34 Western Pavillion
By BLUE PEARL PROMOTERS AND DEVELOPERS
RG-MH-16915 · RERA P52100027431 · Last updated on MahaRERA portal: 27 May 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Possession 1 months past the filed date
- Completion date moved by 29 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- All 5 earlier projects delivered on promise
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
34 Western Pavillion is a Residential / Group Housing project by BLUE PEARL PROMOTERS AND DEVELOPERS in Pune, Maharashtra, registered with MahaRERA as P52100027431 on 10 Dec 2020. Possession was promised by 11 Sep 2026 and is now 1 months past that date. The completion date has moved by 29 months from the original filing. 39 of the 53 units on this registration are recorded sold or booked, and 8 of 11 construction stages are filed complete.
At a glance
Project
- Name34 Western Pavillion
- TypeResidential / Group Housing
- Location
- Pancard Club Road
- Baner
- Haveli
- Pune
- 411045
- Pincode411045
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100027431
- ReraGenie IDRG-MH-16915
Builder
- NameBLUE PEARL PROMOTERS AND DEVELOPERS
- Entity typePartnership
- GSTIN27AAWFB0704G1ZI
- PartnersUma Dnyanesh Shelke, Sangram Bhimraj Patare, Rekha Annasaheb Ambre
- Declared earlier projects5 →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on10 Dec 2020
- Promised completion11 Sep 2026
- Revised completionRevised to 11 Sep 2026 (originally 15 Apr 2024)
- Buildings1 building record
- Documents filed107 files
Current status
Figures as on 27 May 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Wing A | NA | 8 | 0 | 22 | 31 | 53 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 27 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
8 of 11 construction stages are filed complete. The stage furthest along is Sanitary Fittings within the flats / premises, at 98%.
Wing A: 82% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 98% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 27 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 50% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 0% |
Parking filed1
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership3
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| Sangram Bhimraj Patare | Aurangabad (M Corp.) | Aurangabad |
| Rekha Annasaheb Ambre | Sangavi | Pune |
| Uma Dynanesh Shelke | Pune (M Corp.) | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Wing A | NA | Rs 47.00 cr | Rs 19.53 cr |
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | TF CUBE |
| Engineer | Prathasarthi Shinde Shinde |
| Chartered Accountant | AGRAWAL DHANNAWAT PODDAR & CO CHARTERED ACCOUNTANTS |
| Chartered Accountant | Agrawal Dhannawat Poddar & Co |
| Chartered Accountant | Chandorkar & Limaye |
| Chartered Accountant | M/s. Laleet Patil & Associates |
| Partner | Role in project |
|---|---|
| BLUE PEARL PROMOTERS AND DEVELOPERS | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterAs per Authority Order new Commencement Certificate is from 12/09/2023 , so we want to extent rera completion date 11/09/2026
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 28 Nov 2020 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 16 Aug 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 16 Aug 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 6 Feb 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed107
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 107 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: 34 Western Pavillion Architect Certificate Form 1_.pdf | 27 May 2026 |
| Withdrawal Update Form 2File: Form 2 Q4 34 Western pavillion.pdf | 27 May 2026 |
| Withdrawal Update Form 3File: Signed Form 3 34wetsern pavillion.pdf | 27 May 2026 |
| Form 1File: 34 Western Pavillion Architect Certificate Form 1_.pdf | 29 Apr 2026 |
| Form 2File: Form 2 Q4 34 Western pavillion.pdf | 29 Apr 2026 |
| Form 3File: Signed Form 3 34wetsern pavillion.pdf | 29 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: Q4 Sold Unsold Inventory signed.pdf | 29 Apr 2026 |
| Form 1File: Form 1.pdf | 30 Jan 2026 |
| Form 2File: Form 2.pdf | 30 Jan 2026 |
| Form 3File: Form 3.pdf | 30 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold and Unsold Inventory.pdf | 30 Jan 2026 |
| Form 5 (FY 2024-2025)File: Blue Pearl Form5 FY2425.PDF | 18 Nov 2025 |
| Form 1File: Form 1 Architect Certificate.pdf | 14 Nov 2025 |
| Form 2File: Form 2 Engineer Certificate.pdf | 14 Nov 2025 |
| Form 3File: Form 3 CA Certificate compress.pdf | 14 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Detailsc_Rotated details.pdf | 14 Nov 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate.pdf | 21 Jul 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: BLUE PEARL FORM 3-30062025.PDF | 21 Jul 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate-0001.pdf | 21 Jul 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory.pdf | 21 Jul 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Quality Assurance Certificate.pdf | 21 Jul 2025 |
| Form 1File: Form 1 Architect Certificate.pdf | 21 Jul 2025 |
| Form 2File: Form 2 Engineer Certificate-0001.pdf | 21 Jul 2025 |
| Form 3File: BLUE PEARL FORM 3-30062025.PDF | 21 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory.pdf | 21 Jul 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 31_03_2025.pdf | 19 Jun 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 31_3_2025.pdf | 13 May 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 (31_03_2025).pdf | 9 May 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Blue pearl Q2.pdf | 5 May 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Blue pearl Q3.pdf | 5 May 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Blue pearl Q4.pdf | 5 May 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form -5 Blue peral FY-23-24.PDF | 1 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 30_06_2024.pdf | 21 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 30_09_2024.pdf | 21 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 31_12_2024.pdf | 21 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 (30_06_2024).pdf | 21 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 (30_09_2024).pdf | 21 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 (31_12_2024).pdf | 21 Apr 2025 |
| Layout approvalFile: Plots_Layout_Sanction_Plan_Dated_12_09_2023.pdf | 16 Aug 2024 |
| Layout approvalFile: Plots_Layout_Sanction_Plan_Dated_12_09_2023.pdf | 16 Aug 2024 |
| Building plan approvalFile: Sanction Plan_Dated_12_09_2023_Plan No 1.pdf | 16 Aug 2024 |
| Building plan approvalFile: Sanction Plan_Dated_12_09_2023_Plan No 2.pdf | 16 Aug 2024 |
| Building plan approvalFile: Sanction Plan_Dated_12_09_2023_Plan No 3.pdf | 16 Aug 2024 |
| Building plan approvalFile: Sanction Plan_Dated_12_09_2023_Plan No 4.pdf | 16 Aug 2024 |
| Building plan approvalFile: Sanction Plan_Dated_12_09_2023_Plan No 5.pdf | 16 Aug 2024 |
| Copy of Layout Approval (in case of layout)File: Plots_Layout_Sanction_Plan_Dated_12_09_2023.pdf | 16 Aug 2024 |
| Copy of Layout Approval (in case of layout)File: Plots_Layout_Sanction_Plan_Dated_12_09_2023.pdf | 16 Aug 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Sanction Plan_Dated_12_09_2023_Plan No 1.pdf | 16 Aug 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Sanction Plan_Dated_12_09_2023_Plan No 2.pdf | 16 Aug 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Sanction Plan_Dated_12_09_2023_Plan No 3.pdf | 16 Aug 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Sanction Plan_Dated_12_09_2023_Plan No 4.pdf | 16 Aug 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Sanction Plan_Dated_12_09_2023_Plan No 5.pdf | 16 Aug 2024 |
| Details of encumbrancesFile: Non Encumbrances.pdf | 27 May 2024 |
| Details of encumbrances concerned to FinanceFile: Non Encumbrances.pdf | 27 May 2024 |
| Details of encumbrances concerned to LegalFile: Non Encumbrances.pdf | 27 May 2024 |
| Declaration in FORM BFile: Rera Affidavit Cum Declaration Final.pdf | 27 May 2024 |
| CERSAI detailsFile: Non Encumbrances.pdf | 27 May 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A (Rekha Ambre).pdf | 27 May 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A (Sangram Patare).pdf | 27 May 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A (Uma Shelke).pdf | 27 May 2024 |
