Home / Browse projects / Pune, Maharashtra / 32 Pinewood Drive -Phase2

Registration lapsed No litigation declared Others project

32 Pinewood Drive -Phase2

By S S Properties

RG-MH-23007 · RERA P52100033337 · Last updated on MahaRERA portal: 8 Feb 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 10 months past the filed date
  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2025Possession promised10 months past this date
18 of 33Construction stages doneacross 3 buildings; furthest along: Internal walls, 90%
0Complaints at MahaRERAon this registration
Jump to the 121 documents Report an error

32 Pinewood Drive -Phase2 is a Others project by S S Properties in Pune, Maharashtra, registered with MahaRERA as P52100033337 on 16 Feb 2022. Possession was promised by 30 Dec 2025 and is now 10 months past that date. The completion date has moved by 12 months from the original filing.

At a glance

Project

  • Name32 Pinewood Drive -Phase2
  • TypeOthers
  • Location
    • Bhoirwadi road
    • Hinjewadi Phase 3
    • Bhoirwadi
    • Mulshi
    • Pune
    • 411057
  • Pincode411057
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100033337
  • ReraGenie IDRG-MH-23007

Builder

  • NameS S Properties
  • Entity typePartnership
  • PartnersJay Shailesh Shah, Sagar Rikhablal Bhandari, Ghanshyam Jhangaldas Sukhwani
  • Other registrations3 more →
  • Completed3 of 4
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects2 →

Key dates

10 months past promisethis monthRegisteredFeb 2022First promiseDec 2024Revised toDec 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on16 Feb 2022
  • Promised completion30 Dec 2025
  • Revised completionRevised to 30 Dec 2025 (originally 30 Dec 2024)
  • Buildings3 building records
  • Documents filed121 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
CNA140000
DNA140000
Commercial BuildingNA10000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 8 Feb 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

18 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Internal walls, at 90%.

C91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
D43%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure67%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises11%
Sanitary Fittings within the flats / premises17%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks40%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.35%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Commercial Building67%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks70%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 8 Feb 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes70%
Water SupplyYes90%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes90%
Storm Water DrainsYes80%
Landscaping & Tree PlantingYes90%
Street LightingYes80%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes90%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes90%
Electrical meter room, sub-station, receiving stationYes90%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed193

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots193
Closed/Covered62
Open Space131
BuildingClosed/CoveredOpen SpaceTotal
C3171102
D315384
Commercial Building077

Land and ownership2

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area10,588 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
LandownerVillageDistrict
D Arjun Rao-Hyderabad
D Harini Rao-Hyderabad

Approvals and building plan

Permissible FSI12204.42
Proposed, not sanctioned12,150 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGround floor 11 Moldina RD camp Pune- 411001

Certifying professionals and partners

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

PartnerRole in project
S S Properties-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100025686Dec 2024 → Dec 2025

Reason as filed by the promoterWe are submitting this explanatory note to request an extension for the completion of Wing D under the 32 Pinewood Drive - Phase 2 project. Grounds for Delay 1. Completion of Wing C: o We have successfully completed the construction of Wing C and obtained the Occupancy Certificate (OC). Possession has been handed over to allottees, demonstrating our commitment to timely completion of the project wherever possible. 2. Wing D Work Status: o The construction of Wing D is progressing as per the Critical Path Method (CPM) and the details submitted in Form 1. Despite facing challenges, we are at an

Litigation declared1

CaseCourtStatus
12192/2022High Court of Judicature at BombayPending

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 3 Feb 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 18 Apr 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 18 Apr 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 18 Apr 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 15 Jun 2024

