Home / Browse projects / Nagpur, Maharashtra / 129-RIDDHI SIDDHI HEIGHTS
129-RIDDHI SIDDHI HEIGHTS
RG-MH-70567 · RERA P50500052911 · Last updated on MahaRERA portal: 17 Mar 2026
Source: official MahaRERA filing
Red flags
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
- All 2 earlier projects delivered on promise
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
129-RIDDHI SIDDHI HEIGHTS is a Residential / Group Housing project by DEVANG DEVELOPERS LLP in Nagpur, Maharashtra, registered with MahaRERA as P50500052911 on 5 Oct 2023. The registration is recorded completed; possession was promised by 13 Oct 2025. 9 of the 32 units on this registration are recorded sold or booked, and 10 of 11 construction stages are filed complete.
At a glance
Project
- Name129-RIDDHI SIDDHI HEIGHTS
- TypeResidential / Group Housing
- Location
- KHAMLA
- MOUZA KHAMLA
- Nagpur (M Corp.)
- Nagpur (Urban)
- Nagpur
- 440025
- Pincode440025
- RERA no.P50500052911
- ReraGenie IDRG-MH-70567
Builder
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on5 Oct 2023
- Promised completion13 Oct 2025
- Revised completionRevised to 13 Oct 2025 (originally 1 Oct 2025)
- Buildings1 building record
- Documents filed78 files
Current status
Figures as on 17 Mar 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| AMEYA APARTMENT | NA | 8 | 8 | 32 | 0 | 32 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 17 Mar 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.
AMEYA APARTMENT: 91% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 17 Mar 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | No | Not applicable |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 85% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 0% |
Parking filed1
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership23
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| RUPAL HEMAL NADIYANA | Nagpur (M Corp.) | Nagpur |
| MOHAN MANOHAR BARVE | Nagpur (M Corp.) | Nagpur |
| SHAMKANT MANOHAR BARVE | Nagpur (M Corp.) | Nagpur |
| MAYA SHRIKRISHNA CHIPLUNKAR | Nagpur (M Corp.) | Nagpur |
| OMPRAKASH KANHAIYALAL SHRIVASTAV | Nagpur (M Corp.) | Nagpur |
| REENA OMPRAKASH SHRIVASTAV | Nagpur (M Corp.) | Nagpur |
| VIKAS MOTIRAM HINGWE | Nagpur (M Corp.) | Nagpur |
| ARUNA GIRISH KARWANDE | Nagpur (M Corp.) | Nagpur |
| SAROJINI VINAYAK MUKIM | Nagpur (M Corp.) | Nagpur |
| SUHAS RAGHUNATHPANT JOSHI | Nagpur (M Corp.) | Nagpur |
| VIJAY BHAYYAJI DAWANDE | Nagpur (M Corp.) | Nagpur |
| MANDAR VIJAY DAWANDE | Nagpur (M Corp.) | Nagpur |
| TULJAI ANANT KULKARNI | Nagpur (M Corp.) | Nagpur |
| YOGITA NITIN JOGLEKAR | Nagpur (M Corp.) | Nagpur |
| SONALI AJAY PUNDALIK | Nagpur (M Corp.) | Nagpur |
| ANIL KALIDAS TALVELKAR | Nagpur (M Corp.) | Nagpur |
| ANITA VASANT PANSI | Nagpur (M Corp.) | Nagpur |
| BALCHANDRA PRALHAD DHARMATTI | Nagpur (M Corp.) | Nagpur |
| SUPRIYA SHISHIR BHADURI | Nagpur (M Corp.) | Nagpur |
| BAlWANT KESHAVRAO TARSEKAR | Nagpur (M Corp.) | Nagpur |
| ASHISH KUMAR GHOSHAL | Nagpur (M Corp.) | Nagpur |
| ANAGHA ARAVIND PANSI | Nagpur (M Corp.) | Nagpur |
| SHEELA KPS RAO | Nagpur (M Corp.) | Nagpur |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| AMEYA APARTMENT | NA | Rs 8.29 cr | Rs 4.12 cr |
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | MILIND NADIYANA |
| Engineer | MILIND NADIYANA |
| Engineer | Adesh Raut |
| Engineer | Adesh Arun Raut |
| Chartered Accountant | MJM ASSOCIATES |
| Chartered Accountant | Kumar and Jayakrishnan |
| Partner | Role in project |
|---|---|
| DEVANG DEVELOPERS LLP | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterDue to technical issues encountered on MahaCriti, the newly launched platform by MahaRERA, and delays in receiving construction completion approval from the Planning Authority, we were unable to complete the project in extended time.
