Completed No litigation declared Residential / Group Housing project

129-RIDDHI SIDDHI HEIGHTS

By DEVANG DEVELOPERS LLP

RG-MH-70567 · RERA P50500052911 · Last updated on MahaRERA portal: 17 Mar 2026

Source: official MahaRERA filing

Red flags

  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 2 earlier projects delivered on promise

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Oct 2025Possession promisedregistration recorded completed
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
23 of 32Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 78 documents Report an error

129-RIDDHI SIDDHI HEIGHTS is a Residential / Group Housing project by DEVANG DEVELOPERS LLP in Nagpur, Maharashtra, registered with MahaRERA as P50500052911 on 5 Oct 2023. The registration is recorded completed; possession was promised by 13 Oct 2025. 9 of the 32 units on this registration are recorded sold or booked, and 10 of 11 construction stages are filed complete.

At a glance

Project

  • Name129-RIDDHI SIDDHI HEIGHTS
  • TypeResidential / Group Housing
  • Location
    • KHAMLA
    • MOUZA KHAMLA
    • Nagpur (M Corp.)
    • Nagpur (Urban)
    • Nagpur
    • 440025
  • Pincode440025
  • RERA no.P50500052911
  • ReraGenie IDRG-MH-70567

Builder

  • NameDEVANG DEVELOPERS LLP
  • Entity typePartnership
  • GSTIN27AANFD9750B1ZB
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • PartnersHEMAL HARIKISHAN NADIYANA, RUPAL H NADIYANA
  • Other registrations3 more →
  • Completed3 of 4
  • Declared earlier projects2 →

Key dates

this monthRegisteredOct 2023First promiseOct 2025Revised toOct 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on5 Oct 2023
  • Promised completion13 Oct 2025
  • Revised completionRevised to 13 Oct 2025 (originally 1 Oct 2025)
  • Buildings1 building record
  • Documents filed78 files

Current status

28%9 of 32 units booked
49.7%Work done, per cost certificate

Figures as on 17 Mar 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
AMEYA APARTMENTNA8832032

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 17 Mar 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

AMEYA APARTMENT: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 17 Mar 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)NoNot applicable
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes85%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed1

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1
Closed/Covered1

Land and ownership23

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area883 sq m
Land owned byThe promoter, with other names on the file
Named landowners23
LandownerVillageDistrict
RUPAL HEMAL NADIYANANagpur (M Corp.)Nagpur
MOHAN MANOHAR BARVENagpur (M Corp.)Nagpur
SHAMKANT MANOHAR BARVENagpur (M Corp.)Nagpur
MAYA SHRIKRISHNA CHIPLUNKARNagpur (M Corp.)Nagpur
OMPRAKASH KANHAIYALAL SHRIVASTAVNagpur (M Corp.)Nagpur
REENA OMPRAKASH SHRIVASTAVNagpur (M Corp.)Nagpur
VIKAS MOTIRAM HINGWENagpur (M Corp.)Nagpur
ARUNA GIRISH KARWANDENagpur (M Corp.)Nagpur
SAROJINI VINAYAK MUKIMNagpur (M Corp.)Nagpur
SUHAS RAGHUNATHPANT JOSHINagpur (M Corp.)Nagpur
VIJAY BHAYYAJI DAWANDENagpur (M Corp.)Nagpur
MANDAR VIJAY DAWANDENagpur (M Corp.)Nagpur
TULJAI ANANT KULKARNINagpur (M Corp.)Nagpur
YOGITA NITIN JOGLEKARNagpur (M Corp.)Nagpur
SONALI AJAY PUNDALIKNagpur (M Corp.)Nagpur
ANIL KALIDAS TALVELKARNagpur (M Corp.)Nagpur
ANITA VASANT PANSINagpur (M Corp.)Nagpur
BALCHANDRA PRALHAD DHARMATTINagpur (M Corp.)Nagpur
SUPRIYA SHISHIR BHADURINagpur (M Corp.)Nagpur
BAlWANT KESHAVRAO TARSEKARNagpur (M Corp.)Nagpur
ASHISH KUMAR GHOSHALNagpur (M Corp.)Nagpur
ANAGHA ARAVIND PANSINagpur (M Corp.)Nagpur
SHEELA KPS RAONagpur (M Corp.)Nagpur

