Home / Browse projects / Pune, Maharashtra / 41 Cosmo

Registered No litigation declared Residential / Group Housing project

41 Cosmo

By MS ORANGE KRISALA REALTY LLP

RG-MH-76002 · RERA P52100045292 · Last updated on MahaRERA portal: 20 Jul 2026

Source: official MahaRERA filing

Red flags

  • 69 complaints at MahaRERA
  • Completion date moved by 18 months
  • 1 extension taken

Clear

  • No litigation declared
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
May 2027Possession promisedmoved 18 months from the original
14 of 22Construction stages doneacross 2 buildings; furthest along: External plumbing and external plaster, 98%
4 of 266Units unsoldnot recorded sold or booked
69Complaints at MahaRERAon this registration
Jump to the 252 documents Report an error

41 Cosmo is a Residential / Group Housing project by MS ORANGE KRISALA REALTY LLP in Pune, Maharashtra, registered with MahaRERA as P52100045292 on 12 May 2022. Possession is promised by 30 May 2027. The completion date has moved by 18 months from the original filing. 262 of the 266 units on this registration are recorded sold or booked, and 14 of 22 construction stages are filed complete. 69 complaints are on record with the regulator.

At a glance

Project

  • Name41 Cosmo
  • TypeResidential / Group Housing
  • Location
    • Jeevan Nagar Road
    • Back of Sharayu Toyota
    • Tathwade
    • Mulshi
    • Pune
    • 411033
  • Pincode411033
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100045292
  • ReraGenie IDRG-MH-76002

Builder

  • NameMS ORANGE KRISALA REALTY LLP
  • Entity typePartnership
  • PartnersAADESH RAKESH SONIGARA, SAGAR OMPRAKASH AGARWAL, MAHESH SHIVAJI RAUT, TULSIDAS RATANSHIBHAI PATEL
  • Other registrations1 more →

Key dates

this monthRegisteredMay 2022First promiseNov 2025Revised toMay 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on12 May 2022
  • Promised completion30 May 2027
  • Revised completionRevised to 30 May 2027 (originally 30 Nov 2025)
  • Buildings2 building records
  • Documents filed252 files

Current status

98%262 of 266 units booked
100.0%Work done, per cost certificate

Figures as on 20 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
E BuildingNA22161890189
F BuildingNA211677077

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 20 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

14 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is External plumbing and external plaster, at 98%.

E Building92%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises94%
Sanitary Fittings within the flats / premises46%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.98%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.75%
F Building91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises87%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.70%

Progress on shared amenities15

As on 20 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes75%
Water SupplyYes80%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes75%
Storm Water DrainsYes35%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes25%
Energy managemcntYes80%
Fire protection and fire safety requirementsYes90%
Electrical meter room, sub-station, receiving stationYes75%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed266

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots266
Closed/Covered266
BuildingClosed/CoveredTotal
E Building189189
F Building7777

Land and ownership3

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area6,070 sq m
Land owned byThe promoter, with other names on the file
Named landowners3
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on18 Aug 2025
LandownerVillageDistrict
Sandeep Sahebrao PawarPimpri Chinchawad (M Corp.)Pune
Sunil Tukaram PawarPimpri Chinchawad (M Corp.)Pune
Anil Tukaram PawarPimpri Chinchawad (M Corp.)Pune

Approvals and building plan

Sanctioning authorityPimpri Chinchwad Municipal Corporation
Permissible FSI27549.77
Proposed, not sanctioned9,550 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPLOT NO 1, SECTOR 27A, PRADHIKARAN,NIGDI,PUNE, MAHARASHTRA,411044
Estimated costRs 93.23 cr
Cost incurredRs 93.23 cr
Work done100.0%
BuildingWingEstimatedIncurred
E BuildingNARs 37.29 crRs 37.29 cr
F BuildingNARs 37.29 crRs 37.29 cr
-NARs 18.65 crRs 18.65 cr

Certifying professionals and partners9

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectCUBIX ARCHITECTS ASSOCIATES
EngineerPANKAJ VISHNU KOLATE
EngineerVishal Amane
EngineerSandeep Patil
Chartered AccountantPatel & Sharma
Chartered AccountantA S A K & Co
Chartered AccountantPatel & Sharma Chartered Accountants
Chartered AccountantAgarwal Sarawagi and Associates
Chartered AccountantDipali Shelar And Company
PartnerRole in project
MS ORANGE KRISALA REALTY LLP-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA22112518410Nov 2025 → May 2027

