ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / 41 ELITE PHASE 3 BUILDING C

Registration lapsed No litigation declared Others project

41 ELITE PHASE 3 BUILDING C

By M/S KRISALA ENTERPRISES

RG-MH-16956 · RERA P52100027496 · Last updated on MahaRERA portal: 19 Jul 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 16 months past the filed date
  • Completion date moved by 24 months
  • 3 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jun 2025Possession promised16 months past this date
8 of 11Construction stages donefurthest along: Installation of Lifts, 95%
34 of 45Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 145 documents Report an error

41 ELITE PHASE 3 BUILDING C is a Others project by M/S KRISALA ENTERPRISES in Pune, Maharashtra, registered with MahaRERA as P52100027496 on 14 Dec 2020. Possession was promised by 30 Jun 2025 and is now 16 months past that date. The completion date has moved by 24 months from the original filing. 11 of the 45 units on this registration are recorded sold or booked, and 8 of 11 construction stages are filed complete.

At a glance

Project

  • Name41 ELITE PHASE 3 BUILDING C
  • TypeOthers
  • Location
    • JEEVAN NAGAR ROAD
    • SHARYU TOYOTA TATHAWADE
    • Tathwade
    • Mulshi
    • Pune
    • 411033
  • Pincode411033
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100027496
  • ReraGenie IDRG-MH-16956

Builder

  • NameM/S KRISALA ENTERPRISES
  • Entity typePartnership
  • PartnerKrisala Infracon LLP
  • Other registrations5 more →
  • Completed5 of 6
  • No longer live1 lapsed, de-registered or revoked

Key dates

16 months past promisethis monthRegisteredDec 2020First promiseJun 2023Revised toJun 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on14 Dec 2020
  • Promised completion30 Jun 2025
  • Revised completionRevised to 30 Jun 2025 (originally 30 Jun 2023)
  • Buildings1 building record
  • Documents filed145 files

Current status

24%11 of 45 units booked

Figures as on 19 Jul 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
COMMERCIAL AND MHADANA1111182745

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 19 Jul 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 11 construction stages are filed complete. The stage furthest along is Installation of Lifts, at 95%.

COMMERCIAL AND MHADA: 81% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%

Progress on shared amenities16

As on 19 Jul 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes90%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%
Others (Option to Add more)Yes0%

Parking filed32

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots32
Open Space32

Land and ownership3

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,200 sq m
Land owned byThe promoter, with other names on the file
Named landowners3
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on26 Sep 2025
LandownerVillageDistrict
SAILENDRA PRALHAD GAWADEPimpri Chinchawad (M Corp.)Pune
GORAKSHA BALAWADKARPune (M Corp.)Pune
SAMBHAJI KALATEWakadPune

Approvals and building plan

Sanctioning authorityPimpri Chinchwad Municipal Corporation
Permissible FSI2560.89
Proposed, not sanctioned1,252 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchDR AMBEDKAR CHOWK RAVET PUNE 412101

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectUNUSUAL SPACES
EngineerPANKAJ KOLTE
Chartered AccountantNamrata Kalpesh Dhruve& Co. (Chartered Accountants)
Chartered AccountantA S A K & Co Chartered Accountants
Chartered AccountantAgarwal Sarawgi and Associates
PartnerRole in project
M/S KRISALA ENTERPRISES-

Extensions applied for3

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100024167Jun 2023 → Dec 2024

Reason as filed by the promoterProject progress is delayed due to shortage of labour and material. Will require another 6 months to complete the same and obtain occupancy certificate from local authorities. Consent of 51% of Allottees are uploaded.

EXT52100017197Jun 2023 → Jun 2024

Reason as filed by the promoterConstruction of the project is completed almost in all aspects, we will require another 12 months to complete the project and get the Occupation certificate from the concerned authorities.

EXT52100027609Jun 2023 → Jun 2025

Reason as filed by the promoterThe project has encountered unforeseen challenges that have significantly impacted its timeline and progress. These challenges include: 1. Severe Labour Shortage: o The project has been critically affected by a shortage of skilled labour, which is essential for maintaining the desired quality and pace of construction. o The labour shortage has been exacerbated by external factors, including market-wide labour demand, seasonal migrations, and economic disruptions. This has led to a delay in completing key milestones. 2. Impact on Contractor's Performance: o The labour shortage has directly impa

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 3 Dec 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 6 Jul 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 3 Dec 2020
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 13 Aug 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed145

