140 SHIVAJI PARK

By URBANIA REALTY LLP

RG-MH-86984 · RERA P51800012248 · Last updated on MahaRERA portal: 19 Jul 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 16 months past the filed date
  • 6 complaints at MahaRERA
  • Completion date moved by 48 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Jun 2025Possession promised16 months past this date
10 of 11Construction stages donefurthest along: Sanitary Fittings within the flats /..., 95%
2 of 33Units unsoldnot recorded sold or booked
6Complaints at MahaRERAon this registration
Jump to the 122 documents Report an error

140 SHIVAJI PARK is a Residential / Group Housing project by URBANIA REALTY LLP in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800012248 on 1 Sep 2017. Possession was promised by 30 Jun 2025 and is now 16 months past that date. The completion date has moved by 48 months from the original filing. 31 of the 33 units on this registration are recorded sold or booked, and 10 of 11 construction stages are filed complete. 6 complaints are on record with the regulator.

At a glance

Project

  • Name140 SHIVAJI PARK
  • TypeResidential / Group Housing
  • Location
    • Dr Madhukar Rout Road
    • DADAR WEST
    • Greater Mumbai (M Corp.) (Part) (802794)
    • Mumbai
    • Mumbai Suburban
    • 400028
  • Pincode400028
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800012248
  • ReraGenie IDRG-MH-86984

Builder

  • NameURBANIA REALTY LLP
  • Entity typePartnership
  • PartnerAKSHAY SURESH THAKKER

Key dates

16 months past promisethis monthRegisteredSep 2017First promiseJun 2021Revised toJun 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on1 Sep 2017
  • Promised completion30 Jun 2025
  • Revised completionRevised to 30 Jun 2025 (originally 30 Jun 2021)
  • Buildings1 building record
  • Documents filed122 files

Current status

94%31 of 33 units booked

Figures as on 19 Jul 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
140 SHIVAJI PARKNA432932133

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 19 Jul 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Sanitary Fittings within the flats / premises, at 95%.

140 SHIVAJI PARK: 100% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises95%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 19 Jul 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes70%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes60%
Water conservation /Rain water harvestingYes95%
Energy managemcntYes95%
Fire protection and fire safety requirementsYes95%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed80

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots80
Closed/Covered80

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,386 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on27 May 2025

Approvals and building plan

Sanctioning authorityMUNICIPAL CORPORATION OF GREATER MUMBAI
Permissible FSI5522.61
Proposed, not sanctioned5,523 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchLOKHANWALA COMPLEX ANDHERI WEST MUMBAI 400053

Certifying professionals and partners8

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSAMIDHA RAMESH VANAGE
ArchitectMs. Vikkasini Hemmadi
ArchitectBhupali Sawant
EngineerMISAM IMAM
EngineerRAMAKANT SAWANT
Chartered AccountantR M A & CO
Chartered AccountantNavin D Thakker & Co
Chartered AccountantCap & Co
PartnerRole in project
URBANIA REALTY LLP-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800010137Jun 2021 → Dec 2022

Reason as filed by the promoterAs you are aware that we are all going through a very tough phase due to Pandemic Covid 19 which has affected the entire world and stalled the progress of work at our project. During the first wave of Pandemic Covid 19 last year, our entire work force had migrated to their respective villages; due to this the work at our site had come to a virtual standstill. During the course of second half of last year Oct-Nov 2020, only 50 % of the laborers returned to site for work. While the work at site did commence it wasn’t at the speed we would have desired as we were not working at full capacity. As

EXT51800025152Jun 2021 → Jun 2025

Reason as filed by the promoter1. The Project has received has Part Occupation Certificate 2. Project is 90% completed 3. Consent of 77.42 % of allottees uploaded for extension 4. Explanatory note for delay in project completion 5. PERT Chart for remaining completion uploaded in Others Tab No. 2 6. QPR till date are updated 7. Due to unavoidable circumstances project has been delay it will be completed by 30/6/2025 8. Revised Form B is attached in Others Tab and also in the main application

