Red flags
- Registration lapsed
- Possession 16 months past the filed date
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
41 COSMO BLDNG B and D is a Residential / Group Housing project by MS KRISALA ENTERPRISES LLP in Pune, Maharashtra, registered with MahaRERA as P52100032772 on 29 Jan 2022. Possession was promised by 30 Jun 2025 and is now 16 months past that date. 141 of the 144 units on this registration are recorded sold or booked, and 14 of 22 construction stages are filed complete.
At a glance
Project
- Name41 COSMO BLDNG B and D
- TypeResidential / Group Housing
- Location
- Jeevan Nagar
- Tathawade
- Tathwade
- Mulshi
- Pune
- 411033
- Pincode411033
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100032772
- ReraGenie IDRG-MH-22978
Builder
- NameMS KRISALA ENTERPRISES LLP
- Entity typePartnership
- PartnerSAGAR OMPRAKASH AGARWAL
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on29 Jan 2022
- Promised completion30 Jun 2025
- Revised completionNone
- Buildings2 building records
- Documents filed299 files
Current status
Figures as on 1 Jul 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| BUILDING B | NA | 23 | 21 | 72 | 0 | 72 |
| BUILDING D | NA | 23 | 21 | 72 | 0 | 72 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 1 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
14 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Internal walls, at 90%.
BUILDING B86%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 90% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 80% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 80% |
BUILDING D86%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 90% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 80% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 80% |
Progress on shared amenities15
As on 1 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 70% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 80% |
| Street Lighting | Yes | 0% |
| Community Buildings | Yes | 100% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 50% |
| Fire protection and fire safety requirements | Yes | 80% |
| Electrical meter room, sub-station, receiving station | Yes | 70% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed210
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| BUILDING B | 75 | 30 | 105 |
| BUILDING D | 75 | 30 | 105 |
Land and ownership8
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| SANDEEP SAHEBRAO PAWAR | Tathwade | Pune |
| SHEELA SANDEEP PAWAR | Tathwade | Pune |
| SUNIL TUKARAM PAWAR | Tathwade | Pune |
| SARITA SUNIL PAWAR | Tathwade | Pune |
| ANIL TUKARAM PAWAR | Tathwade | Pune |
| SNEHAL ANIL PAWAR | Tathwade | Pune |
| TUKARAM DNYANOBA PAWAR | Tathwade | Pune |
| AASHA SUBHASH THORVE | charholi kh | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| BUILDING B | NA | Rs 22.26 cr | Rs 18.58 cr |
| BUILDING D | NA | Rs 22.26 cr | Rs 18.58 cr |
| - | NA | Rs 11.13 cr | Rs 9.29 cr |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | CUBIX ARCHITECTS ASSOCIATES |
| Engineer | PANKAJ VISHNU KOLTE |
| Chartered Accountant | VS RATHI & ASSOCIATES |
| Chartered Accountant | S O SHARMA & CO Chartered Accountant |
| Chartered Accountant | Agarwal and Sarawgi Associates |
| Partner | Role in project |
|---|---|
| MS KRISALA ENTERPRISES LLP | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 13 Jan 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 23 May 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 23 May 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 2 Feb 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed299
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 299 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: FORM 1 COSMO BD 30092024.pdf | 1 Jul 2026 |
| Form 2File: FORM 2 COSMO BD 30092024.pdf | 1 Jul 2026 |
| Form 3File: FORM 3 COSMO BD 30092024.pdf | 1 Jul 2026 |
| Disclosure of Sold and Booked InventoryFile: INVENTORY COSMO BD 30092024.pdf | 1 Jul 2026 |
| Disclosure of Sold and Booked InventoryFile: INVENTORY COSMO BD 30062024.pdf | 1 Jul 2026 |
| Form 3File: FORM 3 COSMO BD 30062024.pdf | 1 Jul 2026 |
| Form 2File: FORM 2 COSMO BD 30062024.pdf | 1 Jul 2026 |
| Form 1File: FORM 1 COSMO BD 30062024.pdf | 1 Jul 2026 |
| Form 1File: FORM 1 COSMO BD 31032024.pdf | 1 Jul 2026 |
| Form 2File: FORM 2 COSMO BD 31032024.pdf | 1 Jul 2026 |
| Form 3File: FORM 3 COSMO BD 31032024.pdf | 1 Jul 2026 |
| Disclosure of Sold and Booked InventoryFile: INVENTORY COSMO BD 31032024.pdf | 1 Jul 2026 |
| Disclosure of Sold and Booked InventoryFile: INVENTORY COSMO BD 31122023.pdf | 1 Jul 2026 |
| Form 3File: FORM 3 COSMO BD 31122023.pdf | 1 Jul 2026 |
| Form 2File: FORM 2 COSMO BD 31122023.pdf | 1 Jul 2026 |
| Form 1File: FORM 1 COSMO BD 31122023.pdf | 1 Jul 2026 |
| Form 1File: FORM 1 COSMO BD 30092023.pdf | 1 Jul 2026 |
| Form 2File: FORM 2 COSMO BD 30092023.pdf | 1 Jul 2026 |
| Form 3File: FORM 3 COSMO BD 30092023.pdf | 1 Jul 2026 |
| Disclosure of Sold and Booked InventoryFile: INVENTORY COSMO BD 30092023.pdf | 1 Jul 2026 |
| Disclosure of Sold and Booked InventoryFile: INVENTORY COSMO BD 30062023.pdf | 1 Jul 2026 |
| Form 3File: FORM 3 COSMO BD 30062023.pdf | 1 Jul 2026 |
| Form 2File: FORM 2 COSMO BD 30062023.pdf | 1 Jul 2026 |
| Form 1File: FORM 1 COSMO BD 30062023.pdf | 1 Jul 2026 |
| Form 1File: FORM 1 COSMO BD 31032023.pdf | 1 Jul 2026 |
| Form 2File: FORM 2 COSMO BD 31032023.pdf | 1 Jul 2026 |
| Form 3File: FORM 3 COSMO BD 31032023.pdf | 1 Jul 2026 |
| Disclosure of Sold and Booked InventoryFile: INVENTORY COSMO BD 31032023.pdf | 1 Jul 2026 |
| Disclosure of Sold and Booked InventoryFile: INVENTORY COSMO BD 31122022.pdf | 1 Jul 2026 |
| Form 3File: FORM 3 COSMO BD 31122022.pdf | 1 Jul 2026 |
| Form 2File: FORM 2 COSMO BD 31122022.pdf | 1 Jul 2026 |
| Form 1File: FORM 1 COSMO BD 31122022.pdf | 1 Jul 2026 |
| Form 1File: FORM 1 COSMO BD 30092022.pdf | 1 Jul 2026 |
| Form 2File: FORM 2 COSMO BD 30092022.pdf | 1 Jul 2026 |
| Form 3File: FORM 3 COSMO BD 30092022.pdf | 1 Jul 2026 |
| Disclosure of Sold and Booked InventoryFile: INVENTORY COSMO BD 30092022.pdf | 1 Jul 2026 |
| Disclosure of Sold and Booked InventoryFile: INVENTORY COSMO BD 30062022.pdf | 1 Jul 2026 |
| Form 3File: FORM 3 COSMO BD 30062022.pdf | 1 Jul 2026 |
| Form 2File: FORM 2 COSMO BD 30062022.pdf | 1 Jul 2026 |
| Form 1File: FORM 1 COSMO BD 30062022.pdf | 1 Jul 2026 |
| Form 1File: FORM 1 COSMO BD 31032022.pdf | 1 Jul 2026 |
| Form 2File: FORM 2 COSMO BD 31032022.pdf | 1 Jul 2026 |
| Form 3File: FORM 3 COSMO BD 31032022.pdf | 1 Jul 2026 |
| Disclosure of Sold and Booked InventoryFile: INVENTORY COSMO BD 31032022.pdf | 1 Jul 2026 |
| Form 1File: form 1 Cosmo BD Mar 25.pdf | 25 Jun 2026 |
| Form 2File: from 2 cosmo b and d with signature.pdf | 25 Jun 2026 |
| Form 3File: Form 3 cosmo BD.pdf | 25 Jun 2026 |
| Disclosure of Sold and Booked InventoryFile: inventory cosmo b and d.pdf | 25 Jun 2026 |
| Form 1File: form 1 cosmo b and d31-12-24.pdf | 25 Jun 2026 |
| Form 2File: 41 COSMO FORM 2 dec-24.pdf | 25 Jun 2026 |
| Form 3File: 41 COSMO FORM 3_compressed.pdf | 25 Jun 2026 |
| Disclosure of Sold and Booked InventoryFile: 41 COSMO SOLD UNSOLD dec24.pdf | 25 Jun 2026 |
| Form 1File: form 1 Cosmo B and D.pdf | 24 Jul 2025 |
| Form 2File: Form 2.pdf | 24 Jul 2025 |
