Home / Browse projects / Pune, Maharashtra / 41 Zillenia Phase 2

Registered No litigation declared Residential / Group Housing project

41 Zillenia Phase 2

By Krisala Punawale LLP

RG-MH-23613 · RERA P52100078925 · Last updated on MahaRERA portal: 6 Jul 2026

Source: official MahaRERA filing

Red flags

  • Rs 7.50 crore secured on the land, in favour of PRACHAY CAPITAL LIMITED, Prachay Capital Limited

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Aug 2027Possession promisedno revision filed
1 of 11Construction stages donefurthest along: Basement (if any), 70%
63 of 166Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 127 documents Report an error

41 Zillenia Phase 2 is a Residential / Group Housing project by Krisala Punawale LLP in Pune, Maharashtra, registered with MahaRERA as P52100078925 on 21 Jan 2025. Possession is promised by 31 Aug 2027. 103 of the 166 units on this registration are recorded sold or booked, and 1 of 11 construction stages are filed complete.

At a glance

Project

  • Name41 Zillenia Phase 2
  • TypeResidential / Group Housing
  • Location
    • Gaikwad Wasti Road
    • Punawale
    • Mulshi
    • Pune
    • 411033
  • Pincode411033
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100078925
  • ReraGenie IDRG-MH-23613

Builder

  • NameKrisala Punawale LLP
  • Entity typePartnership
  • PartnerVishal Omprakash Agarwal

Key dates

this monthRegisteredJan 2025PromisedAug 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on21 Jan 2025
  • Promised completion31 Aug 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed127 files

Current status

62%103 of 166 units booked
29.3%Work done, per cost certificate

Figures as on 6 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Tower CNA17141660166

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 6 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

1 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 70%.

Tower C: 30% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)70%
Podiums (if any)0%
Plinth0%
Stilt Floor70%
Slabs of Super Structure70%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises13%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks10%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 6 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes5%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed371

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots371
Closed/Covered371

Land and ownership5

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area3,600 sq m
Land owned byNot the promoter
Named landowners5
Encumbrance on the landDeclared present
Charge in favour ofPRACHAY CAPITAL LIMITED, Prachay Capital Limited
Secured amountRs 7.50 crore
CERSAI search filedYes
Declared on27 Apr 2026
LandownerVillageDistrict
Koyana MohitePunawalePune
Vaishali MotePunawalePune
Sangita NelekarKodit Bk.Pune
Ashwini DharpalePunawalePune
Navnath Ramdas MohitePunawalePune

Approvals and building plan

Sanctioning authorityPimpri Chinchwad Municipal Corporation
Permissible FSI14400.0
Proposed, not sanctioned14,328 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchICICI Bank Ltd., Shop No. 7,8,9 & 10, Empire Square, City Survey No. 4746, Next to Auto Cluster, Off Pune Mumbai Highway, Chinchwad, Pune, Maharashtra - 411019
Estimated costRs 30.00 cr
Cost incurredRs 8.78 cr
Work done29.26%
BuildingWingEstimatedIncurred
Tower CNARs 24.00 crRs 7.31 cr
-NARs 6.00 crRs 1.46 cr

Certifying professionals and partners8

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectHrishikesh Kulkarni
EngineerPankaj Kolte
EngineerSadhu Pawar
EngineerRanjit Dalavi
Chartered AccountantA S A K & Co Chartered Accountants
Chartered AccountantAgarwal and Sarawgi Associates
Chartered AccountantPatel & Sharma
Chartered AccountantDIPALI SHELAR AND COMPANY
PartnerRole in project
Krisala Punawale LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 8 Dec 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 9 Dec 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 9 Dec 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 28 Nov 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Aug 2027