Complaints filed with MahaRERA6

Case no.ComplainantRespondentFiled
CC12501334Balkrishna ChavanURBANIA REALTY LLP22/04/2025
CC12501339Prakash GandhiURBANIA REALTY LLP22/04/2025
CC12501362Hemant ApteURBANIA REALTY LLP24/04/2025
CC12501363Hemant ApteURBANIA REALTY LLP24/04/2025
CC12501364Hemant ApteURBANIA REALTY LLP24/04/2025
CC12501365Aparna ApteURBANIA REALTY LLP24/04/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 30 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 20 Nov 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 20 Nov 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 20 Nov 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 12 Dec 2024

Documents filed122

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 122 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: 140 Shivaji Park Form 1 Dec 2024.pdf19 Jul 2025
Form 2File: 140 Shivaji Park Form 2-Engineers Dec 24.pdf19 Jul 2025
Form 3File: 140 Shivaji Park Form 3-CA Dec 24.pdf19 Jul 2025
Disclosure of Sold and Booked InventoryFile: 140 Shivaji Park Disclosure of Sold Unsold Dec 24.pdf19 Jul 2025
Form 1File: 140 Shivaji Park Form 1 March 25.pdf19 Jul 2025
Form 2File: 140 Shivaji Park Form 2-Engineers Mar 25.pdf19 Jul 2025
Form 3File: 140 Shivaji Park Form 3-CA Mar 25.pdf19 Jul 2025
Disclosure of Sold and Booked InventoryFile: 140 Shivaji Park Disclosure of Sold unsold Mar 25.pdf19 Jul 2025
Form 1File: 140 Shivaji Park Form 1Architect June 25.pdf19 Jul 2025
Form 2File: 140 Shivaji Park Form 2 Engineer June 2025.pdf19 Jul 2025
Form 3File: 140 Shivaji Park FORM-3 June-2025.pdf19 Jul 2025
Disclosure of Sold and Booked InventoryFile: 140 Shivaji Park Disclosure of Sold Unsold June 25.pdf19 Jul 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: 140 Shivaji Park Form 5 FY 2021-22.pdf17 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: 140 Shivaji Park Form 5 FY 2022-23.pdf17 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: 140 Shivaji Park Form 5 FY 2023-24.pdf17 Dec 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 140 Shivaji Park PART OC Letter.pdf12 Dec 2024
Declaration in FORM BFile: Form B 140 Shivaji Park 22-11-2024.pdf22 Nov 2024
Disclosure of sold/ booked inventoryFile: 140 Shivaji Park Sold Unsold Details as on 30-09-24.pdf22 Nov 2024
Layout approvalFile: Layout 140 Shivaji PArk.pdf20 Nov 2024
Building plan approvalFile: IOD Drawings 140 Shivaji Park 1.pdf20 Nov 2024
Building plan approvalFile: IOD Drawings 140 Shivaji Park 2.pdf20 Nov 2024
Copy of Layout Approval (in case of layout)File: Layout 140 Shivaji PArk.pdf20 Nov 2024
Commencement Certificates / NA Order for plotted developmentFile: 140 Shivaji Park FURTHER CC - 35TH FLOOR.pdf20 Nov 2024
Building Plan Approval (IOD)File: IOD Drawings 140 Shivaji Park 2.pdf20 Nov 2024
Building Plan Approval (IOD)File: IOD Drawings 140 Shivaji Park 1.pdf20 Nov 2024
Certificates of CA (Form 3)File: Form 3 June 24.pdf16 Nov 2024
Certificates of CA (Form 3)File: Form 3 Sept 24.pdf16 Nov 2024
Certificates of CA (Form 3)File: Form 3 Mar 24.pdf16 Nov 2024
Certificates of CA (Form 3)File: Form 3 Dec 23.pdf16 Nov 2024
Certificates of CA (Form 3)File: Form 3 Sept 23.pdf16 Nov 2024
Certificates of CA (Form 3)File: Form 3 June 23.pdf16 Nov 2024
Certificates of CA (Form 3)File: Form 3 Dec 22.pdf16 Nov 2024
Certificates of CA (Form 3)File: Form 3 Sept 22.pdf16 Nov 2024
Certificates of CA (Form 3)File: Form 3 June 22.pdf16 Nov 2024
Certificates of CA (Form 3)File: Form 3 Mar 22.pdf16 Nov 2024
Certificates of CA (Form 3)File: Form 3 Dec 21.pdf16 Nov 2024
Certificates of CA (Form 3)File: Form 3 Mar 23.pdf16 Nov 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Dec'23.pdf31 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Sept'24.pdf31 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Jun'24.pdf31 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Mar'24.pdf31 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Sept'23.pdf31 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Jun'23.pdf31 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Mar'23.pdf31 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Dec'22.pdf31 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Sept'22.pdf31 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Jun'22.pdf31 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Mar'22.pdf31 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Dec'21.pdf31 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Certificate Dec'23.pdf31 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Certificate Sept'24.pdf31 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Certificate Jun'24.pdf31 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Certificate Mar'24.pdf31 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Certificate Sept'23.pdf31 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Certificate Jun'23.pdf31 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Certificate Dec'22.pdf31 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Certificate Sept'22.pdf31 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Certificate Jun'22.pdf31 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Certificate Mar'22.pdf31 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Certificate Dec'21.pdf31 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Certificate Mar'23.pdf31 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Quality Certificate FY 21-22.pdf31 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Quality Certificate FY 22-23.pdf31 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Quality Certificate FY 23-24.pdf31 Oct 2024
Certificates of CA (Form 5)File: FORM 5 as on 31MAR2021 (Submission copy).pdf26 Feb 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5 as on 31MAR2021 (Submission copy).pdf26 Feb 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate.pdf29 Oct 2021
Disclosure of sold/ booked inventoryFile: Disclosure of Sold - unsold Inventory.pdf29 Oct 2021
Certificates of CA (Form 3)File: FORM 3 Urbania Realty LLP.pdf29 Oct 2021
Disclosure of sold/ booked inventoryFile: Sold Unsold details.pdf19 Aug 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architects Certificate.pdf17 Aug 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate.pdf17 Aug 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate.pdf17 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Engineers Quality Cerificate.pdf17 Aug 2021
Certificates of CA (Form 3)File: Form-3 Urbania Realty LLP (2).pdf17 Aug 2021
Certificates of CA (Form 3)File: Form-3 Urbania Realty LLP (2).pdf17 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Qualifty Certificate 2020.pdf30 Jun 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5_rera certificate fy 18-19.pdf30 Jun 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5_rera certificate Fy 19-20.pdf30 Jun 2021
Declaration about Commencement CertificateFile: RERA - Declaration about Commencement Certificate - Format D.pdf29 Jun 2021