Documents filed121

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 121 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 - 32 PD - Phase II - Q3-2024-2025.pdf8 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 - 32 PD - Phase II - Q3-2024-2025.pdf8 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 - 32 PD - Phase II - Q3-2024-2025.pdf6 Feb 2025
Disclosure of sold/ booked inventoryFile: Circular 29.pdf21 Dec 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: Format A.pdf21 Dec 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: DINS.pdf21 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 - 32 PD - Phase II - Q1-2024-2025.pdf5 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 - 32 PD - Phase II - Q2-2024-2025.pdf5 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 - 32 PD - Phase II - Q2-2024-2025_compressed.pdf5 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 - 32 PD - Phase II - Q1-2024-2025.pdf5 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 - 32 PD - Phase II - Q1-2024-2025.pdf5 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 - 32 PD - Phase II - Q2-2024-2025.pdf5 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 - S S Properties - 32 PD - Phase II - 2023-24.pdf4 Nov 2024
Declaration in FORM BFile: Form B - S S Properties.pdf11 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 - 32 PD - Phase II - Q1-2024-2025.pdf11 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 - 32 PD - Phase II - Q1-2024-2025.pdf11 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 - 32 PD - Phase II - Q1-2024-2025.pdf11 Oct 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold Details-32 Pinewood Drive.pdf24 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: 19-20.pdf18 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 20-21.pdf18 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 21-22.pdf18 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 22-23.pdf18 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 23-24.pdf18 Jun 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Completion C bldg.pdf15 Jun 2024
Building plan approvalFile: 1 (7)_1_11zon.pdf18 Apr 2024
Building plan approvalFile: 2 (7)_3_11zon.pdf18 Apr 2024
Building plan approvalFile: 3 (2)_4_11zon.pdf18 Apr 2024
Building plan approvalFile: 4 (2)_5_11zon.pdf18 Apr 2024
Building plan approvalFile: 5_6_11zon.pdf18 Apr 2024
Building plan approvalFile: 6_1_11zon.pdf18 Apr 2024
Building plan approvalFile: 7_2_11zon.pdf18 Apr 2024
Building plan approvalFile: 8_3_11zon.pdf18 Apr 2024
Building plan approvalFile: 9_4_11zon.pdf18 Apr 2024
Building plan approvalFile: 10_5_11zon.pdf18 Apr 2024
Layout approvalFile: 1compressed.pdf18 Apr 2024
Copy of Layout Approval (in case of layout)File: 1compressed.pdf18 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: 1 (7)_1_11zon.pdf18 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: 2 (7)_3_11zon.pdf18 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: 3 (2)_4_11zon.pdf18 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: 4 (2)_5_11zon.pdf18 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: 5_6_11zon.pdf18 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: 6_1_11zon.pdf18 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: 7_2_11zon.pdf18 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: 8_3_11zon.pdf18 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: 9_4_11zon.pdf18 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: 10_5_11zon.pdf18 Apr 2024
Commencement Certificates / NA Order for plotted developmentFile: cc_1_11zon.pdf18 Apr 2024
Details of encumbrances concerned to FinanceFile: 32 -3.pdf7 Feb 2024
Details of encumbrances concerned to LegalFile: 32 -3.pdf7 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 - 32 PD - Phase II - Q3-2023-2024.pdf5 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 - 32 PD - Phase II - Q3-2023-2024.pdf5 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 - 32 PD - Phase II - Q3-2023-2024.pdf5 Feb 2024
Building plan approvalFile: 02_compressed.pdf22 Nov 2023
Building plan approvalFile: 03_compressed.pdf22 Nov 2023
Building plan approvalFile: 04_compressed.pdf22 Nov 2023
Building plan approvalFile: 05_compressed.pdf22 Nov 2023
Building plan approvalFile: 06_compressed.pdf22 Nov 2023
Building plan approvalFile: 07_compressed.pdf22 Nov 2023
Building plan approvalFile: 08_compressed.pdf22 Nov 2023
Building plan approvalFile: 09_compressed.pdf22 Nov 2023
Building plan approvalFile: 10_compressed.pdf22 Nov 2023
Layout approvalFile: Pi7_01_compressed_compressed_1.pdf22 Nov 2023
Copy of Layout Approval (in case of layout)File: Pi7_01_compressed_compressed_1.pdf22 Nov 2023
Building Plan Approval / NA Order for plotted developmentFile: 02_compressed.pdf22 Nov 2023
Building Plan Approval / NA Order for plotted developmentFile: 03_compressed.pdf22 Nov 2023
Building Plan Approval / NA Order for plotted developmentFile: 04_compressed.pdf22 Nov 2023
Building Plan Approval / NA Order for plotted developmentFile: 05_compressed.pdf22 Nov 2023
Building Plan Approval / NA Order for plotted developmentFile: 06_compressed.pdf22 Nov 2023
Building Plan Approval / NA Order for plotted developmentFile: 07_compressed.pdf22 Nov 2023
Building Plan Approval / NA Order for plotted developmentFile: 08_compressed.pdf22 Nov 2023
Building Plan Approval / NA Order for plotted developmentFile: 09_compressed.pdf22 Nov 2023
Building Plan Approval / NA Order for plotted developmentFile: 10_compressed.pdf22 Nov 2023
Commencement Certificates / NA Order for plotted developmentFile: CC_6088_2023_compressed.pdf22 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 - 32 PD - Phase II - Q2-2023-2024.pdf4 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 - 32 PD - Phase II - Q2-2023-2024.pdf4 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 - 32 PD - Phase II - Q2-2023-2024.pdf4 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 - 32 PD - Phase II - Q1-2023-2024.pdf19 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 - 32 PD - Phase II - Q1-2023-2024.pdf19 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 - 32 PD - Phase II - Q1-2023-2024_compressed.pdf19 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 - S S Properties - 32PD-Phase II - FY-2022-23.pdf5 Oct 2023

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
32 Pinewood DriveS No 31 and 32 at bhoirwadi Tal Mulshi Dist Pune336CompletedDec 2020Dec 2020
43 Privet Drive PH-IBalewadi Pune204CompletedOct 2015Late, Dec 2015

How this compares with Pune

26%of Pune projects moved their completion datethis one moved by 12 months
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep 32 Pinewood Drive -Phase2 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Hinjewadi Phase 313,700+ in Pune

2 km32 Pinewood Drive -PhaseCompleted 33Lapsed / revoked 9Other 17Dot size: filed unitsN

Filed coordinates, straight-line distance. 59 registered projects within 2 km.

Builder: S S Properties

S.S. PROPERTIES has 4 registrations on MahaRERA, including ESTONIA and 32 Pinewood Drive -Phase 1. Its filings disclose 2 earlier MahaRERA projects: declares 1 of 2 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that 32 Pinewood Drive -Phase2 shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if 32 Pinewood Drive -Phase2 is delayed beyond 30 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of 32 Pinewood Drive -Phase2?

The registered promoter entity is S S Properties, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in 32 Pinewood Drive -Phase2?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for 32 Pinewood Drive -Phase2?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

What should I check before booking in 32 Pinewood Drive -Phase2?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About 32 Pinewood Drive -Phase2. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save 32 Pinewood Drive -Phase2 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.