Documents filed127

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 127 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: Form 2A-Zillenia Ph 2.pdf6 Jul 2026
Form 5 (FY 2025-2026)File: Form 5.pdf9 Jun 2026
Withdrawal Update Form 1File: Form-1- 41 ZILLENIA PH II_signed.pdf7 May 2026
Withdrawal Update Form 2File: Form 2 - 41 Zillenia Phase 2_ Signed.pdf7 May 2026
Withdrawal Update Form 3File: Form 3 41 Zillenia Phase II_ Signed.pdf7 May 2026
Withdrawal Update Form 1File: FORM 1 ZILLENIA PH II.pdf24 Feb 2026
Withdrawal Update Form 2File: Form 2 signed.pdf24 Feb 2026
Withdrawal Update Form 3File: Form 3 Final_.pdf24 Feb 2026
Layout approvalFile: 01-29 Layout_.pdf9 Dec 2025
Building plan approvalFile: 18-29 Tower C.pdf9 Dec 2025
Building plan approvalFile: 19-29 Tower C.pdf9 Dec 2025
Building plan approvalFile: 20-29 Tower C.pdf9 Dec 2025
Building plan approvalFile: 21-29 Tower C.pdf9 Dec 2025
Building plan approvalFile: 22-29 Tower C.pdf9 Dec 2025
Building plan approvalFile: 23-29 Tower C.pdf9 Dec 2025
Building plan approvalFile: 24-29 Tower C.pdf9 Dec 2025
Building plan approvalFile: 25-29 Tower C.pdf9 Dec 2025
Building plan approvalFile: 26-29 Tower C.pdf9 Dec 2025
Form 2A (FY 2024-2025)File: form2A ZILLENIA2 2425.pdf29 Oct 2025
Withdrawal Update Form 1File: FORM 1 ZILLENIA PHASE 2 -30092025.pdf27 Oct 2025
Withdrawal Update Form 2File: Form 2.pdf27 Oct 2025
Withdrawal Update Form 3File: Form 3.pdf27 Oct 2025
Form 5 (FY 2024-2025)File: Form 5 ZILLENIA PHASE 2- 2024-2025.pdf10 Oct 2025
Withdrawal Update Form 1File: Form 1_.pdf24 Sep 2025
Withdrawal Update Form 1File: Form 1_.pdf24 Sep 2025
Withdrawal Update Form 2File: form 2 zllenia phase 2_.pdf24 Sep 2025
Withdrawal Update Form 2File: form 2 zllenia phase 2_.pdf24 Sep 2025
Withdrawal Update Form 3File: FORM 3 ZILLENIA PHASE II 16072025.pdf24 Sep 2025
Withdrawal Update Form 3File: FORM 3 ZILLENIA PHASE II 16072025.pdf24 Sep 2025
Withdrawal Update Form 1File: Form 1_.pdf31 Jul 2025
Withdrawal Update Form 2File: form 2 zllenia phase 2_.pdf31 Jul 2025
Withdrawal Update Form 3File: FORM 3 ZILLENIA PHASE II 16072025.pdf31 Jul 2025
Layout approvalFile: 01-29 Layout_11zon.pdf17 Jul 2025
Building plan approvalFile: 18-29 Tower C.pdf17 Jul 2025
Building plan approvalFile: 19-29 Tower C.pdf17 Jul 2025
Building plan approvalFile: 20-29 Tower C.pdf17 Jul 2025
Building plan approvalFile: 21-29 Tower C.pdf17 Jul 2025
Building plan approvalFile: 22-29 Tower C.pdf17 Jul 2025
Building plan approvalFile: 23-29 Tower C.pdf17 Jul 2025
Building plan approvalFile: 24-29 Tower C.pdf17 Jul 2025
Building plan approvalFile: 25-29 Tower C.pdf17 Jul 2025
Building plan approvalFile: 26-29 Tower C.pdf17 Jul 2025
Withdrawal Update Form 1File: Form 1_.pdf17 Jul 2025
Withdrawal Update Form 1File: Form 1_.pdf17 Jul 2025
Withdrawal Update Form 1File: Form 1_.pdf17 Jul 2025
Withdrawal Update Form 1File: Form 1_.pdf17 Jul 2025
Withdrawal Update Form 2File: form 2 zllenia phase 2_.pdf17 Jul 2025
Withdrawal Update Form 2File: form 2 zllenia phase 2_.pdf17 Jul 2025
Withdrawal Update Form 2File: form 2 zllenia phase 2_.pdf17 Jul 2025
Withdrawal Update Form 2File: form 2 zllenia phase 2_.pdf17 Jul 2025
Withdrawal Update Form 3File: FORM 3 ZILLENIA PHASE II 30062025_.pdf17 Jul 2025
Withdrawal Update Form 3File: FORM 3 ZILLENIA PHASE II 30062025_.pdf17 Jul 2025
Withdrawal Update Form 3File: FORM 3 ZILLENIA PHASE II 30062025_.pdf17 Jul 2025
Withdrawal Update Form 3File: FORM 3 ZILLENIA PHASE II 16072025.pdf17 Jul 2025