How this compares with Mumbai Suburban

94%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 48 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is among them

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep 140 SHIVAJI PARK on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near DADAR WEST6,700+ in Mumbai Suburban

2 km140 SHIVAJI PARKCompleted 38Lapsed / revoked 40Other 53Dot size: filed unitsN

Filed coordinates, straight-line distance. 131 registered projects within 2 km.

Builder: URBANIA REALTY LLP

URBANIA REALTY LLP has 1 registration on MahaRERA, including 140 SHIVAJI PARK. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What does it mean that 140 SHIVAJI PARK shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if 140 SHIVAJI PARK is delayed beyond 30 Jun 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of 140 SHIVAJI PARK?

The registered promoter entity is URBANIA REALTY LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in 140 SHIVAJI PARK?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against 140 SHIVAJI PARK?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for 140 SHIVAJI PARK?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at 140 SHIVAJI PARK?

The professionals named in the filing: Architect: SAMIDHA RAMESH VANAGE; Architect: Ms. Vikkasini Hemmadi; Architect: Bhupali Sawant; Engineer: MISAM IMAM; Engineer: RAMAKANT SAWANT; Chartered Accountant: R M A & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in 140 SHIVAJI PARK?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About 140 SHIVAJI PARK. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save 140 SHIVAJI PARK to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.