Registered No litigation declared Others project

198 City hub

By Urban Syndicate

RG-MH-78491 · RERA P52100019925 · Last updated on MahaRERA portal: 28 Oct 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 46 months, 4 of them under MahaRERA's automatic 4-month extension
  • 4 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Apr 2027Possession promisedmoved 46 months from the original
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 140 documents Report an error

198 City hub is a Others project by Urban Syndicate in Pune, Maharashtra, registered with MahaRERA as P52100019925 on 13 Mar 2019. Possession is promised by 30 Apr 2027. The completion date has moved by 46 months from the original filing, 4 of them under MahaRERA's automatic 4-month extension for the West Asia conflict.

At a glance

Project

  • Name198 City hub
  • TypeOthers
  • Location
    • Ganesh peth
    • CTS 198
    • Pune (M Corp.)
    • Pune City
    • Pune
    • 411002
  • Pincode411002
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100019925
  • ReraGenie IDRG-MH-78491

Builder

  • NameUrban Syndicate
  • Entity typePartnership
  • PartnersKiran Hasmukhlal Shah, Ojas Kiran Shah, Jay Pankaj Shah, Urban Consortium Private Limited
  • Other registrations1 more →
  • Declared earlier projects2 →

Key dates

this monthRegisteredMar 2019First promiseJun 2023Revised toApr 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on13 Mar 2019
  • Promised completion30 Apr 2027
  • Revised completionRevised to 30 Apr 2027 (originally 30 Jun 2023)
  • Buildings1 building record
  • Documents filed140 files

Current status

95.6%Work done, per cost certificate

Figures as on 28 Oct 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
198 City hubNA130000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 28 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

198 City hub: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 28 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes80%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes30%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes60%

Parking filed76

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots76
Closed/Covered76

Land and ownership2

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,375 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on1 Jul 2026
LandownerVillageDistrict
Bhanumati Hasmukhlal ShahPune (M Corp.)Pune
Smt. Bhanumati Hasmukhlal ShahPune (M Corp.)Pune

Approvals and building plan

Sanctioning authorityPune Municipal corporation
Permissible FSI2338.22
Proposed, not sanctioned2,302 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSomshankar Chambers, Survey No 46, Plot - 1, Kaka Halwai Estate, Opp City Pride, Pune-Satara Road - 411009
Estimated costRs 44.00 cr
Cost incurredRs 42.08 cr
Work done95.64%
BuildingWingEstimatedIncurred
198 City hubNARs 22.00 crRs 21.03 cr
-NARs 22.00 crRs 21.05 cr

Certifying professionals and partners8

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectArchitect Sachin Solanki
ArchitectSachin Solanki
EngineerER Shubham Sadafule
EngineerNaved Mandvikar
EngineerPrabhakar Jadhav
EngineerMahesh Dhavare
Chartered AccountantD A Pawar & Company
Chartered AccountantPrakash Suneja & Associates
PartnerRole in project
Urban Syndicate-

Extensions5

A revised date filed with the regulator does not change the possession date in your agreement for sale. Commentary on the order notes that a buyer's right to interest for delay under section 18 of RERA may still stand; that question has not been tested.

MahaRERA order of 7 Aug 2026Dec 2026 → Apr 2027

Granted by MahaRERA, not applied for by the promoterMahaRERA's order of 7 August 2026 extended the completion date of eligible registered projects by four months, treating the West Asia conflict as force majeure. Promoters did not have to apply for it.

EXT52100016754Jun 2023 → Mar 2024

Reason as filed by the promoterwith the consent of all the booked flat owners including me hereby we are giving consent to extend the project completion date. as our project is situated in city side due to city side restrictions for materials our project is getting delayed.

EXT52100019133Jun 2023 → Jun 2024

Reason as filed by the promoterIn accordance with circular no 28, we hereby apply for extension of our project u/s 6 in Format B. The project was delayed for reasons beyond our control on account of various reasons and more particularly on account of the pandemic of Covid-19.