Form 1File: form 1 zillenia phase 2.pdf15 Jul 2025
Form 2File: form 2 zillenia phase 2 (1).pdf15 Jul 2025
Form 3File: Form 03 March 2025.pdf15 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Zillenia phase 2.pdf15 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 zillenia phase 2.pdf6 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Zillenia Phase 2.pdf3 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 zillenia phase 2 (1).pdf3 May 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold Zillenia phase 2.pdf3 May 2025
Proforma of Allotment letterFile: allotment letter zillenia phase 2 rizz with new encumbrances_compressed.pdf21 Feb 2025
Proforma of Allotment letterFile: allotment letter zillenia phase 2 rizz with new encumbrances_compressed.pdf21 Feb 2025
Details of encumbrances concerned to FinanceFile: zillenia Encumbrances signed.pdf20 Feb 2025
Details of encumbrances concerned to LegalFile: zillenia Encumbrances signed.pdf20 Feb 2025
Details of encumbrances concerned to FinanceFile: zillenia Encumbrances signed.pdf20 Feb 2025
Details of encumbrances concerned to LegalFile: zillenia Encumbrances signed.pdf20 Feb 2025
Other - FinanceFile: LANDOWNER'S DECLARATION - LAND COST.pdf18 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 08012025.pdf8 Jan 2025
Building plan approvalFile: 20 -28.pdf3 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: 20 -28.pdf3 Jan 2025
Other - TechnicalFile: DECLARATION AS TO PARKING - ZILLENIA 2.pdf3 Jan 2025
Other - FinanceFile: DECLARATION AS TO SATISFATION OF MORTGAGE.pdf26 Dec 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: FORMAT A - SEPARATE BANK ACCOUNT.pdf23 Dec 2024
Other - FinanceFile: CERSAI REPORT.pdf23 Dec 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: FORMAT B.pdf21 Dec 2024
Details of encumbrances concerned to FinanceFile: FINANCE ENCUMBRANCE.pdf20 Dec 2024
Details of encumbrances concerned to LegalFile: FINANCE ENCUMBRANCE.pdf20 Dec 2024
Disclosure for secured/unsecured finance availed for the projectFile: DISCLOSURE SECURED UNSECURED LOAN.pdf20 Dec 2024

How this compares with Pune

62%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep 41 Zillenia Phase 2 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Punawale13,700+ in Pune

2 km41 Zillenia Phase 2Completed 151Lapsed / revoked 106Other 121Dot size: filed unitsN

Filed coordinates, straight-line distance. 378 registered projects within 2 km.

Builder: Krisala Punawale LLP

Krisala Punawale LLP has 1 registration on MahaRERA, including 41 Zillenia Phase 2. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if 41 Zillenia Phase 2 is delayed beyond 31 Aug 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of 41 Zillenia Phase 2?

The registered promoter entity is Krisala Punawale LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in 41 Zillenia Phase 2?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for 41 Zillenia Phase 2?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at 41 Zillenia Phase 2?

The professionals named in the filing: Architect: Hrishikesh Kulkarni; Engineer: Pankaj Kolte; Engineer: Sadhu Pawar; Engineer: Ranjit Dalavi; Chartered Accountant: A S A K & Co Chartered Accountants; Chartered Accountant: Agarwal and Sarawgi Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in 41 Zillenia Phase 2?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About 41 Zillenia Phase 2. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save 41 Zillenia Phase 2 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.