| Form 3File: cosmo bd form 3_.pdf | 24 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: inventory cosmo bd.pdf | 24 Jul 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 COSMO BD 31032025.pdf | 19 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 cosmo BD.pdf | 19 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: from 2 cosmo b and d with signature.pdf | 19 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: inventory cosmo b and d.pdf | 19 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 41 COSMO FORM 3_compressed.pdf | 14 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 41 COSMO FORM 2 dec-24 (1).pdf | 14 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: 41 COSMO SOLD UNSOLD dec24.pdf | 14 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 cosmo b and d31-12-24.pdf | 29 Jan 2025 |
| Details of encumbrances concerned to FinanceFile: COSMO BD.pdf | 6 Nov 2024 |
| Details of encumbrances concerned to LegalFile: COSMO BD.pdf | 6 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 COSMO BD 30092024 SIGNED 2.pdf | 23 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 COSMO BD 30092024.pdf | 23 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: INVENTORY COSMO BD 30092024.pdf | 23 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 COSMO BD 30092024.pdf | 18 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 COSMO BD 2023-24.pdf | 16 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Cosmo BD 31-3-24.pdf | 27 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: Cosmo BD 30-6-24.pdf | 27 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 COSMO BD 01072024.pdf | 25 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 COSMO BD 31032024.pdf | 25 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 COSMO BD 30062024.pdf | 25 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Cosmo BD Mar24 Signed_compressed.pdf | 20 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Cosmo BD Jun24 Signed_compressed.pdf | 20 Jul 2024 |
| Details of encumbrances concerned to FinanceFile: cosmo B D - capri.pdf | 16 Jul 2024 |
| Details of encumbrances concerned to LegalFile: cosmo B D - capri.pdf | 16 Jul 2024 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 299 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep 41 COSMO BLDNG B and D on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Tathawade13,700+ in Pune
Filed coordinates, straight-line distance. 91 registered projects within 2 km.
Construction of 24 LIG, 768 MIG and commercial
Pune Housing & Area Development Board
Kohinoor Avantara
Intofinity Promoters Private Limited
AISHWARYAM INSIGNIA
VIKSAK VINODE INFRATECH LLP
KOHINOOR UPTOWN AVENUE
MOONSTONE REALINFRA PRIVATE LIMITED
LUSH RESIDENCES
LUSH RESIDENCES LLP
RENUKA PANCHATATTVA
Renuka Realty Private Limited
Builder: MS KRISALA ENTERPRISES LLP
MS KRISALA ENTERPRISES LLP has 1 registration on MahaRERA, including 41 COSMO BLDNG B and D. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What does it mean that 41 COSMO BLDNG B and D shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if 41 COSMO BLDNG B and D is delayed beyond 30 Jun 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of 41 COSMO BLDNG B and D?
The registered promoter entity is MS KRISALA ENTERPRISES LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in 41 COSMO BLDNG B and D?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for 41 COSMO BLDNG B and D?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at 41 COSMO BLDNG B and D?
The professionals named in the filing: Architect: CUBIX ARCHITECTS ASSOCIATES; Engineer: PANKAJ VISHNU KOLTE; Chartered Accountant: VS RATHI & ASSOCIATES; Chartered Accountant: S O SHARMA & CO Chartered Accountant; Chartered Accountant: Agarwal and Sarawgi Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in 41 COSMO BLDNG B and D?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback