Home / Browse projects / 30 DRIVE
30 DRIVE
By Duville Estates Private Limited
RG-MH-22757 · RERA P52100032106 · Last updated on MahaRERA portal: 3 Apr 2025
Source: official MahaRERA filing
Red flags
- Litigation declared, 5 cases
- Completion date moved by 6 months
- 1 extension taken
Clear
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: .Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
30 DRIVE is a Others project by Duville Estates Private Limited in PUNE, 411001, registered with MahaRERA as P52100032106 on 14 Dec 2021. The registration is recorded completed; possession was promised by 6 May 2024. The completion date has moved by 6 months from the original filing.
At a glance
Project
- Name30 DRIVE
- TypeOthers
- Location
- GHORPADI
- PUNE
- 411001
- Pincode411001
- RERA no.P52100032106
- ReraGenie IDRG-MH-22757
Builder
- NameDuville Estates Private Limited
- Entity typeCompany
- GSTIN27AACCC8436BIZW
- GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
- DirectorTushad Behram Dubash
- Other registrations7 more →
- Completed4 of 8
- No longer live3 lapsed, de-registered or revoked
- Declared earlier projects2 →
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on14 Dec 2021
- Promised completion6 May 2024
- Revised completionRevised to 6 May 2024 (originally 30 Nov 2023)
- Buildings1 building record
- Documents filed90 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| 30 DRIVE | NA | 11 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 3 Apr 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.
30 DRIVE: 91% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 3 Apr 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | Yes | 100% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | No | Not applicable |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed1
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | KIPA ARCHITECTS |
| Engineer | PINNAC AECL CONSULTANCY PVT TD |
| Chartered Accountant | DHIRUBHAI SHAH & CO LLP |
| Chartered Accountant | Kalyaniwalla & Mistry LLP |
| Partner | Role in project |
|---|---|
| Duville Estates Private Limited | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterDuring the covid-19 pandemic period the works in the said Project has got delayed due to inadequate manpower and difficulty in re-mobilisation of resources. As a result of which, we have received the Occupancy Certificates of the after expiry of the validity of the said Project. You are requested to the note that, we have completed the construction of the said Project and possession of units has already been delivered to the Allottees. We have uploaded Form-4 (Completion Certificate) dated 30th September, 2024 on MahaRERA portal, but the same was rejected due to expiry of validity of the said
Litigation declared5
| Case | Court | Status |
|---|---|---|
| 1774/2015/2015 | Court of Civil Judge Senior Division Pune | Closed |
| 226/2015/2015 | Court of Civil Judge Senior Division Pune | Ongoing |
| 597/2015/2015 | Court of civil Judge SEnior Division Pune | Ongoing |
| 48/2016/2016 | Pune Civil Court | Pending |
| 226/2015 | Court of Civil Judge Senior Division Pune | Ongoing |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 8 Dec 2021 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 26 Nov 2021 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 26 Nov 2021 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 26 Nov 2021Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 6 Nov 2024
Documents filed90
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 90 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Declaration in FORM BFile: Latest - Form B - Declaration.pdf | 3 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: 30 Drive Sales Data.pdf | 19 Mar 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 30 Drive Form 3 Dec24.pdf | 21 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 30 Drive Form 2.pdf | 21 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 30 Drive.pdf | 21 Feb 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A 30 Drive.pdf | 21 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 30 Drive Sept2024.pdf | 19 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 30 Drive Sept2024.pdf | 19 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 30 DRIVE June 2024.pdf | 18 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 30 Drive September 2024.pdf | 18 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 30 DRIVE June 2024.pdf | 18 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 30 Drive September 2024.pdf | 18 Nov 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form-2A - 30 Drive - Sep 2024.pdf | 14 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 - 30 drive - Jun 2024.pdf | 12 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: 30 Drive.pdf | 12 Nov 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Plot D - Occupancy Certificate - Part 1.pdf | 6 Nov 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Plot D - Occupancy Certificate - Part 2.pdf | 6 Nov 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 - Plot 30 D - FY 2023-24.pdf | 10 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Plot D Form 2.pdf | 7 Aug 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: PLot D Form 2A.pdf | 7 Aug 2024 |
| Disclosure of sold/ booked inventoryFile: 30 Drive inv.pdf | 7 Aug 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 30 D drive.pdf | 24 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 30 Drive Form 1.pdf | 9 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 30 Drive.pdf | 9 May 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A 30 Drive.pdf | 9 May 2024 |
| Disclosure of sold/ booked inventoryFile: 30 Drive inv.pdf | 2 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 9 Form 2 - 30 Drive - Dec 2023.pdf | 1 Mar 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 - 30 Drive - Dec 2023.pdf | 1 Mar 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Plot D.pdf | 12 Feb 2024 |