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 145 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: form 1 Elite Phase 3.pdf19 Jul 2025
Form 2File: form 2 elite c June 2025.pdf19 Jul 2025
Disclosure of Sold and Booked InventoryFile: inventory 41 elite c June 2025.pdf19 Jul 2025
Form 3File: form 3 elite c June 2025.pdf19 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 Elite C Mar 25.pdf18 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 elite.pdf18 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 elite c.pdf18 Apr 2025
Disclosure of sold/ booked inventoryFile: inventory elite.pdf18 Apr 2025
Declaration in FORM BFile: FORM B - ELITE C_rotated_organized.pdf18 Feb 2025
Declaration in FORM BFile: FORM B - ELITE C_rotated_organized_organized (1).pdf18 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 elite c dec24.pdf30 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 Dec 2024.pdf20 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Elite C form 3.pdf18 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Elite C form 3.pdf17 Jan 2025
Disclosure of sold/ booked inventoryFile: Elite C Sold Unsold.pdf17 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 ELITE C 30092024.pdf23 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ELITE C 30092024.pdf23 Oct 2024
Disclosure of sold/ booked inventoryFile: INVENTORY ELITE C 30092024.pdf23 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ELITE C 30092024.pdf19 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 ELITE C 2023-24.pdf16 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ELITE C BUILDING 30062024.pdf2 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ELITE C BUILDING 30062024.pdf2 Aug 2024
Disclosure of sold/ booked inventoryFile: Elite C.pdf2 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 41 Elite C Form 3 Krisala Enterprises C Bldg.pdf2 Aug 2024
Details of encumbrancesFile: elite phase 3 Building C - fullerton.pdf31 Jul 2024
Details of encumbrancesFile: Elite Phase 3 c building - Prachay.pdf31 Jul 2024
Declaration in FORM BFile: FORM B - ELITE C.pdf29 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Elite C building_Sept 23.pdf20 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Elite C building_Dec 23.pdf20 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Elite C building_March 24.pdf20 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 41 Elite C Wing -Mar 24.pdf20 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Elite form 3 C Bldg 30_09_2023.pdf19 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Elite form 3 C Bldg 31_12_2023.pdf19 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Elite form 3 C Bldg 31_03_2024.pdf19 Jun 2024
Disclosure of sold/ booked inventoryFile: Sep23_0001.pdf14 Jun 2024
Disclosure of sold/ booked inventoryFile: Dec_0001.pdf14 Jun 2024
Disclosure of sold/ booked inventoryFile: Mar24_0001.pdf14 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 30Sep23.pdf7 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 31Dec23.pdf7 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 31Mar24-1-3.pdf7 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form_2A_Elite_C_March_23.pdf22 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate - Bldg C - 31-03-2021_organized.pdf1 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 Architect Certificate - Bldg C - 30-06-2021_organized.pdf1 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2 Architect Certificate - Bldg C - 30-09-2021_organized.pdf1 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 3 Architect Certificate - Bldg C - 31-12-2021_organized.pdf1 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 4 Architect Certificate - Bldg C - 31-03-2022_organized.pdf1 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 Architect Certificate - Bldg C - 30-06-2022.pdf1 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2 Architect Certificate - Bldg C - 30-09-2022_organized.pdf1 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 3 Architect Certificate - Bldg C - 31-12-2022_organized.pdf1 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 4 Architect Certificate - Bldg C - 31-03-2023_organized.pdf1 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form_1_30-06-2023.pdf1 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form_2_30-06-2023_organized.pdf1 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: From 3 C Bldg 8_31-03-2021.pdf1 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 1 From 3 C Bldg 9_30-06-2021.pdf1 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 2 From 3 C Bldg 7_30-09-2021.pdf1 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3 From 3 C Bldg 5_31-12-2021.pdf1 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 4 From 3 C Bldg 4_31-03-2022.pdf1 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 1 From 3 C Bldg 3_30-06-2022.pdf1 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 2 From 3 C Bldg 2_30-09-2022.pdf1 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3 From 3 C Bldg 1_31-12-2022.pdf1 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 4 From 3 C Bldg 10_31-03-2023.pdf1 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 30_06_2023.pdf1 Aug 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5_2020-21.pdf24 Jul 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5_2021-22.pdf24 Jul 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5_2022-23.pdf24 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q4 31-03-2021.pdf22 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q1 30-06-2021.pdf22 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q2 30-09-2021.pdf22 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q3 31-12-2021.pdf22 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q4 31-03-2022.pdf22 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q1 30-06-2022.pdf22 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q2 30-09-2022.pdf22 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q3 31-12-2022.pdf22 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q4 31-03-2023.pdf22 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q1 Form_1_30_June_21.pdf22 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q2 Form_1_30_Sep_21.pdf22 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q3 Form_1_31_Dec_21.pdf22 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q4 Form_1_31_March_22.pdf22 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q1 Form_1_30_June_22.pdf22 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q2 Form_1_30_Sep_22.pdf22 Jul 2023

How this compares with Pune

24%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 24 months
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep 41 ELITE PHASE 3 BUILDING C on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near SHARYU TOYOTA TATHAWADE13,700+ in Pune

2 km41 ELITE PHASE 3 BUILDINCompleted 116Lapsed / revoked 116Other 36Dot size: filed unitsN

Filed coordinates, straight-line distance. 268 registered projects within 2 km.

Builder: M/S KRISALA ENTERPRISES

M/S KRISALA ENTERPRISES has 6 registrations on MahaRERA, including 41 ELITE and 41 ELITE A BUILDING PHASE 2. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that 41 ELITE PHASE 3 BUILDING C shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if 41 ELITE PHASE 3 BUILDING C is delayed beyond 30 Jun 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of 41 ELITE PHASE 3 BUILDING C?

The registered promoter entity is M/S KRISALA ENTERPRISES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in 41 ELITE PHASE 3 BUILDING C?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for 41 ELITE PHASE 3 BUILDING C?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at 41 ELITE PHASE 3 BUILDING C?

The professionals named in the filing: Architect: UNUSUAL SPACES; Engineer: PANKAJ KOLTE; Chartered Accountant: Namrata Kalpesh Dhruve& Co. (Chartered Accountants); Chartered Accountant: A S A K & Co Chartered Accountants; Chartered Accountant: Agarwal Sarawgi and Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in 41 ELITE PHASE 3 BUILDING C?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About 41 ELITE PHASE 3 BUILDING C. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save 41 ELITE PHASE 3 BUILDING C to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.