EXT52100024071Jun 2023 → Jun 2026

Reason as filed by the promoterIn accordance with circular no 28, we hereby apply for extension of our project u/s 7(3) in Format B. The project was delayed for reasons beyond our control on account of various reasons and more particularly on account of the pandemic of Covid-19. We have consent of 59.57% allottees for purpose of extension of RERA registration period of the said project.

EA10072621711Jun 2023 → Dec 2026

Reason as filed by the promoterDelay in getting occupancy certificate from respected authority

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 13 Jan 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 28 Oct 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 28 Oct 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 15 Jun 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Apr 2027

Documents filed140

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 140 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2026-2027)File: Form 2A FY 2026-2027.pdf28 Oct 2026
Form 5 (FY 2025-2026)File: FORM 5 (2025-2026).pdf28 Oct 2026
Withdrawal Update Form 1File: Form 1 upto 30-09-2026.pdf27 Oct 2026
Withdrawal Update Form 2File: Form 2 upto 30-09-2026.pdf27 Oct 2026
Withdrawal Update Form 3File: Form 3 upto 30-09-2026.pdf27 Oct 2026
Form 2A (FY 2019-2020)File: Form 2A FY 2019-2020.pdf3 Jul 2026
Form 2A (FY 2020-2021)File: Form 2A FY 2020-2021.pdf3 Jul 2026
Form 2A (FY 2021-2022)File: FORM 2A FY 2021-2022.pdf3 Jul 2026
Form 2A (FY 2023-2024)File: Form 2A FY 2023-2024.pdf3 Jul 2026
Form 2A (FY 2024-2025)File: Form 2A FY 2024-2025.pdf3 Jul 2026
Form 2A (FY 2025-2026)File: Form 2A FY 2025-2026.pdf3 Jul 2026
Form 2A (FY 2024-2025)File: Form 2A FY 2024-2025.pdf3 Jul 2026
Form 2A (FY 2025-2026)File: Form 2A FY 2025-2026.pdf3 Jul 2026
Form 1File: form 1 upto 30-06-2026.pdf1 Jul 2026
Form 2File: form 2 upto 30-06-2026.pdf1 Jul 2026
Form 3File: form 3 upto 30-06-2026.pdf1 Jul 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Unsold Inventory upto 30-06-2026.pdf1 Jul 2026
Form 1File: form 1 upto 31-03-2026.pdf30 Jun 2026
Form 1File: form 1 upto 30-06-2025.pdf30 Jun 2026
Form 1File: form 1 upto 30-09-2025.pdf30 Jun 2026
Form 1File: form 1 upto 31-03-2025.pdf30 Jun 2026
Form 1File: form 1 upto 31-12-2024.pdf30 Jun 2026
Form 1File: form 1 upto 31-12-2025.pdf30 Jun 2026
Form 2File: form 2 upto 31-03-2026.pdf30 Jun 2026
Form 2File: form 2 upto 30-06-2025.pdf30 Jun 2026
Form 2File: form 2 upto 30-09-2025.pdf30 Jun 2026
Form 2File: form 2 upto 31-03-2025.pdf30 Jun 2026
Form 2File: form 2 upto 31-12-2024.pdf30 Jun 2026
Form 2File: form 2 upto 31-12-2025.pdf30 Jun 2026
Form 3File: form 3 upto 31-03-2026.pdf30 Jun 2026
Form 3File: form 3 upto 30-06-2025.pdf30 Jun 2026
Form 3File: form 3 upto 30-09-2025.pdf30 Jun 2026
Form 3File: form 3 upto 31-03-2025.pdf30 Jun 2026
Form 3File: form 3 upto 31-12-2024.pdf30 Jun 2026
Form 3File: form 3 upto 31-12-2025.pdf30 Jun 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Unsold Inventory upto 31-03-2026.pdf30 Jun 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Unsold Inventory upto 30-06-2025.pdf30 Jun 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Unsold Inventory upto 30-09-2025.pdf30 Jun 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Unsold Inventory upto 31-03-2025.pdf30 Jun 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Unsold Inventory upto 31-12-2024.pdf30 Jun 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Unsold Inventory upto 31-12-2025.pdf30 Jun 2026
Form 2A (FY 2018-2019)File: Form 2A FY 2022-2023.pdf30 Jun 2026
Form 2A (FY 2022-2023)File: Form 2A FY 2022-2023.pdf30 Jun 2026
Form 5 (FY 2018-2019)File: 18-19 Form 5.pdf30 Jun 2026
Form 5 (FY 2019-2020)File: 19-20 Form 5.pdf30 Jun 2026
Form 5 (FY 2024-2025)File: 24-25 FORM 5.pdf30 Jun 2026
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate.pdf23 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2 Engineers Certificate.pdf23 Jan 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory (3).pdf23 Jan 2025
Other - TechnicalFile: Annexure - C Form - 2A.pdf23 Jan 2025
Other - TechnicalFile: Annexure - C Form - 2A.pdf23 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: 198 City Hub Urban Syndicate.pdf16 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: 198 City Hub Urban Syndicate.pdf16 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: 198 City Hub Urban Syndicate.pdf16 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf26 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 31-03-2024.pdf21 Jun 2024
Disclosure of sold/ booked inventoryFile: 198 City Hub - Booked-Sold List.pdf21 Jun 2024
Disclosure of sold/ booked inventoryFile: Circular 29.pdf21 Jun 2024
Declaration in FORM BFile: Form B (Affidavit cum Declaration).pdf20 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A - 23-24.pdf20 Jun 2024
Declaration in FORM BFile: Form B.pdf20 Feb 2024
Form 2AFile: Form 2A 19-20.pdf20 Feb 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A 20-21.pdf20 Feb 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A 21-22.pdf20 Feb 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A 22-23.pdf20 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure-A.pdf20 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf11 Jan 2024
Disclosure of sold/ booked inventoryFile: circula 29.pdf11 Jan 2024
Certificates of CA (Form 3)File: Form 3.pdf11 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Maha rera engineer certificate.pdf21 Dec 2023
Certificates of CA (Form 3)File: FORM3_compressed.pdf21 Dec 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: BANKDECL.pdf21 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM5URBAN2223.pdf4 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A FY 2022-2023_compressed.pdf7 Jul 2023
Declaration in FORM BFile: ANNEXB2.pdf6 Jul 2023
Disclosure of sold/ booked inventoryFile: Documents_compressed.pdf1 Jul 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: form5 urban1920.pdf1 Jul 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: form 5 urban 2021.pdf1 Jul 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Rera Audit1819.pdf9 Jun 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A FY 20-211.pdf21 Mar 2023

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 under way, not due yet
ProjectLocationRegisteredStatusPromisedDelivered
KalpavrukkshaP52100056327Hadapsar, PuneMay 2024OngoingDec 2026Not due yet

How this compares with Pune

28%of Pune projects moved their completion datethis one moved by 46 months
25%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 14,000+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep 198 City hub on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near CTS 19814,000+ in Pune

2 km198 City hubCompleted 169Lapsed / revoked 134Other 135Dot size: filed unitsN

Filed coordinates, straight-line distance. 438 registered projects within 2 km.

Builder: Urban Syndicate

Urban Syndicate has 2 registrations on MahaRERA, including 198 City hub and Kalpavrukksha. Its filings disclose 2 earlier MahaRERA projects: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if 198 City hub is delayed beyond 30 Apr 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of 198 City hub?

The registered promoter entity is Urban Syndicate, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in 198 City hub?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for 198 City hub?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at 198 City hub?

The professionals named in the filing: Architect: Architect Sachin Solanki; Architect: Sachin Solanki; Engineer: ER Shubham Sadafule; Engineer: Naved Mandvikar; Engineer: Prabhakar Jadhav; Engineer: Mahesh Dhavare. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in 198 City hub?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About 198 City hub. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save 198 City hub to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.