Reason as filed by the promoter1. Escalation in Cost of Construction Materials and Services: The project was affected by a substantial rise in material and service costs, impacting financial viability. Vendors also demanded advance payments contrary to earlier terms, aggravating cash flow constraints. 2. Delay in Financial Disbursements: Disbursals from financial institutions were delayed due to revaluation processes and procedural delays in retail home loans, causing unavoidable liquidity issues despite the promoter’s best efforts. 3. Severe Labour Shortage: A persistent shortage of skilled labour adversely affected constr

Complaints filed with MahaRERA69

Case no.ComplainantRespondentFiled
CC005000000177887sanjay singhkrisala Developers06/12/2022
CC12400127Pratima Gopal RawaniMS ORANGE KRISALA REALTY LLP16/09/2024
CC12603280Omkesh KendreMS ORANGE KRISALA REALTY LLP01/06/2026
CC12603282Ashish SachanMS ORANGE KRISALA REALTY LLP01/06/2026
CC12603283Suyash TodkariMS ORANGE KRISALA REALTY LLP01/06/2026
CC12603399Preeti KhandelwalMS ORANGE KRISALA REALTY LLP03/06/2026
CC12603284Pratik GawaliMS ORANGE KRISALA REALTY LLP01/06/2026
CC12603285Vaishali UghadeMS ORANGE KRISALA REALTY LLP01/06/2026
CC12603286Hrushikesh GujarMS ORANGE KRISALA REALTY LLP01/06/2026
CC12603287Shubham BeldarMS ORANGE KRISALA REALTY LLP01/06/2026
CC12603288Jeevan PatilMS ORANGE KRISALA REALTY LLP01/06/2026
CC12603289Akshay BhotMS ORANGE KRISALA REALTY LLP01/06/2026
CC12603290Amol WaghMS ORANGE KRISALA REALTY LLP01/06/2026
CC12603291Swarupa ShelkeMS ORANGE KRISALA REALTY LLP01/06/2026
CC12603292Shubham JadhavMS ORANGE KRISALA REALTY LLP01/06/2026
CC12603293Divy KushwahMS ORANGE KRISALA REALTY LLP01/06/2026
CC12603294Shrirang DeshpandeMS ORANGE KRISALA REALTY LLP01/06/2026
CC12603296Pooja PopatMS ORANGE KRISALA REALTY LLP01/06/2026
CC12603297Prashant SurveMS ORANGE KRISALA REALTY LLP01/06/2026
CC12603298Bipin BhattMS ORANGE KRISALA REALTY LLP01/06/2026
CC12603299Abdulkadir MullaMS ORANGE KRISALA REALTY LLP01/06/2026
CC12603302Mukesh BhadaneMS ORANGE KRISALA REALTY LLP01/06/2026
CC12603303Alok GuptaMS ORANGE KRISALA REALTY LLP01/06/2026
CC12603305Rahul ShingoteMS ORANGE KRISALA REALTY LLP01/06/2026
CC12603306Pranit MalweMS ORANGE KRISALA REALTY LLP01/06/2026
CC12603307Prasad DanaveMS ORANGE KRISALA REALTY LLP01/06/2026
CC12603454Revati PatilMS ORANGE KRISALA REALTY LLP05/06/2026
CC12603308Mrugakshi DeshmukhMS ORANGE KRISALA REALTY LLP01/06/2026
CC12603309Yogesh ChaudhariMS ORANGE KRISALA REALTY LLP01/06/2026
CC12603310Vaishali MundeMS ORANGE KRISALA REALTY LLP01/06/2026
CC12603311Kanhayya MundadaMS ORANGE KRISALA REALTY LLP01/06/2026
CC12603389Suraj GoyalMS ORANGE KRISALA REALTY LLP03/06/2026
CC12603312Pravin JadhavMS ORANGE KRISALA REALTY LLP01/06/2026
CC12603313Mahesh SomsetwarMS ORANGE KRISALA REALTY LLP01/06/2026
CC12603314Ashwin PatilMS ORANGE KRISALA REALTY LLP01/06/2026
CC12603621Seeta SawantMS ORANGE KRISALA REALTY LLP12/06/2026
CC12603315Akash ChavanMS ORANGE KRISALA REALTY LLP01/06/2026
CC12603316Kunal ShindeMS ORANGE KRISALA REALTY LLP01/06/2026
CC12603319Harsh sonarkarMS ORANGE KRISALA REALTY LLP01/06/2026
CC12603320Prashant DeshmukhMS ORANGE KRISALA REALTY LLP01/06/2026
CC12603390Rahul KalegaonkarMS ORANGE KRISALA REALTY LLP03/06/2026
CC12603321Nikhilesh 5 GiripunjeMS ORANGE KRISALA REALTY LLP01/06/2026
CC12603322Pravin ChavhanMS ORANGE KRISALA REALTY LLP01/06/2026
CC12603323Poonam IthapeMS ORANGE KRISALA REALTY LLP01/06/2026
CC12603324Avinash chaudhariMS ORANGE KRISALA REALTY LLP01/06/2026
CC12603391Anshuman GuptaMS ORANGE KRISALA REALTY LLP03/06/2026
CC12603326Rutuja KaleMS ORANGE KRISALA REALTY LLP01/06/2026
CC12603327Harshal ThakareMS ORANGE KRISALA REALTY LLP01/06/2026
CC12603328Sumeet PorkuteMS ORANGE KRISALA REALTY LLP01/06/2026
CC12603329Rahul BorkarMS ORANGE KRISALA REALTY LLP01/06/2026
CC12603330Hitesh KulkarniMS ORANGE KRISALA REALTY LLP01/06/2026
CC12603331Avinash DheerMS ORANGE KRISALA REALTY LLP01/06/2026
CC12603332Ajit SinghMS ORANGE KRISALA REALTY LLP01/06/2026
CC12603333Ajinkya RamtekeMS ORANGE KRISALA REALTY LLP01/06/2026
CC12603397Satish DhageMS ORANGE KRISALA REALTY LLP03/06/2026
CC12603400Dhananjay PatilMS ORANGE KRISALA REALTY LLP03/06/2026
CC12603335Jaipratap MishraMS ORANGE KRISALA REALTY LLP01/06/2026
CC12603336Dhananjay ThawariMS ORANGE KRISALA REALTY LLP01/06/2026
CC12603325Jyoti PatoleMS ORANGE KRISALA REALTY LLP01/06/2026
CC12603304Sonal MulikMS ORANGE KRISALA REALTY LLP01/06/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 20 Jun 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 23 May 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 23 May 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 7 May 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 May 2027