| Disclosure of sold/ booked inventoryFile: 30Drive.pdf | 1 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - 30 Drive - Sep 2023.pdf | 2 Nov 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 8 Form 2 - 30 Drive - Sep 2023.pdf | 31 Oct 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form-2A - 30 Drive - Sep 2023.pdf | 31 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: 7 Inventory Details - Sep 2023.pdf | 31 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - 30 Drive - Sep 2023.pdf | 31 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 - Plot 30 D - FY 2022-23.pdf | 30 Sep 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - 30 Drive - Jun 2023.pdf | 8 Aug 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A - 30 Drive - Jun 2023.pdf | 8 Aug 2023 |
| Disclosure of sold/ booked inventoryFile: 6 Inventory Details - Jun 2023.pdf | 27 Jul 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 7 Form 2 - 30 Drive - Jun 2023.pdf | 21 Jul 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 - 30 Drive-D - June 2023.pdf | 21 Jul 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 - 30 Drive-D - June 2023.pdf | 21 Jul 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - 30 Drive - Mar 2023 - Counter Signed.pdf | 21 Apr 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 6 Form 2 - 30 Drive - Mar 2023 - Counter Signed.pdf | 21 Apr 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A - 30 Drive - Mar 2023 - Counter Signed.pdf | 21 Apr 2023 |
| Disclosure of sold/ booked inventoryFile: Inventory Details - 31032023.pdf | 21 Apr 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 - 30 Drive-D - Mar 2023.pdf | 21 Apr 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - 30 Drive - Dec 2022.pdf | 18 Jan 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - 30 Drive - Dec 2022.pdf | 18 Jan 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A - 30 Drive - Dec 2022.pdf | 18 Jan 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - 30 Drive - Dec 2022.pdf | 13 Jan 2023 |
| Disclosure of sold/ booked inventoryFile: Inventory Details - 31122022.pdf | 12 Jan 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A - 30 Drive - Sep 2022.pdf | 12 Dec 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - 30 Drive - Sep 2022.pdf | 16 Nov 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - 30 Drive - Sep 2022.pdf | 16 Nov 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - 30 Drive - Jun 2022.pdf | 4 Nov 2022 |
| Disclosure of sold/ booked inventoryFile: Inventory Details - 30062022.pdf | 4 Nov 2022 |
| Disclosure of sold/ booked inventoryFile: Inventory Details - 30092022.pdf | 4 Nov 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Plot D - 30 D.pdf | 30 Sep 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - 30 Drive - Jun 2022.pdf | 2 Sep 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - 30 Drive - June 2022.pdf | 2 Sep 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A - 30 Drive - Jun 2022.pdf | 2 Sep 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - 30 Drive - Jun 2022.pdf | 2 Sep 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Engineer's Certificate - 30 Drive - 31032022.pdf | 7 Jun 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A - Quality Assurance Certificate - 31032022.pdf | 7 Jun 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - 30 Drive - Optimised.pdf | 7 Jun 2022 |
| Disclosure of sold/ booked inventoryFile: Inventory Details - 31032022.pdf | 8 Apr 2022 |
| CERSAI detailsFile: CERSAI_Search_Report_200225720197.pdf | 11 Dec 2021 |
| CERSAI detailsFile: CERSAI_Search_Report_200225720212.pdf | 11 Dec 2021 |
| CERSAI detailsFile: Loan declaration.pdf | 11 Dec 2021 |
| Copy of the legal title reportFile: Title report_Format A.pdf | 8 Dec 2021 |
| Proforma of Allotment letterFile: Draft Agreement_Plot D.pdf | 1 Dec 2021 |
| Proforma of Allotment letterFile: Allotment_Letter Plot D.pdf | 1 Dec 2021 |
| Layout approvalFile: 01-02- (Layout).pdf | 26 Nov 2021 |
| Layout approvalFile: 01-02 - 2 - (Layout).pdf | 26 Nov 2021 |
| Building plan approvalFile: 02-02-1-Final.pdf | 26 Nov 2021 |
| Building plan approvalFile: 01-02-3 Final.pdf | 26 Nov 2021 |
| Copy of the legal title reportFile: Legal Title Final 1.pdf | 26 Nov 2021 |
| Copy of Layout Approval (in case of layout)File: 01-02- (Layout).pdf | 26 Nov 2021 |
| Copy of Layout Approval (in case of layout)File: 01-02 - 2 - (Layout).pdf | 26 Nov 2021 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 7 other registrations, which the RERA portal never shows together
- All 90 filed documents as one ZIP, foldered, with a manifest
Keep 30 DRIVE on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near PUNE
HUES OF SKY
Bramhacorp Limited
Birla Punya Phase II
Birla Estates Private Limited
Birla Punya Phase 1
Birla Estates Private Limited
BOULEVARD TOWER A2
Bramhacorp Limited
One Place-Bund Garden Road
TOPSPACE LANDMARKS LLP
Eternia Phase 2
VENTURESPRO PROJECTS LLP
Builder: Duville Estates Private Limited
Duville Estates Private Limited has 8 registrations on MahaRERA, including Riverdale Heights and Riverdale Residences-I. Its filings disclose 2 earlier MahaRERA projects: declares 0 of 2 past projects completed on time. Litigation is declared on 4 of its registrations. Read the full track record.
Frequently asked questions
What are my rights if 30 DRIVE is delayed beyond 6 May 2024?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of 30 DRIVE?
The registered promoter entity is Duville Estates Private Limited, a company as per the filing. Its GSTIN 27AACCC8436BIZW can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in 30 DRIVE?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for 30 DRIVE?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at 30 DRIVE?
The professionals named in the filing: Architect: KIPA ARCHITECTS; Engineer: PINNAC AECL CONSULTANCY PVT TD; Chartered Accountant: DHIRUBHAI SHAH & CO LLP; Chartered Accountant: Kalyaniwalla & Mistry LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in 30 DRIVE?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.