Approvals and building plan

Sanctioning authorityNagpur Municipal Corporation
Permissible FSI2822.01
Proposed, not sanctioned2,822 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKINGSWAY NAGPUR 440001
Estimated costRs 8.29 cr
Cost incurredRs 4.12 cr
Work done49.73%
BuildingWingEstimatedIncurred
AMEYA APARTMENTNARs 8.29 crRs 4.12 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMILIND NADIYANA
EngineerMILIND NADIYANA
EngineerAdesh Raut
EngineerAdesh Arun Raut
Chartered AccountantMJM ASSOCIATES
Chartered AccountantKumar and Jayakrishnan
PartnerRole in project
DEVANG DEVELOPERS LLP-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA09122518581Oct 2025 → Oct 2025

Reason as filed by the promoterDue to technical issues encountered on MahaCriti, the newly launched platform by MahaRERA, and delays in receiving construction completion approval from the Planning Authority, we were unable to complete the project in extended time.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 22 Aug 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 3 May 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 22 Aug 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 3 May 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed78

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupational CertificateFile: oc 129.pdf17 Mar 2026
Occupational CertificateFile: 129 Oc Mail.pdf17 Mar 2026
Occupational CertificateFile: FORM4-_new.pdf17 Mar 2026
Withdrawal Update Form 1File: form 1 129 ridhi sidhhi hieghts.pdf21 Nov 2025
Withdrawal Update Form 2File: form 2 _ 129 ridhi siddhi hieghts.pdf21 Nov 2025
Withdrawal Update Form 3File: form 3 129 ridhi sidhhi hieghts.pdf21 Nov 2025
Withdrawal Update Form 1File: Scan_000562.pdf26 Jul 2025
Withdrawal Update Form 2File: Engg Certificate_Devang_compressed.pdf26 Jul 2025
Withdrawal Update Form 3File: certificate CA.pdf26 Jul 2025
Withdrawal Update Form 1File: DEVANG FORM 1 ARCH CERTIFICATE FY 24 25.pdf4 Jun 2025
Withdrawal Update Form 2File: Declaration_QPR_merged.pdf4 Jun 2025
Withdrawal Update Form 3File: Form 3 Final.pdf4 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA DOCS - DD - FORM1_compressed.pdf22 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA DOCS - DD - FORM3_compressed.pdf22 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 129RSH_compressed.pdf19 Apr 2025
Disclosure of sold/ booked inventoryFile: DSBI 129RSH.pdf19 Apr 2025
Disclosure of sold/ booked inventoryFile: DSBI - DD - Q3_0001.pdf11 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf22 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 _new_compressed.pdf21 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Rotated_Devang.pdf9 Jan 2025
Disclosure of sold/ booked inventoryFile: DSBI.pdf9 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 -DD -FY23-24_0001_organized.pdf14 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 - FY 24 25 - 129RSH_compressed.pdf25 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 - Signed_compressed.pdf25 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM2 - Q2 - FY 24-25_129 RDH_compressed.pdf25 Nov 2024
Disclosure of sold/ booked inventoryFile: DSBI - Q2 FY24-25_129 RDH.pdf25 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Signed_compressed.pdf7 Oct 2024
Disclosure of sold/ booked inventoryFile: DSBI Apr to Jun 24.pdf7 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_compressed.pdf7 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_compressed.pdf7 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Signed_compressed.pdf7 Oct 2024
Disclosure of sold/ booked inventoryFile: DSBI Apr to Jun 24.pdf7 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Devang.pdf9 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 - DD - Arch Cert (2).pdf23 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A.pdf10 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 chartered a cerificate_compressed.pdf10 May 2024
Layout approvalFile: DD_MAP PART 1 NEW.pdf3 May 2024
Details of encumbrances concerned to FinanceFile: DD_MAP PART 2 NEW_less size.pdf3 May 2024
Details of encumbrances concerned to LegalFile: DD_MAP PART 2 NEW_less size.pdf3 May 2024
Copy of Layout Approval (in case of layout)File: DD_MAP PART 1 NEW.pdf3 May 2024
Commencement Certificates / NA Order for plotted developmentFile: New CC_Green tick.pdf3 May 2024
Declaration about Commencement CertificateFile: Format D.pdf3 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q4 - Arch certificate.pdf24 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Declaration_QPR_merged.pdf24 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Declaration.pdf24 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Declaration_QPR.pdf23 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Declaration_QPR.pdf23 Apr 2024
Disclosure of sold/ booked inventoryFile: DSBI Jan- Mar 24.pdf23 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Devang Declaration.PDF23 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Devang Declaration.PDF23 Feb 2024
Disclosure of sold/ booked inventoryFile: DSBI- Q3 FY 23-24.PDF23 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Devang Declaration.PDF23 Feb 2024
CERSAI detailsFile: CERSAI Report.pdf28 Aug 2023
CERSAI detailsFile: Bank NOC.pdf28 Aug 2023
CERSAI detailsFile: Undertaking for CERSAI.pdf28 Aug 2023
Details of encumbrances concerned to FinanceFile: Nil Financial Encumberance.pdf26 Aug 2023
Details of encumbrances concerned to FinanceFile: Nil Legal Encumberance final.pdf26 Aug 2023
Details of encumbrances concerned to LegalFile: Nil Financial Encumberance.pdf26 Aug 2023
Details of encumbrances concerned to LegalFile: Nil Legal Encumberance final.pdf26 Aug 2023
Declaration about Commencement CertificateFile: Format -D.pdf26 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.PDF26 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.PDF26 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Final.pdf26 Aug 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Ane A _Hemal_.pdf26 Aug 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Ane A Rupal.PDF26 Aug 2023
Proforma of Agreement for saleFile: AFS.pdf26 Aug 2023
Proforma of Allotment letterFile: Allotment Letter_.pdf26 Aug 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank Account declaration.PDF26 Aug 2023
Deviation Report with respect to Allotment letterFile: No Deviation AL.pdf26 Aug 2023
Deviation Report with respect to model copy of AgreementFile: No Deviation AFS.pdf26 Aug 2023
Declaration in FORM BFile: Affidavit_Promoter_.pdf25 Aug 2023
Layout approvalFile: Sanction Map_green tick.pdf22 Aug 2023
Building plan approvalFile: Sanction Map_green tick.pdf22 Aug 2023
PAN CardFile: Devang Developers PAN.pdf22 Aug 2023
Copy of the legal title reportFile: Search Report_.pdf22 Aug 2023
Copy of Layout Approval (in case of layout)File: Sanction Map_green tick.pdf22 Aug 2023
Building Plan Approval / NA Order for plotted developmentFile: Sanction Map_green tick.pdf22 Aug 2023
Commencement Certificates / NA Order for plotted developmentFile: BUILDING PERMISSION SANCTION.pdf22 Aug 2023

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise
ProjectLocationRegisteredStatusPromisedDelivered
RIDDHI SIDDHI HEIGHTSP50500029039DHARAMPETH EXTENSION, NagpurApr 2021CompletedMay 2023Jan 2023
MANGALMURTI RESIDENCYP50500018698NEAR AKAR ANAGAR, MOUZA : BORGAON, NAGPUR, NagpurNov 2018CompletedDec 2022Jul 2021

How this compares with Nagpur

28%of this project is bookeddistrict median 35%
13%of Nagpur projects moved their completion datethis one has not
22%of Nagpur registrations have lapsed or been cancelledthis one is completed

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep 129-RIDDHI SIDDHI HEIGHTS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MOUZA KHAMLA2,800+ in Nagpur

Builder: DEVANG DEVELOPERS LLP

DEVANG DEVELOPERS LLP has 4 registrations on MahaRERA, including MANGALMURTI RESIDENCY and RIDDHI SIDDHI HEIGHTS. Its filings disclose 2 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What are my rights if 129-RIDDHI SIDDHI HEIGHTS is delayed beyond 13 Oct 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of 129-RIDDHI SIDDHI HEIGHTS?

The registered promoter entity is DEVANG DEVELOPERS LLP, a partnership as per the filing. Its GSTIN 27AANFD9750B1ZB can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in 129-RIDDHI SIDDHI HEIGHTS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for 129-RIDDHI SIDDHI HEIGHTS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at 129-RIDDHI SIDDHI HEIGHTS?

The professionals named in the filing: Architect: MILIND NADIYANA; Engineer: MILIND NADIYANA; Engineer: Adesh Raut; Engineer: Adesh Arun Raut; Chartered Accountant: MJM ASSOCIATES; Chartered Accountant: Kumar and Jayakrishnan. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in 129-RIDDHI SIDDHI HEIGHTS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About 129-RIDDHI SIDDHI HEIGHTS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save 129-RIDDHI SIDDHI HEIGHTS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.