Documents filed252

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 252 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 Cosmo EF_Final.pdf20 Jul 2026
Withdrawal Update Form 2File: Form 02 Cosmo EF Jun26 Final.pdf20 Jul 2026
Withdrawal Update Form 3File: Form 3 EF Final_.pdf20 Jul 2026
Withdrawal Update Form 1File: Form 1 - 41 Cosmo EF.pdf12 May 2026
Withdrawal Update Form 2File: Form 2 - 41 Cosmo EF.pdf12 May 2026
Withdrawal Update Form 3File: Form 3 - 41 Cosmo E and F.pdf12 May 2026
Withdrawal Update Form 1File: Form 1 - 41 COSMO E F.pdf30 Jan 2026
Withdrawal Update Form 2File: Form 2 -41 Cosmo E F.pdf30 Jan 2026
Withdrawal Update Form 3File: Form 3 - 41 Cosmo E F.pdf30 Jan 2026
Form 2A (FY 2022-2023)File: 31-03-2023.pdf20 Nov 2025
Form 2A (FY 2023-2024)File: 31-03-2024.pdf20 Nov 2025
Form 5 (FY 2022-2023)File: Form 5 11-04-2024.pdf20 Nov 2025
Form 5 (FY 2023-2024)File: Form 5.pdf20 Nov 2025
Form 1File: june 22 Form 1.pdf19 Nov 2025
Form 2File: form 2.pdf19 Nov 2025
Form 3File: form 3.pdf19 Nov 2025
Disclosure of Sold and Booked InventoryFile: sold unsold.pdf19 Nov 2025
Form 1File: sep 22 Form 1.pdf19 Nov 2025
Form 2File: form 2.pdf19 Nov 2025
Form 3File: form 3.pdf19 Nov 2025
Disclosure of Sold and Booked InventoryFile: sold unsold.pdf19 Nov 2025
Form 1File: 3 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf19 Nov 2025
Form 2File: form 2.pdf19 Nov 2025
Form 3File: form 3.pdf19 Nov 2025
Disclosure of Sold and Booked InventoryFile: sold unsold.pdf19 Nov 2025
Form 1File: form 1.pdf19 Nov 2025
Form 2File: form 2.pdf19 Nov 2025
Form 3File: form 3.pdf19 Nov 2025
Disclosure of Sold and Booked InventoryFile: sold unsold.pdf19 Nov 2025
Form 1File: form 1.pdf19 Nov 2025
Form 2File: form 2.pdf19 Nov 2025
Form 3File: form 3.pdf19 Nov 2025
Disclosure of Sold and Booked InventoryFile: sold unsold.pdf19 Nov 2025
Form 1File: form 1.pdf19 Nov 2025
Form 2File: form 2.pdf19 Nov 2025
Form 3File: form 3.pdf19 Nov 2025
Disclosure of Sold and Booked InventoryFile: sold unsold.pdf19 Nov 2025
Form 1File: form 1.pdf19 Nov 2025
Form 2File: form 2.pdf19 Nov 2025
Form 3File: form 3.pdf19 Nov 2025
Disclosure of Sold and Booked InventoryFile: sold unsold.pdf19 Nov 2025
Form 1File: form 1.pdf19 Nov 2025
Form 2File: form 2.pdf19 Nov 2025
Form 3File: form 3.pdf19 Nov 2025
Disclosure of Sold and Booked InventoryFile: sold unsold.pdf19 Nov 2025
Form 1File: form 1.pdf19 Nov 2025
Form 2File: form 2.pdf19 Nov 2025
Form 3File: form 3.pdf19 Nov 2025
Disclosure of Sold and Booked InventoryFile: sold unsold.pdf19 Nov 2025
Form 1File: form 1.pdf19 Nov 2025
Form 2File: form 2.pdf19 Nov 2025
Form 3File: sep 24.pdf19 Nov 2025
Disclosure of Sold and Booked InventoryFile: sold unsold.pdf19 Nov 2025
Form 1File: form 1.pdf19 Nov 2025
Form 2File: form 2.pdf19 Nov 2025
Form 3File: form 3.pdf19 Nov 2025
Disclosure of Sold and Booked InventoryFile: sold unsold.pdf19 Nov 2025
Form 1File: form 1.pdf19 Nov 2025
