41 CITY HUB

By M/s WONDER SKYLINE LLP

RG-MH-22381 · RERA P52100030903 · Last updated on MahaRERA portal: 24 Jul 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 9 cases
  • 1 complaint at MahaRERA
  • Completion date moved by 28 months
  • 2 extensions taken

Clear

  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Mar 2027Possession promisedmoved 28 months from the original
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
41 of 285Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 107 documents Report an error

41 CITY HUB is a Commercial project by M/s WONDER SKYLINE LLP in Pune, Maharashtra, registered with MahaRERA as P52100030903 on 29 Sep 2021. Possession is promised by 31 Mar 2027. The completion date has moved by 28 months from the original filing. 244 of the 285 units on this registration are recorded sold or booked, and 10 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • Name41 CITY HUB
  • TypeCommercial
  • Location
    • PUNE- SOLAPUR HIGHWAY
    • HADAPSAR
    • Haveli
    • Pune
    • 411028
  • Pincode411028
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100030903
  • ReraGenie IDRG-MH-22381

Builder

  • NameM/s WONDER SKYLINE LLP
  • Entity typePartnership
  • PartnersVISHAL OMPRAKASH AGARWAL, SAGAR OMPRAKASH AGARWAL, MANOJ VIJAYKUMAR AGARWAL, ANUJ RAJESH AGARWAL, ANSH MUKESH AGARWAL

Key dates

this monthRegisteredSep 2021First promiseNov 2024Revised toMar 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on29 Sep 2021
  • Promised completion31 Mar 2027
  • Revised completionRevised to 31 Mar 2027 (originally 30 Nov 2024)
  • Buildings1 building record
  • Documents filed107 files

Current status

86%244 of 285 units booked
93.1%Work done, per cost certificate

Figures as on 24 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
41 CITY HUB K BUILDINGNA16100285285

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 24 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

41 CITY HUB K BUILDING: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 24 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyNoNot applicable
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed10

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots10
Open Space10

Land and ownership30

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,524 sq m
Land owned byThe promoter, with other names on the file
Named landowners30
LandownerVillageDistrict
M/S KUMAR BEHERAY RATHIPune (M Corp.)Pune
YASHWANT MORESHWAR PARANJAPEPune (M Corp.)Pune
SUMATIBAI MROESHWAR PARANAJAPEPune (M Corp.)Pune
MADHAV NARAYAN PARANJAPEPune (M Corp.)Pune
MOHINI MADHAV PARANJAPEPune (M Corp.)Pune
ANAPLA RAJIV PARANJAPEPune (M Corp.)Pune
KUNAL RAJIV PARANJAPEPune (M Corp.)Pune
RAJIV MADHAV PARANJAPEPune (M Corp.)Pune
RADHA ALIAS MEDHA RAJU RAJEPune (M Corp.)Pune
PRABHA YAHSWANT PARANJAPEPune (M Corp.)Pune
SHUBHADA SANJIV PARANAJAPEPune (M Corp.)Pune
AJAY YASHWANT PARANJAPEPune (M Corp.)Pune
DHANANJAY YASHWANT PARANJAPEPune (M Corp.)Pune
SHILA VISHWANATH GOKHALEPune (M Corp.)Pune
SANJIV YASHWANT PARANJAPEPune (M Corp.)Pune
KUMAR BEHERAY RATHIPune (M Corp.)Pune
PARANJAPE YASHWANT MORESHWARPune (M Corp.)Pune
PARANAJAPE SUMATIBAI MROESHWARPune (M Corp.)Pune
PARANJAPE MADHAV NARAYANPune (M Corp.)Pune
PARANJAPE MOHINI MADHAVPune (M Corp.)Pune
PARANJAPE ANAPLA RAJIVPune (M Corp.)Pune
PARANJAPE KUNAL RAJIVPune (M Corp.)Pune
PARANJAPE RAJIV MADHAVPune (M Corp.)Pune
RAJE MEDHA (RADHA) RAJUPune (M Corp.)Pune
PARANJAPE PRABHA YAHSWANTPune (M Corp.)Pune
PARANAJAPE SHUBHADA SANJIVPune (M Corp.)Pune
PARANJAPE AJAY YASHWANTPune (M Corp.)Pune
PARANJAPE DHANANJAY YASHWANTPune (M Corp.)Pune
GOKHALE SHILA VISHWANATHPune (M Corp.)Pune
PARANJAPE SANJIV YASHWANTPune (M Corp.)Pune

Approvals and building plan

Sanctioning authorityPimpri Chinchwad Municipal Corporation
Permissible FSI12280.0
Proposed, not sanctioned5,024 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSWARGATE PUNE
Estimated costRs 53.93 cr
Cost incurredRs 50.22 cr
Work done93.12%
BuildingWingEstimatedIncurred
41 CITY HUB K BUILDINGNARs 43.14 crRs 42.69 cr
-NARs 10.79 crRs 7.53 cr