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 22 Aug 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 3 May 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 22 Aug 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 3 May 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed78
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Occupational CertificateFile: oc 129.pdf | 17 Mar 2026 |
| Occupational CertificateFile: 129 Oc Mail.pdf | 17 Mar 2026 |
| Occupational CertificateFile: FORM4-_new.pdf | 17 Mar 2026 |
| Withdrawal Update Form 1File: form 1 129 ridhi sidhhi hieghts.pdf | 21 Nov 2025 |
| Withdrawal Update Form 2File: form 2 _ 129 ridhi siddhi hieghts.pdf | 21 Nov 2025 |
| Withdrawal Update Form 3File: form 3 129 ridhi sidhhi hieghts.pdf | 21 Nov 2025 |
| Withdrawal Update Form 1File: Scan_000562.pdf | 26 Jul 2025 |
| Withdrawal Update Form 2File: Engg Certificate_Devang_compressed.pdf | 26 Jul 2025 |
| Withdrawal Update Form 3File: certificate CA.pdf | 26 Jul 2025 |
| Withdrawal Update Form 1File: DEVANG FORM 1 ARCH CERTIFICATE FY 24 25.pdf | 4 Jun 2025 |
| Withdrawal Update Form 2File: Declaration_QPR_merged.pdf | 4 Jun 2025 |
| Withdrawal Update Form 3File: Form 3 Final.pdf | 4 Jun 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA DOCS - DD - FORM1_compressed.pdf | 22 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA DOCS - DD - FORM3_compressed.pdf | 22 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 129RSH_compressed.pdf | 19 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: DSBI 129RSH.pdf | 19 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: DSBI - DD - Q3_0001.pdf | 11 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 22 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 _new_compressed.pdf | 21 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Rotated_Devang.pdf | 9 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: DSBI.pdf | 9 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 -DD -FY23-24_0001_organized.pdf | 14 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 - FY 24 25 - 129RSH_compressed.pdf | 25 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 - Signed_compressed.pdf | 25 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM2 - Q2 - FY 24-25_129 RDH_compressed.pdf | 25 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: DSBI - Q2 FY24-25_129 RDH.pdf | 25 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Signed_compressed.pdf | 7 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: DSBI Apr to Jun 24.pdf | 7 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_compressed.pdf | 7 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_compressed.pdf | 7 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Signed_compressed.pdf | 7 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: DSBI Apr to Jun 24.pdf | 7 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Devang.pdf | 9 Aug 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 - DD - Arch Cert (2).pdf | 23 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A.pdf | 10 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 chartered a cerificate_compressed.pdf | 10 May 2024 |
| Layout approvalFile: DD_MAP PART 1 NEW.pdf | 3 May 2024 |
| Details of encumbrances concerned to FinanceFile: DD_MAP PART 2 NEW_less size.pdf | 3 May 2024 |
| Details of encumbrances concerned to LegalFile: DD_MAP PART 2 NEW_less size.pdf | 3 May 2024 |
| Copy of Layout Approval (in case of layout)File: DD_MAP PART 1 NEW.pdf | 3 May 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: New CC_Green tick.pdf | 3 May 2024 |
| Declaration about Commencement CertificateFile: Format D.pdf | 3 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q4 - Arch certificate.pdf | 24 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Declaration_QPR_merged.pdf | 24 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Declaration.pdf | 24 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Declaration_QPR.pdf | 23 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Declaration_QPR.pdf | 23 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: DSBI Jan- Mar 24.pdf | 23 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Devang Declaration.PDF | 23 Feb 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Devang Declaration.PDF | 23 Feb 2024 |
