Home / Browse projects / Nashik, Maharashtra / 24 Gems

Completed No litigation declared Residential / Group Housing project

24 Gems

By T M Estates LLP

RG-MH-07062 · RERA P51600076779 · Last updated on MahaRERA portal: 28 Mar 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedregistration recorded completed
8 of 11Construction stages donefurthest along: Installation of Lifts, 50%
10 of 12Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 77 documents Report an error

24 Gems is a Residential / Group Housing project by T M Estates LLP in Nashik, Maharashtra, registered with MahaRERA as P51600076779 on 28 Jun 2024. The registration is recorded completed; possession was promised by 31 Dec 2026. 2 of the 12 units on this registration are recorded sold or booked, and 8 of 11 construction stages are filed complete.

At a glance

Project

  • Name24 Gems
  • TypeResidential / Group Housing
  • Location
    • Govind Nagar
    • Wazare Nagar
    • Nashik (M Corp.)
    • Nashik
    • 422009
  • Pincode422009
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51600076779
  • ReraGenie IDRG-MH-07062

Builder

  • NameT M Estates LLP
  • Entity typePartnership
  • PartnersTushar Fakirchand Sancheti, Tushar Navsukhlal Picha, Manish Navsukhlal Picha, Meena Vardhaman Bramhecha

Key dates

this monthRegisteredJun 2024PromisedDec 2026Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on28 Jun 2024
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed77 files

Current status

17%2 of 12 units booked
98.5%Work done, per cost certificate

Figures as on 28 Mar 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
24 GemsNA6612012

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 28 Mar 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 11 construction stages are filed complete. The stage furthest along is Installation of Lifts, at 50%.

24 Gems: 77% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%

Progress on shared amenities15

As on 28 Mar 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed12

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots12
Closed/Covered12

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area558 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on25 Nov 2025

Approvals and building plan

Sanctioning authorityNashik Municipal Corporation
Permissible FSI1678.86
Proposed, not sanctioned1,679 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchUrkan Arcade, Bhujbal Farm Road, Plot No Me-1, Cidco, Indira Nagar
Estimated costRs 4.22 cr
Cost incurredRs 4.16 cr
Work done98.48%
BuildingWingEstimatedIncurred
24 GemsNARs 4.00 crRs 4.00 cr
-NARs 22.00 lakhRs 15.59 lakh

Certifying professionals and partners8

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectOjas Fakirchand Sancheti
ArchitectOS Architects and Associates
EngineerAnil Shivaji Chandar
EngineerSC Consult & Construct
EngineerChetan Balchand Sancheti
Chartered AccountantCA Paresh P. Sabadra
Chartered AccountantRSPH & Associates
Chartered AccountantP N Sabadra and Associates
PartnerRole in project
T M Estates LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 22 May 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 18 May 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 18 May 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 24 Jun 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed77

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: AR Dec 2024.pdf28 Mar 2026
Form 2File: Engineer Dec 2024.pdf28 Mar 2026
Form 3File: CA Dec 2024.pdf28 Mar 2026
Disclosure of Sold and Booked InventoryFile: Disclosure Dec 2024.pdf28 Mar 2026
Form 1File: AR Sept 2024.pdf28 Mar 2026
Form 2File: Engineer Sept 2024.pdf28 Mar 2026
Form 3File: Sept CA 2024.pdf28 Mar 2026
Disclosure of Sold and Booked InventoryFile: Disclosure Sept 2024.pdf28 Mar 2026
Form 1File: AR June 2024.pdf28 Mar 2026
Form 2File: Engineer June 2024.pdf28 Mar 2026
Form 3File: CA June 2024.pdf28 Mar 2026
Disclosure of Sold and Booked InventoryFile: Disclosure June 2024.pdf28 Mar 2026
Form 2A (FY 2024-2025)File: Form 2A - March 25 .pdf28 Mar 2026
Occupational CertificateFile: Occupancy Certificate.pdf28 Mar 2026
Withdrawal Update Form 1File: AR - Dec 25 .pdf30 Jan 2026
Withdrawal Update Form 2File: ER - Dec 25 .pdf30 Jan 2026
Withdrawal Update Form 3File: CA - Dec 25 -Final.pdf30 Jan 2026
Form 1File: Architect Certificate.pdf7 Jan 2026
Form 2File: Engineer Certificate.pdf7 Jan 2026
Form 3File: CA Certificate Final.pdf7 Jan 2026
Disclosure of Sold and Booked InventoryFile: TM Estates LLP For 24 Gems20250415_13063116.pdf7 Jan 2026
Withdrawal Update Form 1File: AR - Sept 25 .pdf1 Jan 2026
Withdrawal Update Form 2File: ER - Sept 25 .pdf1 Jan 2026
Withdrawal Update Form 3File: CA sept.pdf1 Jan 2026
Form 5 (FY 2024-2025)File: RERA audit report final.pdf1 Jan 2026
Form 1File: AR June 25.pdf1 Oct 2025
Form 2File: ER June 25.pdf1 Oct 2025
Form 3File: CA June 25.pdf1 Oct 2025
Disclosure of Sold and Booked InventoryFile: Disclosure - june 25.pdf1 Oct 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf18 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Final.pdf18 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf18 Apr 2025
Other - TechnicalFile: ENGINNER'S CERTIFICATE FOR QUALITY ASSURANCE-1 18042025.pdf18 Apr 2025
Disclosure of sold/ booked inventoryFile: TM Estates LLP For 24 Gems20250415_13063116.pdf17 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Cert dec 202420250120_13580739.pdf20 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate dec final.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engr Cert dec 202420250120_15364108.pdf20 Jan 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure Dec 2024.pdf20 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architech Certificate.pdf6 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf6 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf6 Dec 2024
Disclosure of sold/ booked inventoryFile: T M ESTATES LLP 20241121_13481701.pdf6 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate-Sign Copy_compressed.pdf21 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AR JUNE.pdf21 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ER -June.pdf21 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AR JUNE.pdf21 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate-Sign Copy_compressed.pdf21 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ER -June.pdf21 Nov 2024
Disclosure of sold/ booked inventoryFile: 24 Gems Discloser June20241026_14150050.pdf11 Nov 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest.pdf26 Jun 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: TM Estates Clarification Letter.pdf26 Jun 2024
Other - LegalFile: One Plot One Registration-TM Estates LLP.pdf26 Jun 2024
Other - TechnicalFile: One Plot One Registration-TM Estates LLP.pdf26 Jun 2024
Commencement Certificates / NA Order for plotted developmentFile: CC and Correction.pdf24 Jun 2024
Other - LegalFile: REA51600163203 (1).pdf24 Jun 2024
Other - TechnicalFile: REA51600163203 (1).pdf24 Jun 2024
Declaration about Commencement CertificateFile: Form D.pdf15 Jun 2024
Declaration in FORM BFile: Form B.pdf15 Jun 2024
CERSAI detailsFile: Cersai.pdf15 Jun 2024
Proforma of Allotment letterFile: Allotment Letter_compressed.pdf15 Jun 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration Separate Bank Acc.pdf15 Jun 2024
Deviation Report with respect to Allotment letterFile: Model form of allotment letter.pdf15 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: TM Estates LLP CA Certificate_Signed.pdf23 May 2024
Proforma of Agreement for saleFile: Agreement for Sale.pdf23 May 2024
Deviation Report with respect to model copy of AgreementFile: AFS-Deviation-TM Estates LLP.pdf23 May 2024
Copy of the legal title reportFile: Title Report T M Estate.pdf22 May 2024
Details of encumbrances concerned to FinanceFile: No encumbarance Concerned to Finance.pdf22 May 2024
Details of encumbrances concerned to FinanceFile: No encumbarance Concerned to Legal.pdf22 May 2024
Details of encumbrances concerned to LegalFile: No encumbarance Concerned to Finance.pdf22 May 2024
Details of encumbrances concerned to LegalFile: No encumbarance Concerned to Legal.pdf22 May 2024
Layout approvalFile: Plan.pdf18 May 2024
Building plan approvalFile: Plan.pdf18 May 2024
PAN CardFile: Firm Pan Card.pdf18 May 2024
Copy of Layout Approval (in case of layout)File: Plan.pdf18 May 2024
Building Plan Approval / NA Order for plotted developmentFile: Plan.pdf18 May 2024
Other - LegalFile: Land Deed - converted.pdf18 May 2024
Other - LegalFile: LLP Agreement - converted.pdf18 May 2024

How this compares with Nashik

17%of this project is bookeddistrict median 17%
10%of Nashik projects moved their completion datethis one has not
19%of Nashik registrations have lapsed or been cancelledthis one is completed

Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.

Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep 24 Gems on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Wazare Nagar4,100+ in Nashik

2 km24 GemsCompleted 175Lapsed / revoked 35Other 100Dot size: filed unitsN

Filed coordinates, straight-line distance. 310 registered projects within 2 km.

Builder: T M Estates LLP

T M Estates LLP has 1 registration on MahaRERA, including 24 Gems. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nashik district page.

Frequently asked questions

What are my rights if 24 Gems is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of 24 Gems?

The registered promoter entity is T M Estates LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in 24 Gems?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for 24 Gems?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at 24 Gems?

The professionals named in the filing: Architect: Ojas Fakirchand Sancheti; Architect: OS Architects and Associates; Engineer: Anil Shivaji Chandar; Engineer: SC Consult & Construct; Engineer: Chetan Balchand Sancheti; Chartered Accountant: CA Paresh P. Sabadra. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in 24 Gems?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About 24 Gems. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save 24 Gems to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.