Certifying professionals and partners8

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectCUBIX ARCHITECTS ASSOCIATES
EngineerMAYUR ANAND AKHADE
Chartered AccountantV A DUDHEDIA & CO
Chartered AccountantROHIT JADHAV & ASSOCIATES
Chartered AccountantA S A K & Co Chartered Accountants
Chartered AccountantAgarwal Sarawgi and Associates
Chartered AccountantPatel and Sharma
Chartered AccountantDipali Shelar and Company
PartnerRole in project
M/s WONDER SKYLINE LLP-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100019533Nov 2024 → Nov 2025

Reason as filed by the promoterThe project is facing delays due to a severe labour shortage, resulting in the unavailability of skilled workers. Additionally, the contractor’s performance has been adversely affected, leading in inefficiencies and compromised work quality. Given these challenges, requesting an extension becomes imperative to ensure the project’s successful completion while maintaining the desired standards and mitigating the impact of unforeseen workforce constraints.

EA15042620638Nov 2024 → Mar 2027

Reason as filed by the promoterhe project has encountered unforeseen challenges that have significantly impacted its timeline and progress. These challenges include- Severe Labor Shortage,Impact on Contractor's Performance,Ensuring Quality and Compliance.

Litigation declared9

CaseCourtStatus
2617/2007 /2007Criminal CourtOngoing
131/2014/2014The Honorable State Consumer Disputes Redressal Commission at PuneOngoing
71/2015/2015Civil CourtClosed
724/2019/2019High Court BombayOngoing
380/2018/2018High Court BombayClosed
206/2020/2020Civil CourtOngoing
207/2020/2020Civil CourtOngoing
782/2017/2017Civil CourtClosed
131/2014/2014The Honorable State Consumer Disputes Redressal Commission at PuneOngoing

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC12401114CHETAN NANDKISHOR NOGAJAM/s WONDER SKYLINE LLP13/12/2024

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 3 Dec 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 24 Feb 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 24 Feb 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 2 Feb 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Mar 2027

Documents filed107

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 107 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1_Architect Certificate_QPR1-26-27_WSLLP.pdf24 Jul 2026
Withdrawal Update Form 2File: Form 2_Enggineer Certificate_QPR1-26-27_WSLLP.pdf24 Jul 2026
Withdrawal Update Form 3File: Form 3_C A Certificate_QPR1-26-27_WSLLP.pdf24 Jul 2026
Withdrawal Update Form 1File: Form 1_Architect Certificate_QPR4_WSLLP.pdf1 May 2026
Withdrawal Update Form 2File: Form 2_Engg Certificate_QPR4_WSLLP.pdf1 May 2026
Withdrawal Update Form 3File: Form 3_C A Certificate_QPR4_WSLLP compressed.pdf1 May 2026
Withdrawal Update Form 1File: Form 1 Architect Certificate.pdf25 Mar 2026
Withdrawal Update Form 2File: Form 2 Engg Certificate.pdf25 Mar 2026
Withdrawal Update Form 3File: Form 3 CA Certificate Signed.pdf25 Mar 2026
Form 2A (FY 2024-2025)File: Form 2 A_WSLLP.pdf30 Dec 2025
Withdrawal Update Form 1File: Form 1_Architect Certificate_Sep25_WSLLP.pdf5 Dec 2025
Withdrawal Update Form 2File: Form 2.pdf5 Dec 2025
Withdrawal Update Form 3File: org-Form 3_11zon.pdf5 Dec 2025
Form 5 (FY 2024-2025)File: Sign-Form 5_Wonder Skyline LLP.pdf29 Sep 2025
Withdrawal Update Form 1File: Form 1_Architect certificate_WSLLP.pdf23 Sep 2025
Withdrawal Update Form 1File: Form 1_Architect certificate_WSLLP.pdf23 Sep 2025
Withdrawal Update Form 2File: Form 2_Engg Certificate_WSLLP.pdf23 Sep 2025
Withdrawal Update Form 2File: Form 2_Engg Certificate_WSLLP.pdf23 Sep 2025
Withdrawal Update Form 3File: Form 3_CA Certificate_WSLLP_11zon.pdf23 Sep 2025
Withdrawal Update Form 3File: Form 3_CA Certificate_WSLLP_11zon.pdf23 Sep 2025
Form 1File: Form1_Architect Certificate_Wsllp.pdf16 Jun 2025
Form 2File: Form2_Engg certificate_Wsllp.pdf16 Jun 2025
Form 3File: Form3_CA Certificate_Wsllp.pdf16 Jun 2025
Disclosure of Sold and Booked InventoryFile: Sold unsold inventory_wsllp.pdf16 Jun 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_C A Certificate sign_WSLLP.pdf13 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1_Architect certificate _Wsllp.pdf5 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Engineer Certificate_WSLLP.pdf31 Jan 2025
Disclosure of sold/ booked inventoryFile: Sold-Unsold Inventary_WSLLP.pdf31 Jan 2025
Copy of the legal title reportFile: Title Certificate_WSLLP.pdf3 Dec 2024
Details of encumbrancesFile: Declaration Concerned to Finance_WSLLP.pdf3 Dec 2024
Declaration in FORM BFile: Form B_compressed.pdf3 Dec 2024
CERSAI detailsFile: Asset Based CERSAI report.pdf3 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5_Annual Report_WSLLP- Final.pdf13 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Architect Certificate_Wonder Skyline.pdf12 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_C A Certificate_WSLLP.pdf12 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Architect Certificate_WSLLP.pdf12 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 -Wonder.pdf12 Aug 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventary_WSLLP.pdf12 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_compressed.pdf12 Aug 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A 31323.pdf15 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A 31324.pdf15 Jun 2024
Declaration in FORM BFile: Form B_Wonder Skyline.pdf14 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1- Architect Certificate_WSLLP.pdf13 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-Engineer Certificate.pdf13 May 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventary_Mar24_WSLLP.pdf13 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - C A certificate uploaded.pdf13 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Architect Certificate_Wonder Skyline.pdf4 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Engineer certificate -41 city hub.pdf4 Apr 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventary_Dec23_WSLLP_compressed.pdf4 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_CA Certificate_WSLLP.pdf4 Apr 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5_30-09-2023_Wonder LATEST.pdf1 Apr 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5_Annual report of Statement of Accounts_WonderSkyline.pdf29 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Architect Certificate.pdf7 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Engineer Certificate.pdf7 Mar 2024
Disclosure of sold/ booked inventoryFile: Declaration of Sold Unsold Inventary.pdf7 Mar 2024
Disclosure of sold/ booked inventoryFile: Sold Unsol Inventary.pdf7 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_CA Certifiacte.pdf7 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-C A Certificate-WSLLP_11zon.pdf31 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-Architect Certificate.pdf12 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-Engineer Certificate.pdf12 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_C A Certificate.pdf2 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-Architect Certificate.pdf20 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Engineer Certificate.pdf20 Apr 2023
Disclosure of sold/ booked inventoryFile: Declaration for sold unsold 03-04-2023.pdf20 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5-Annual Audit Report.pdf15 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5-Annual Audit Report.pdf15 Mar 2023
Proforma of Agreement for saleFile: RERA Draft Agreement dated.pdf13 Jan 2023
Disclosure of sold/ booked inventoryFile: Declaration of Sold and Unsold Inventary.pdf12 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate.pdf11 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate.pdf11 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Engineer Certificate_WSLLP.pdf5 Dec 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Architect Certificate.pdf18 Oct 2022
Disclosure of sold/ booked inventoryFile: Sold and Unsold Inventary 05-10-2022.pdf18 Oct 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Architect Certificate_June 2022.pdf14 Jul 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Engineer Certificate_June 2022.pdf14 Jul 2022
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventary 05-07-2022_June 2022_compressed.pdf14 Jul 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_ C A Certificate_March 2022_compressed.pdf14 Jul 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_C A Certificate_June 2022.pdf14 Jul 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate_01-04-2022.pdf2 Jun 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate 31-03-2022.pdf18 Apr 2022

How this compares with Pune

86%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 28 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep 41 CITY HUB on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near HADAPSAR13,700+ in Pune

2 km41 CITY HUBCompleted 36Lapsed / revoked 14Other 37Dot size: filed unitsN

Filed coordinates, straight-line distance. 87 registered projects within 2 km.

Builder: M/s WONDER SKYLINE LLP

M/s WONDER SKYLINE LLP has 1 registration on MahaRERA, including 41 CITY HUB. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if 41 CITY HUB is delayed beyond 31 Mar 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of 41 CITY HUB?

The registered promoter entity is M/s WONDER SKYLINE LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in 41 CITY HUB?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against 41 CITY HUB?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for 41 CITY HUB?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at 41 CITY HUB?

The professionals named in the filing: Architect: CUBIX ARCHITECTS ASSOCIATES; Engineer: MAYUR ANAND AKHADE; Chartered Accountant: V A DUDHEDIA & CO; Chartered Accountant: ROHIT JADHAV & ASSOCIATES; Chartered Accountant: A S A K & Co Chartered Accountants; Chartered Accountant: Agarwal Sarawgi and Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in 41 CITY HUB?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About 41 CITY HUB. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save 41 CITY HUB to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.