ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / 41 ELITE

Completed No litigation declared Residential / Group Housing project

41 ELITE

By M/S KRISALA ENTERPRISES

RG-MH-17139 · RERA P52100027958 · Last updated on MahaRERA portal: 26 Jul 2024

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jun 2024Possession promisedregistration recorded completed
3 of 11Construction stages donefurthest along: Slabs of Super Structure, 60%
1Complaints at MahaRERAon this registration
Jump to the 99 documents Report an error

41 ELITE is a Residential / Group Housing project by M/S KRISALA ENTERPRISES in Pune, Maharashtra, registered with MahaRERA as P52100027958 on 21 Jan 2021. The registration is recorded completed; possession was promised by 30 Jun 2024. 1 complaint is on record with the regulator.

At a glance

Project

  • Name41 ELITE
  • TypeResidential / Group Housing
  • Location
    • JEEVAN NAGAR ROAD
    • TATHAWADE
    • Tathwade
    • Mulshi
    • Pune
    • 411033
  • Pincode411033
  • RERA no.P52100027958
  • ReraGenie IDRG-MH-17139

Builder

  • NameM/S KRISALA ENTERPRISES
  • Entity typePartnership
  • PartnerVISHAL OMPRAKASH AGARWAL
  • Other registrations5 more →
  • Completed5 of 6
  • No longer live1 lapsed, de-registered or revoked

Key dates

this monthRegisteredJan 2021PromisedJun 2024Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on21 Jan 2021
  • Promised completion30 Jun 2024
  • Revised completionNone
  • Buildings1 building record
  • Documents filed99 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
F BUILDINGNA160000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 26 Jul 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 60%.

F BUILDING: 33% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure60%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises5%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 26 Jul 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed59

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots59
Closed/Covered49
Open Space10

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,296 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI6617.7
Proposed, not sanctioned6,618 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchDR AMBEDKAR CHOWK RAVET PUNE

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectUNUSUALSPACES
EngineerPANKAJ VISHNU KOLATE
Chartered AccountantPARAKH SHAH& ASSOCIATES
PartnerRole in project
M/S KRISALA ENTERPRISES-

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC12503811Akhilesh GuptaM/S KRISALA ENTERPRISES31/10/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 9 Jan 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 14 Aug 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 8 Jan 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 11 Nov 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 7 Jun 2024

Documents filed99

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 99 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Status of Formation of Legal Entity (Society/Co Op etc.)File: 41 Elite D E F.pdf26 Jul 2024
Architect’s Certificate on Completion of Project (Form 4)File: FORM 4 - 41 Elite F.pdf9 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 41 Elite F Wing -Mar 24.pdf20 Jun 2024
Disclosure of sold/ booked inventoryFile: 6Elite F.pdf12 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 41 Elite F Wing 2020-21.pdf10 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 41Elite Phase-3 form2 31-03-24.pdf8 Jun 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 41 Elite All.pdf7 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 08 30-06-2023_compressed.pdf3 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 09 30-09-2023_0001.pdf3 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 10 31-12-2023_0001.pdf3 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 11 31-03-2024_0001.pdf3 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 F Bldg Elite.pdf28 May 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 F Bldg Elite.pdf28 May 2024
Proforma of Agreement for saleFile: 3 41 Elite - F Bldg - Agreement for Sale_compressed.pdf24 May 2024
Deviation Report with respect to Allotment letterFile: 2 41 Elite - F building - Deviation Report - Allotment Letter.pdf24 May 2024
Deviation Report with respect to model copy of AgreementFile: 4 41 Elite - F Building - Deviation Report - AFS_compressed.pdf24 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 41 Elite F 30-06-2022.pdf22 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 41 Elite F 30-06-2023.pdf22 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 41 Elite F 31-03-2022.pdf22 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 41 Elite F 31-12-2022.pdf22 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form_2A_Elite_F_March_22.pdf22 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form_2A_Elite_F_March_23.pdf22 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 01 30-09-2021_0001.pdf18 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 02 31-12-2021_0001.pdf18 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 05 30-09-2022_0001.pdf18 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 07 31-03-2023_.pdf18 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 08 31-12-2023_0001.pdf18 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 09 30-09-2023_0001.pdf18 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 10 31-03-2024_0001.pdf18 May 2024
Details of encumbrances concerned to FinanceFile: 41 elite legal F.pdf16 May 2024
Details of encumbrances concerned to FinanceFile: 41 elite finance F.pdf16 May 2024
Details of encumbrances concerned to LegalFile: 41 elite legal F.pdf16 May 2024
Details of encumbrances concerned to LegalFile: 41 elite finance F.pdf16 May 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: KRISALA INFRACON LLP.pdf15 May 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: MAHESH SHIVAJI RAUT.pdf15 May 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: sagar omprakash agarwal.pdf15 May 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: TULSIDAS RATANSHI PATEL.pdf15 May 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: VISHAL OMPRAKASH AGARWAL.pdf15 May 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: 41 Elite F building 21-22.pdf11 May 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: 41 Elite F building 22-23.pdf11 May 2024
Disclosure of sold/ booked inventoryFile: 02 30-09-2021.pdf30 Apr 2024
Disclosure of sold/ booked inventoryFile: 03 31-12-2021.pdf30 Apr 2024
Disclosure of sold/ booked inventoryFile: 04 31-03-2022.pdf30 Apr 2024
Disclosure of sold/ booked inventoryFile: 05 30-06-2022.pdf30 Apr 2024
Disclosure of sold/ booked inventoryFile: 06 30-09-2022.pdf30 Apr 2024
Disclosure of sold/ booked inventoryFile: 07 31-12-2022.pdf30 Apr 2024
Disclosure of sold/ booked inventoryFile: 08 31-03-2023.pdf30 Apr 2024
Disclosure of sold/ booked inventoryFile: 09 30-06-2023.pdf30 Apr 2024
Disclosure of sold/ booked inventoryFile: 10 30-09-2023.pdf30 Apr 2024
Disclosure of sold/ booked inventoryFile: 11 31-12-2023.pdf30 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 01 30-06-2021_0001.pdf8 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 02 30-09-2021_0001.pdf8 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 03 31-12-2021_0001.pdf8 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 04 31-03-2022_0001.pdf8 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 05 30-06-2022_0001.pdf8 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 06 30-09-2022_0001.pdf8 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 07 31-12-2022_0001.pdf8 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 08 31-03-2023_0001.pdf8 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 09 30-06-2023_0001.pdf8 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 10 30-09-2023_0001.pdf8 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 11 31-12-2023_0001.pdf8 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 01 30-06-2021_0001_9_11zon.pdf8 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 02 30-09-2021_0001_10_11zon.pdf8 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 03 31-12-2021_0001_11_11zon.pdf8 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 04 31-03-2022_0001_1_11zon.pdf8 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 05 30-06-2022_0001_2_11zon.pdf8 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 06 30-09-2022_0001_3_11zon.pdf8 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 07 31-12-2022_0001_4_11zon.pdf8 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 08 31-03-2023_0001_5_11zon.pdf8 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 09 30-06-2023_0001_6_11zon.pdf8 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 10 30-09-2023_0001_7_11zon.pdf8 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 11 31-12-2023_0001_8_11zon.pdf8 Apr 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Seperate Bank Account_0001.pdf8 Apr 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: 41 ELITE F BUILDING F Y 2020-21.pdf14 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form_1_Elite_DE and F_March_22_11zon.pdf22 Dec 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form_1_Elite_DE and F_Nov_22_11zon.pdf22 Dec 2022
Proforma of Allotment letterFile: 41ELITE-2 0- RERA Draft.pdf21 Oct 2022
Details of encumbrancesFile: Elite_Encumbarance_Fullerton India.pdf14 Oct 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form-2A_Elite_F.pdf17 Sep 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: F_BUILDING_July_22_11zon.pdf8 Sep 2022

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep 41 ELITE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near TATHAWADE13,700+ in Pune

Builder: M/S KRISALA ENTERPRISES

M/S KRISALA ENTERPRISES has 6 registrations on MahaRERA, including 41 ELITE and 41 ELITE A BUILDING PHASE 2. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if 41 ELITE is delayed beyond 30 Jun 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of 41 ELITE?

The registered promoter entity is M/S KRISALA ENTERPRISES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in 41 ELITE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against 41 ELITE?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for 41 ELITE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at 41 ELITE?

The professionals named in the filing: Architect: UNUSUALSPACES; Engineer: PANKAJ VISHNU KOLATE; Chartered Accountant: PARAKH SHAH& ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in 41 ELITE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About 41 ELITE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save 41 ELITE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.