| Proforma of Agreement for saleFile: SR_NO_34 SAMPLE AGREEMENT TO SALE DRAFT.pdf | 27 May 2024 |
| Deviation Report with respect to Allotment letterFile: Deviations_ Modifications in the proforma of the Allotment Letter.pdf | 27 May 2024 |
| Deviation Report with respect to model copy of AgreementFile: Deviations _Modifications in the proforma of the Agreement.pdf | 27 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-18052024.pdf | 21 May 2024 |
| Declaration about Commencement CertificateFile: Form D - Declaration of Promoter 1.pdf | 25 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Engineer Certificate.pdf | 25 Apr 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5.pdf | 25 Apr 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf | 6 Feb 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A December 2023.pdf | 6 Feb 2024 |
| Declaration about Commencement CertificateFile: Commencement Certificate.pdf | 31 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Updated.pdf | 31 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Updated_compressed.pdf | 31 Jan 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 Sign by Promoter.pdf | 31 Jan 2024 |
| Declaration in FORM BFile: Form B Affifavid.pdf | 24 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Sign by Promoter.pdf | 24 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Sign by Promoter.pdf | 24 Jan 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Promotors And Developers.pdf | 19 Jan 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 Signed And Stamped.pdf | 19 Jan 2024 |
| Layout approvalFile: 34 Amended Amalgametd Sanction Plan.pdf | 10 Jan 2024 |
| Copy of Layout Approval (in case of layout)File: 34 Amended Amalgametd Sanction Plan.pdf | 10 Jan 2024 |
Promoter's earlier projects5
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| Green Castle 3 | Susgaon | 8 | Completed | Nov 2019 | Aug 2019 |
| Blue Pearl Associates D Wing | Susgaon | 8 | Completed | Mar 2019 | Feb 2019 |
| 133 Orange Tree | Susgaon | 51 | Completed | Nov 2017 | Oct 2017 |
| Green Castle 1 | Susgaon | 8 | Completed | Feb 2016 | Dec 2015 |
| Green Castle 2 | Susgaon | 8 | Completed | Nov 2015 | Oct 2015 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 107 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep 34 Western Pavillion on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Baner13,700+ in Pune
Filed coordinates, straight-line distance. 341 registered projects within 2 km.
EARTH 1 BY VTP LUXE PHASE 1
MAHALUNGE REAL ESTATE DEVELOPERS PVT. LTD.
Godrej Meadows
Mahalunge Township Developers Private Limi
Godrej Green Vistas
Mahalunge Township Developers Private Limi
Godrej Hill Retreat
Mahalunge Township Developers Private Limi
Godrej Green Cove
Mahalunge Township Developers Private Limi
NYATI EMERALD I
NYATI BUILDERS PRIVATE LIMITED
Builder: BLUE PEARL PROMOTERS AND DEVELOPERS
BLUE PEARL PROMOTERS AND DEVELOPERS has 1 registration on MahaRERA, including 34 Western Pavillion. Its filings disclose 5 earlier MahaRERA projects: declares 5 of 5 past projects completed on time. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if 34 Western Pavillion is delayed beyond 11 Sep 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of 34 Western Pavillion?
The registered promoter entity is BLUE PEARL PROMOTERS AND DEVELOPERS, a partnership as per the filing. Its GSTIN 27AAWFB0704G1ZI can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in 34 Western Pavillion?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for 34 Western Pavillion?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at 34 Western Pavillion?
The professionals named in the filing: Architect: TF CUBE; Engineer: Prathasarthi Shinde Shinde; Chartered Accountant: AGRAWAL DHANNAWAT PODDAR & CO CHARTERED ACCOUNTANTS; Chartered Accountant: Agrawal Dhannawat Poddar & Co; Chartered Accountant: Chandorkar & Limaye; Chartered Accountant: M/s. Laleet Patil & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in 34 Western Pavillion?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback