Registration lapsed No litigation declared Residential / Group Housing project

24K Sereno Building E

By NOW Realty Promoters and Builders Private Limited

RG-MH-15895 · RERA P52100024374 · Last updated on MahaRERA portal: 1 Feb 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 4 months past the filed date
  • 1 complaint at MahaRERA
  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form

5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jun 2026Possession promised4 months past this date
6 of 11Construction stages donefurthest along: Internal walls, 90%
1Complaints at MahaRERAon this registration
Jump to the 59 documents Report an error

24K Sereno Building E is a Residential / Group Housing project by NOW Realty Promoters and Builders Private Limited in Pune, Maharashtra, registered with MahaRERA as P52100024374 on 7 Feb 2020. Possession was promised by 30 Jun 2026 and is now 4 months past that date. The completion date has moved by 12 months from the original filing. 1 complaint is on record with the regulator.

At a glance

Project

  • Name24K Sereno Building E
  • TypeResidential / Group Housing
  • Location
    • Pan card club road
    • Samarth Colony
    • Baner
    • Haveli
    • Pune
    • 411045
  • Pincode411045
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100024374
  • ReraGenie IDRG-MH-15895

Builder

  • NameNOW Realty Promoters and Builders Private Limited
  • Entity typeCompany
  • CINU45201PN2016PTC167316
  • GSTIN27AAICR3747C1ZD
  • Other registrations3 more →
  • Completed2 of 4
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects2 →

Key dates

4 months past promisethis monthRegisteredFeb 2020First promiseJun 2025Revised toJun 2026

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on7 Feb 2020
  • Promised completion30 Jun 2026
  • Revised completionRevised to 30 Jun 2026 (originally 30 Jun 2025)
  • Buildings1 building record
  • Documents filed59 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building ENA400000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 1 Feb 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 90%.

Building E: 85% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.70%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.40%

Progress on shared amenities15

As on 1 Feb 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes40%
Water SupplyYes40%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes40%
Storm Water DrainsYes40%
Landscaping & Tree PlantingYes40%
Street LightingYes40%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes40%
Solid Waste Management And DisposalYes40%
Water conservation /Rain water harvestingYes40%
Energy managemcntYes40%
Fire protection and fire safety requirementsYes40%
Electrical meter room, sub-station, receiving stationYes40%
Aggregate area of recreational Open SpaceYes40%
Open ParkingYes40%

Parking filed300

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots300
Closed/Covered280
Open Space20

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area4,619 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityPune Municipal Corporation
Permissible FSI12875.51
Proposed, not sanctioned5,546 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBAKRE AVENUE F P NO 226 3 PUNE 411004

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSameer Valimbe Walimbe
EngineerVishwanath Kolekar Kolekar
Chartered AccountantM.P. Chitale & Co.
Chartered AccountantSpak and Co
PartnerRole in project
NOW Realty Promoters and Builders Private Limited-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100012669Jun 2025 → Jun 2026

Reason as filed by the promoterSanctioning authority has granted additional sanction in the said building which might need additional time to complete the building. The new buyers should be aware of the extended date of possession well in advance hence applying for ext in advance. The present allottees are being informed about this change in date of possession and the present alottees have shared there consent, attached herewith.

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC12604338KAILAS CHANDAKNOW Realty Promoters and Builders Private Limited11/07/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 24 Jan 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 1 Feb 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 20 Jan 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 20 Jan 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed59