| Disclosure of sold/ booked inventoryFile: DSBI- Q3 FY 23-24.PDF | 23 Feb 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Devang Declaration.PDF | 23 Feb 2024 |
| CERSAI detailsFile: CERSAI Report.pdf | 28 Aug 2023 |
| CERSAI detailsFile: Bank NOC.pdf | 28 Aug 2023 |
| CERSAI detailsFile: Undertaking for CERSAI.pdf | 28 Aug 2023 |
| Details of encumbrances concerned to FinanceFile: Nil Financial Encumberance.pdf | 26 Aug 2023 |
| Details of encumbrances concerned to FinanceFile: Nil Legal Encumberance final.pdf | 26 Aug 2023 |
| Details of encumbrances concerned to LegalFile: Nil Financial Encumberance.pdf | 26 Aug 2023 |
| Details of encumbrances concerned to LegalFile: Nil Legal Encumberance final.pdf | 26 Aug 2023 |
| Declaration about Commencement CertificateFile: Format -D.pdf | 26 Aug 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.PDF | 26 Aug 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.PDF | 26 Aug 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Final.pdf | 26 Aug 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Ane A _Hemal_.pdf | 26 Aug 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Ane A Rupal.PDF | 26 Aug 2023 |
| Proforma of Agreement for saleFile: AFS.pdf | 26 Aug 2023 |
| Proforma of Allotment letterFile: Allotment Letter_.pdf | 26 Aug 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank Account declaration.PDF | 26 Aug 2023 |
| Deviation Report with respect to Allotment letterFile: No Deviation AL.pdf | 26 Aug 2023 |
| Deviation Report with respect to model copy of AgreementFile: No Deviation AFS.pdf | 26 Aug 2023 |
| Declaration in FORM BFile: Affidavit_Promoter_.pdf | 25 Aug 2023 |
| Layout approvalFile: Sanction Map_green tick.pdf | 22 Aug 2023 |
| Building plan approvalFile: Sanction Map_green tick.pdf | 22 Aug 2023 |
| PAN CardFile: Devang Developers PAN.pdf | 22 Aug 2023 |
| Copy of the legal title reportFile: Search Report_.pdf | 22 Aug 2023 |
| Copy of Layout Approval (in case of layout)File: Sanction Map_green tick.pdf | 22 Aug 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Sanction Map_green tick.pdf | 22 Aug 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: BUILDING PERMISSION SANCTION.pdf | 22 Aug 2023 |
Promoter's earlier projects2
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|
| RIDDHI SIDDHI HEIGHTSP50500029039 | DHARAMPETH EXTENSION, Nagpur | Apr 2021 | Completed | May 2023 | Jan 2023 |
| MANGALMURTI RESIDENCYP50500018698 | NEAR AKAR ANAGAR, MOUZA : BORGAON, NAGPUR, Nagpur | Nov 2018 | Completed | Dec 2022 | Jul 2021 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nagpur
Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.
Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 3 other registrations, which the RERA portal never shows together
- All 78 filed documents as one ZIP, foldered, with a manifest
Keep 129-RIDDHI SIDDHI HEIGHTS on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near MOUZA KHAMLA2,800+ in Nagpur
VED OCSP 5
PRAFULVED INFRA & PRAFUL DESHMUKH ASSOCIAT
MAHALAXMI NAGAR 22
RAHULBONDREANDOTHERS
Rachana Ekaa-2
Rachana construction Co. (Nagpur) Pvt. Ltd
MAHALAXMI NAGAR 23 SECTOR 1
RAHUL JAGDISH BONDRE
DEOPRAKASH SUMMIT
AAROHAN BUILDERS AND DEVELOPERS
K-SQUARE NERIUM
ANKIT CONSTRUCTION
See every Nagpur project, with the district possession charts
Builder: DEVANG DEVELOPERS LLP
DEVANG DEVELOPERS LLP has 4 registrations on MahaRERA, including MANGALMURTI RESIDENCY and RIDDHI SIDDHI HEIGHTS. Its filings disclose 2 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record. See more projects on the Nagpur district page.
Frequently asked questions
What are my rights if 129-RIDDHI SIDDHI HEIGHTS is delayed beyond 13 Oct 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of 129-RIDDHI SIDDHI HEIGHTS?
The registered promoter entity is DEVANG DEVELOPERS LLP, a partnership as per the filing. Its GSTIN 27AANFD9750B1ZB can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in 129-RIDDHI SIDDHI HEIGHTS?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for 129-RIDDHI SIDDHI HEIGHTS?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at 129-RIDDHI SIDDHI HEIGHTS?
The professionals named in the filing: Architect: MILIND NADIYANA; Engineer: MILIND NADIYANA; Engineer: Adesh Raut; Engineer: Adesh Arun Raut; Chartered Accountant: MJM ASSOCIATES; Chartered Accountant: Kumar and Jayakrishnan. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in 129-RIDDHI SIDDHI HEIGHTS?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback