: Internal walls, 85%
97 of 544Units unsoldnot recorded sold or booked
2Complaints at MahaRERAon this registration
Jump to the 192 documents Report an error

41 Zillenia is a Residential / Group Housing project by Tirupati Skyscrapers LLP in Pune, Maharashtra, registered with MahaRERA as P52100051790 on 3 Jul 2023. Possession is promised by 30 Sep 2027. 447 of the 544 units on this registration are recorded sold or booked, and 17 of 33 construction stages are filed complete. 2 complaints are on record with the regulator.

At a glance

Project

  • Name41 Zillenia
  • TypeResidential / Group Housing
  • Location
    • Sr No. 26/1/6
    • 26/3/1
    • 26/3/2
    • Punawala
    • Punawale
    • Mulshi
    • Pune
    • 411033
  • Pincode411033
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100051790
  • ReraGenie IDRG-MH-88647

Builder

  • NameTirupati Skyscrapers LLP
  • Entity typeOthers
  • PartnersRAJESH KRISHNAKUMAR GOYAL, Jaideep Dhananjay Modak, Krisala Punawale LLP Through its Authorised Signatory Pankaj Meghwani
  • Named personsRAJESH KRISHNAKUMAR GOYAL, Jaideep Dhananjay Modak, Krisala Punawale LLP

Key dates

this monthRegisteredJul 2023PromisedSep 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on3 Jul 2023
  • Promised completion30 Sep 2027
  • Revised completionNone
  • Buildings3 building records
  • Documents filed192 files

Current status

82%447 of 544 units booked
69.7%Work done, per cost certificate

Figures as on 16 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Tower BNA27242830283
Inclusive Housing TowerNA7525025
Tower ANA27242360236

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 16 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

17 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Internal walls, at 85%.

Tower B68%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks25%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.38%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.40%
Inclusive Housing Tower74%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises85%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks85%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.60%
Tower A68%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises48%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks20%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.35%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.40%

Progress on shared amenities15

As on 16 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes35%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes70%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed544

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots544
Closed/Covered544
BuildingClosed/CoveredTotal
Tower B283283
Inclusive Housing Tower2525
Tower A236236

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area7,679 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityPimpri Chinchwad Municipal Corporation
Permissible FSI60000.0
Proposed, not sanctioned21,516 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchEMPIRE SQUARE, OLD MUMBAI-PUNE HIGHWAY, CHINCHWAD, PUNE 411 019
Estimated costRs 153.67 cr
Cost incurredRs 107.18 cr
Work done69.74%
BuildingWingEstimatedIncurred
Tower BNARs 40.98 crRs 28.58 cr
Inclusive Housing TowerNARs 40.98 crRs 28.58 cr
Tower ANARs 40.98 crRs 28.58 cr
-NARs 30.73 crRs 21.44 cr

Certifying professionals and partners9

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVK a architecture
EngineerVinayak Krushnaji Yenpure
EngineerPankaj Kolte
EngineerSadhu Pawar
EngineerTousif Mujawar
Chartered AccountantPatel & Sharma
Chartered AccountantS O Sharma & Co
Chartered AccountantAgarwal Sarawgi and Associates
Chartered AccountantDIPALI SHELAR AND COMPANY
PartnerRole in project
Tirupati Skyscrapers LLP-

Litigation declared2

CaseCourtStatus
813/2023Civil Court Senior DivisionClosed
SPCL. C S. 1252/20261-CIVIL COURT SENIOR DIVISION PIMPRI PUNEOngoing

Complaints filed with MahaRERA2

Case no.ComplainantRespondentFiled
CC005000000269697Kundan Ashok LandgeM/S. Tirupati Sky scrapers LLP03/11/2023
CC12400483Vaibhv Anant BandalTirupati Skyscrapers LLP20/10/2024

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 5 Jun 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 9 May 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 9 May 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 30 Oct 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Sep 2027

Documents filed192

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 192 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form-1 Zillenia _ Signed.pdf16 Jul 2026
Withdrawal Update Form 2File: Form 2 - 41 Zillena_Final_organized (1).pdf16 Jul 2026
Withdrawal Update Form 3File: Form 3 41 Zillenia 26-27_Final.pdf16 Jul 2026
Form 2A (FY 2025-2026)File: Form 2A-Zillenia.pdf6 Jul 2026
Form 5 (FY 2025-2026)File: Form 5.pdf28 May 2026
Withdrawal Update Form 1File: Form-1 - 41 ZILLENIA_signed.pdf6 May 2026
Withdrawal Update Form 2File: Form 2 - 41 Zillenia_signed.pdf6 May 2026
Withdrawal Update Form 3File: Form 3 41 Zillenia_signed.pdf6 May 2026
Withdrawal Update Form 1File: Form 1- 41 ZILLENIA.pdf27 Jan 2026
Withdrawal Update Form 2File: Form 2.pdf27 Jan 2026
Withdrawal Update Form 3File: Form 3 - 41 ZILLENIA_.pdf27 Jan 2026
Withdrawal Update Form 1File: FORM 1 ZILLENIA 30092025.pdf12 Dec 2025
Withdrawal Update Form 1File: FORM 1 ZILLENIA 30092025.pdf12 Dec 2025
Withdrawal Update Form 2File: Form 2.pdf12 Dec 2025
Withdrawal Update Form 2File: Form 2.pdf12 Dec 2025
Withdrawal Update Form 3File: Form 03 41 Zillenia dated 07-10-2025_compressed.pdf12 Dec 2025
Withdrawal Update Form 3File: Form 03 41 Zillenia dated 07-10-2025_compressed.pdf12 Dec 2025
Form 2A (FY 2024-2025)File: Form 2A.pdf31 Oct 2025
Withdrawal Update Form 1File: FORM 1 ZILLENIA 30092025.pdf30 Oct 2025
Withdrawal Update Form 2File: Form 2.pdf30 Oct 2025
Withdrawal Update Form 3File: Form 03 41 Zillenia dated 07-10-2025_compressed.pdf30 Oct 2025
Form 5 (FY 2024-2025)File: Form 05 Signed copy.pdf30 Sep 2025
Withdrawal Update Form 1File: Form 1.pdf17 Jul 2025
Withdrawal Update Form 2File: form 2 zillenia_.pdf17 Jul 2025
Withdrawal Update Form 3File: form 3 zillenia_.pdf17 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 zillenia.pdf18 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ZILLENIA 31032025.pdf18 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ZILLENIA FROM-3-1-7.pdf14 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ZILLENIA FROM-3-8-16.pdf14 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 Final 2.pdf14 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 41 ZILLENIA 02012025.pdf4 Apr 2025
Disclosure of sold/ booked inventoryFile: sold unsold March 2025 compress.pdf4 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: from 1 41 zillenia31-12-24.pdf29 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 41 zillenia 31122024.pdf20 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 41 Zillienia Form 3 Final-1-8_compressed.pdf17 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 41 Zillienia Form 3 Final-9-16 2.pdf17 Jan 2025
Disclosure of sold/ booked inventoryFile: 41 Zillienia Sold unsold_compressed.pdf17 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ZILLENIA 30092024.pdf23 Oct 2024
Disclosure of sold/ booked inventoryFile: INVENTORY ZILLENIA 30092024.pdf23 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ZILLENIA 30092024.pdf18 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 ZILLENIA Signed Final Compressed.pdf18 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 ZILLENIA 2023-24.pdf16 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Zillenia Signed 30062024 Compressed.pdf2 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Zillenia Signed 30062024 Compressed.pdf2 Aug 2024
Disclosure of sold/ booked inventoryFile: Zillenia Sold Unsold 30-6-24 2.pdf27 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ZILLENIA 11072024.pdf25 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: March 2024-Qx.pdf25 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ZILLENIA 30062024.pdf25 Jul 2024
Disclosure of sold/ booked inventoryFile: 13Zillenia Sep23.pdf12 Jun 2024
Disclosure of sold/ booked inventoryFile: 12Zillenia Dec23_compressed.pdf12 Jun 2024
Disclosure of sold/ booked inventoryFile: 11Zillenia_compressed.pdf12 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 _Zillenia _ Apr 24.pdf8 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 41 Zillenia -2023 -24.pdf7 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_ Signed_11zon.pdf21 May 2024
Layout approvalFile: scan339_compressed.pdf9 May 2024
Building plan approvalFile: scan340_compressed.pdf9 May 2024
Building plan approvalFile: scan341_compressed.pdf9 May 2024
Building plan approvalFile: scan342_compressed.pdf9 May 2024
Building plan approvalFile: scan343_compressed.pdf9 May 2024
Building plan approvalFile: scan344_compressed.pdf9 May 2024
Building plan approvalFile: scan347_compressed.pdf9 May 2024
Building plan approvalFile: scan348_compressed.pdf9 May 2024
Building plan approvalFile: scan349_compressed.pdf9 May 2024
Building plan approvalFile: scan350_compressed.pdf9 May 2024
Building plan approvalFile: scan351_compressed.pdf9 May 2024
Building plan approvalFile: scan352_compressed.pdf9 May 2024
Building plan approvalFile: scan353_compressed.pdf9 May 2024
Building plan approvalFile: scan354_compressed.pdf9 May 2024
Building plan approvalFile: scan355_compressed.pdf9 May 2024
Building plan approvalFile: scan356_compressed.pdf9 May 2024
Building plan approvalFile: scan357_compressed.pdf9 May 2024
Building plan approvalFile: scan358_compressed.pdf9 May 2024
Copy of Layout Approval (in case of layout)File: scan339_compressed.pdf9 May 2024
Building Plan Approval / NA Order for plotted developmentFile: scan340_compressed.pdf9 May 2024
Building Plan Approval / NA Order for plotted developmentFile: scan341_compressed.pdf9 May 2024
Building Plan Approval / NA Order for plotted developmentFile: scan342_compressed.pdf9 May 2024
Building Plan Approval / NA Order for plotted developmentFile: scan343_compressed.pdf9 May 2024
Building Plan Approval / NA Order for plotted developmentFile: scan344_compressed.pdf9 May 2024
Building Plan Approval / NA Order for plotted developmentFile: scan347_compressed.pdf9 May 2024
Building Plan Approval / NA Order for plotted developmentFile: scan348_compressed.pdf9 May 2024

How this compares with Pune

82%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep 41 Zillenia on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Punawala13,700+ in Pune

2 km41 ZilleniaCompleted 151Lapsed / revoked 106Other 121Dot size: filed unitsN

Filed coordinates, straight-line distance. 378 registered projects within 2 km.

Builder: Tirupati Skyscrapers LLP

Tirupati Skyscrapers LLP has 1 registration on MahaRERA, including 41 Zillenia. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if 41 Zillenia is delayed beyond 30 Sep 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of 41 Zillenia?

The registered promoter entity is Tirupati Skyscrapers LLP, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in 41 Zillenia?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against 41 Zillenia?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for 41 Zillenia?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at 41 Zillenia?

The professionals named in the filing: Architect: VK a architecture; Engineer: Vinayak Krushnaji Yenpure; Engineer: Pankaj Kolte; Engineer: Sadhu Pawar; Engineer: Tousif Mujawar; Chartered Accountant: Patel & Sharma. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in 41 Zillenia?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About 41 Zillenia. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save 41 Zillenia to a free account