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Layout approvalFile: Layout Plan_page 1.pdf1 Feb 2025
Copy of Layout Approval (in case of layout)File: Layout Plan_page 1.pdf1 Feb 2025
Layout approvalFile: Layout Plan_page 1-compressed.pdf20 Jan 2025
Building plan approvalFile: Layout Plan_page 1-compressed.pdf20 Jan 2025
Building plan approvalFile: E bldg 8_16_17_18_19_26_28_31_32_33_34_36 floor plan page 7-compressed (1).pdf20 Jan 2025
Building plan approvalFile: E bldg 8_16_17_18_19_26_28_31_32_33_34_36 floor plan page 7-compressed (1).pdf20 Jan 2025
Building plan approvalFile: E bldg 5th, 10th, 6th, 9th floor plan page 5 - converted.pdf20 Jan 2025
Copy of Layout Approval (in case of layout)File: Layout Plan_page 1-compressed.pdf20 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 E bld Jan 2025.pdf20 Jan 2025
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate_27-77-24.pdf20 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: Layout Plan_page 1-compressed.pdf20 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: E bldg 8_16_17_18_19_26_28_31_32_33_34_36 floor plan page 7-compressed (1).pdf20 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: E bldg 8_16_17_18_19_26_28_31_32_33_34_36 floor plan page 7-compressed (1).pdf20 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: E bldg 5th, 10th, 6th, 9th floor plan page 5 - converted.pdf20 Jan 2025
Layout approvalFile: Layout Plan_page 1.pdf27 Dec 2024
Building plan approvalFile: E bldg 8_16_17_18_19_26_28_31_32_33_34_36 floor plan page 7.pdf27 Dec 2024
Copy of Layout Approval (in case of layout)File: Layout Plan_page 1.pdf27 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: E bldg 8_16_17_18_19_26_28_31_32_33_34_36 floor plan page 7.pdf27 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Bldg E March 2024_compressed.pdf20 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: form 2 March 2024.pdf18 Jun 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 3 Bldg E March 2024_compressed.pdf18 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 RERA Arch certificate Dec 2023.pdf28 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 RERA Eng Certificate Dec 2023.pdf28 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A New Eng Quality Asurance.pdf28 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate.pdf28 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 2022 23.pdf28 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 FY 2021-22 Bldg E.pdf8 Aug 2023
Declaration about Commencement CertificateFile: Declaration about Commencement Serano E wing.pdf16 Jan 2023
Disclosure of sold/ booked inventoryFile: Declaration of Sold-unsold inventory.pdf16 Jan 2023
Building plan approvalFile: Floor Plan E wing Nov 23.pdf28 Nov 2022
Details of encumbrances concerned to FinanceFile: No encumbrance- legal.pdf28 Nov 2022
Details of encumbrances concerned to LegalFile: No encumbrance- legal.pdf28 Nov 2022
Building Plan Approval / NA Order for plotted developmentFile: Floor Plan E wing Nov 23.pdf28 Nov 2022
Commencement Certificates / NA Order for plotted developmentFile: New commencement Serano.pdf28 Nov 2022
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate- Serano E wing Revised 11-11-2022.pdf28 Nov 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A - Jan 2020.pdf4 Nov 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A Building E - Dec 2021.pdf4 Nov 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Building E - April 2022 Now Sereno.pdf24 Aug 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 -Building E- May 2022 Now sereno.pdf11 Aug 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A Building E - Dec 2021 Now Sereno.pdf11 Aug 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 Building E- March 2022 Now realty.pdf11 Aug 2022
CERSAI detailsFile: CERSAI_Search_Report_New.pdf18 Feb 2022
Proforma of Allotment letterFile: 24K Sereno Draft.pdf18 Feb 2022
Details of encumbrancesFile: Index II - Kotak_compressed.pdf22 Jan 2022
Layout approvalFile: DEST200000001520.pdf15 Apr 2021
Copy of Layout Approval (in case of layout)File: DEST200000001520.pdf15 Apr 2021
Proforma of Allotment letterFile: 24K Sereno Building E Sale draft Rev.pdf27 Aug 2020
Layout approvalFile: Layout with E bldg.pdf24 Jan 2020
Building plan approvalFile: Layout with E bldg.pdf24 Jan 2020
PAN CardFile: PAN NRPBPL.pdf24 Jan 2020
Copy of the legal title reportFile: Title certificate.pdf24 Jan 2020
Details of encumbrancesFile: Encumbrance details 1.pdf24 Jan 2020
Details of encumbrancesFile: Encumbrance details 2.pdf24 Jan 2020
Copy of Layout Approval (in case of layout)File: Layout with E bldg.pdf24 Jan 2020
Building Plan Approval / NA Order for plotted developmentFile: Layout with E bldg.pdf24 Jan 2020
Commencement Certificates / NA Order for plotted developmentFile: Commencement cert.pdf24 Jan 2020
Declaration in FORM BFile: Form B.pdf24 Jan 2020
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 mini CA cert.pdf24 Jan 2020
Proforma of Allotment letterFile: E bldg sale agreement draft.pdf24 Jan 2020

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered late1 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
24K Sereno Building FP52100053702Baner, Pune40Nov 2023OngoingDec 2029Not due yet
24K Sereno Building ABaner68-CompletedMar 2020Late, Sep 2020

How this compares with Pune

26%of Pune projects moved their completion datethis one moved by 12 months
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep 24K Sereno Building E on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Samarth Colony13,700+ in Pune

2 km24K Sereno Building ECompleted 157Lapsed / revoked 49Other 154Dot size: filed unitsN

Filed coordinates, straight-line distance. 360 registered projects within 2 km.

Builder: NOW Realty Promoters and Builders Private Limited

NOW Realty Promoters and Builders Private Limited has 4 registrations on MahaRERA, including 24K Sereno Buildings C and D and 24K Sereno Building A. Its filings disclose 2 earlier MahaRERA projects: declares 0 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that 24K Sereno Building E shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if 24K Sereno Building E is delayed beyond 30 Jun 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of 24K Sereno Building E?

The registered promoter entity is NOW Realty Promoters and Builders Private Limited, a company as per the filing. Its CIN U45201PN2016PTC167316 and GSTIN 27AAICR3747C1ZD can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in 24K Sereno Building E?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against 24K Sereno Building E?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for 24K Sereno Building E?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at 24K Sereno Building E?

The professionals named in the filing: Architect: Sameer Valimbe Walimbe; Engineer: Vishwanath Kolekar Kolekar; Chartered Accountant: M.P. Chitale & Co.; Chartered Accountant: Spak and Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in 24K Sereno Building E?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About 24K Sereno Building E. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save 24K Sereno Building E to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.