Form 2File: form 2.pdf19 Nov 2025
Form 3File: form 3.pdf19 Nov 2025
Disclosure of Sold and Booked InventoryFile: sold unsold.pdf19 Nov 2025
Form 2A (FY 2024-2025)File: FORM 2A.pdf31 Oct 2025
Withdrawal Update Form 1File: FORM 1 41 COSMO EF 30092025.pdf17 Oct 2025
Withdrawal Update Form 2File: FORM 2 COSMO EF 30092025.pdf17 Oct 2025
Withdrawal Update Form 3File: FORM 3 COSMO EF 30092025.pdf17 Oct 2025
Form 5 (FY 2024-2025)File: form 5 COSMO EF 24~25.pdf6 Oct 2025
Form 1File: form 1 Cosmo E & F.pdf23 Jul 2025
Form 2File: cosmo ef form 2.pdf23 Jul 2025
Form 3File: cosmo ef form 3.pdf23 Jul 2025
Disclosure of Sold and Booked InventoryFile: cosmo ef inventory.pdf23 Jul 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 cosmo ef.pdf18 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 Cosmo EF Mar 25.pdf17 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 EF Mar 25.pdf17 Apr 2025
Disclosure of sold/ booked inventoryFile: inventory 41 cosmo ef.pdf17 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 cosmo e and f31-12-2024.pdf29 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 Final_compressed.pdf21 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Dec 24.pdf21 Jan 2025
Disclosure of sold/ booked inventoryFile: inventory cosmo e and f.pdf21 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 COSMO BD 30092024 SIGNED 2.pdf23 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 COSMO EF 30092024 2.pdf23 Oct 2024

How this compares with Pune

98%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 18 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep 41 Cosmo on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Back of Sharayu Toyota13,700+ in Pune

2 km41 CosmoCompleted 102Lapsed / revoked 33Other 112Dot size: filed unitsN

Filed coordinates, straight-line distance. 247 registered projects within 2 km.

Builder: MS ORANGE KRISALA REALTY LLP

MS ORANGE KRISALA REALTY LLP has 2 registrations on MahaRERA, including 41 Cosmo and 41Cosmo. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if 41 Cosmo is delayed beyond 30 May 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of 41 Cosmo?

The registered promoter entity is MS ORANGE KRISALA REALTY LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in 41 Cosmo?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against 41 Cosmo?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for 41 Cosmo?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at 41 Cosmo?

The professionals named in the filing: Architect: CUBIX ARCHITECTS ASSOCIATES; Engineer: PANKAJ VISHNU KOLATE; Engineer: Vishal Amane; Engineer: Sandeep Patil; Chartered Accountant: Patel & Sharma; Chartered Accountant: A S A K & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in 41 Cosmo?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About 41 Cosmo. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save 41 Cosmo to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.