127 RAJ HOMES D WING

By RAJ HOMES

RG-MH-05231 · RERA P51700050415 · Last updated on MahaRERA portal: 14 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 4 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
5 of 11Construction stages donefurthest along: Staircases, 60%
99 of 197Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 90 documents Report an error

127 RAJ HOMES D WING is a Residential / Group Housing project by RAJ HOMES in Thane, Maharashtra, registered with MahaRERA as P51700050415 on 12 Apr 2023. Possession is promised by 31 Dec 2026. 98 of the 197 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete.

At a glance

Project

  • Name127 RAJ HOMES D WING
  • TypeResidential / Group Housing
  • Location
    • ABHILASHA RESIDENCY ROAD
    • PENKAR PADA (MAHAJANWADI)
    • Mira-Bhayandar (M Corp.)
    • Thane
    • 401107
  • Pincode401107
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700050415
  • ReraGenie IDRG-MH-05231

Builder

  • NameRAJ HOMES
  • Entity typePartnership
  • GSTIN27AASFR7947P1ZW
  • PartnersRAJESHKUMAR PHOOLRAJ SINGH, MUKESH JUHARMAL PARMAR
  • Other registrations4 more →
  • Completed1 of 5
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

this monthRegisteredApr 2023PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on12 Apr 2023
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed90 files

Current status

50%98 of 197 units booked
76.5%Work done, per cost certificate

Figures as on 14 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
127 RAJ HOMES D WINGNA22221970197

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 14 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 60%.

127 RAJ HOMES D WING: 55% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks60%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 14 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes80%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes50%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes90%
Electrical meter room, sub-station, receiving stationYes20%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed107

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots107
Closed/Covered1
Open Space106

Land and ownership3

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area583 sq m
Land owned byThe promoter, with other names on the file
Named landowners3
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on29 Jul 2025
LandownerVillageDistrict
POOJA BUILDERSMira-Bhayandar (M Corp.)Thane
BHOIR BUILDERS AND DEVELOPERSMira-Bhayandar (M Corp.)Thane
DARSHAN CORPORATIONBorivaliMumbai Suburban

Approvals and building plan

Sanctioning authorityMira Bhayander Municipal Corporation
Permissible FSI11579.42
Proposed, not sanctioned11,572 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchE-41 POONAM CHAMBER PHASE 3 OPP SECTOR NO 6 AND 7 SHANTI PARK MIRA ROAD EAST THANE 401107
Estimated costRs 43.50 cr
Cost incurredRs 33.30 cr
Work done76.55%
BuildingWingEstimatedIncurred
127 RAJ HOMES D WINGNARs 40.00 crRs 32.00 cr
-NARs 3.50 crRs 1.30 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMR DINANATH DESHPANDE
EngineerMAHAVIR THAKAN
EngineerJITEN PATEL
Chartered AccountantMBR & ASSOCIATES
Chartered AccountantAJAY SHAH & CO.
PartnerRole in project
RAJ HOMES-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 6 Apr 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 9 Feb 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 9 Feb 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 9 Feb 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed90

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 90 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1.pdf14 Apr 2026
Withdrawal Update Form 2File: Form 2.pdf14 Apr 2026
Withdrawal Update Form 3File: Form 3.pdf14 Apr 2026
Withdrawal Update Form 1File: Raj Homes D wing Form 1 Dec 25.pdf17 Jan 2026
Withdrawal Update Form 2File: Raj Homes D wing Form 2 Dec25.pdf17 Jan 2026
Withdrawal Update Form 3File: Raj Homes D Wing Form3 Dec 25.pdf17 Jan 2026
Withdrawal Update Form 1File: Form-1 Raj Homes D.pdf18 Oct 2025
Withdrawal Update Form 2File: Raj Homes D wing Form 2.pdf18 Oct 2025
Withdrawal Update Form 3File: Raj Homes D Form 3 Sept 25.pdf18 Oct 2025
Withdrawal Update Form 1File: Arc Raj Homes D.pdf4 Aug 2025
Withdrawal Update Form 2File: Raj Homes D wing Form 2.pdf4 Aug 2025
Withdrawal Update Form 3File: Raj Homes D wing 30062026 Form 3.pdf4 Aug 2025
Form 1File: RH D Architect.pdf19 Jul 2025
Form 2File: Eng Raj homes D.pdf19 Jul 2025
Form 3File: Form 3 Raj Homes D Wing.pdf19 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold and booked Inventory D wing.pdf19 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RH D Architect.pdf7 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Raj homes D.pdf7 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Quality Raj homes D.pdf7 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Raj Homes D Wing 31122024 - converted.pdf13 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arc Raj HomesD.pdf7 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng RH D.pdf7 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Quality RH D.pdf7 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Raj Homes D Wing FROM 3.pdf9 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arc Homes D.pdf9 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arc Homes D.pdf9 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Raj Homes D Wing FROM 3.pdf9 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Raj Homes D.pdf8 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Quality Raj Homes D.pdf8 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Raj Homes D.pdf8 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Quality Raj Homes D.pdf8 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arc Raj Homes D.pdf6 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Raj Homes D.pdf6 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Quaility Raj Homes D.pdf6 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Raj Homes D wing CA Certificate 30JUNE2024.pdf6 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: D Wing DSC.pdf6 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: wing D_RAJ Homes-2 Engineer Certificate_April 2024 dsc.pdf6 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: wing D_Raj Homes2 quality Certificate_April 2024 Dsc.pdf6 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Raj Homes D Wing Ca Certificate 31032024 - converted.pdf6 Apr 2024
Layout approvalFile: Layout Plan new.pdf9 Feb 2024
Building plan approvalFile: Plan - converted (2).pdf9 Feb 2024
Building plan approvalFile: Plan - converted (3).pdf9 Feb 2024
Building plan approvalFile: Plan - converted (4).pdf9 Feb 2024
Building plan approvalFile: Plan - converted (5).pdf9 Feb 2024
Building plan approvalFile: Plan - converted (6).pdf9 Feb 2024
Building plan approvalFile: Plan - converted (7).pdf9 Feb 2024
Copy of Layout Approval (in case of layout)File: Layout Plan new.pdf9 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: Plan - converted (2).pdf9 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: Plan - converted (3).pdf9 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: Plan - converted (4).pdf9 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: Plan - converted (5).pdf9 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: Plan - converted (6).pdf9 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: Plan - converted (7).pdf9 Feb 2024
Commencement Certificates / NA Order for plotted developmentFile: CC (2 files merged).pdf9 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 127 D Architect.pdf11 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 127 d Engineer.pdf11 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 127 D quility.pdf11 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate 31122023 D Wing.pdf6 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 127-D Architect Cert.pdf6 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 127 D Engineer Cert.pdf6 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 127- D Quality Cert.pdf6 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 127 DWing CA Certificate Form 3.pdf6 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 127 RH Engineer Certificate.pdf4 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 127 RH Architect Cert.pdf4 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 127 RH Engineer Certificate.pdf4 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 127 RH D Quality Certificate.pdf4 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 127 D Form 1CA Certificate.pdf4 Jul 2023
Copy of the legal title reportFile: Title - 5th April 2023_compressed.pdf6 Apr 2023
Proforma of Allotment letterFile: Allotment Letter.pdf16 Mar 2023
Proforma of Agreement for saleFile: Proforma Agreement for Sale.pdf16 Mar 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration - Seperate Bank Account.pdf16 Mar 2023
Deviation Report with respect to Allotment letterFile: 16032023.pdf16 Mar 2023
Deviation Report with respect to model copy of AgreementFile: Deviation in respect of Agreement compressed.pdf16 Mar 2023
Layout approvalFile: Layout Plan compressed.pdf15 Mar 2023
Building plan approvalFile: Basment and Section Plan compressed.pdf15 Mar 2023
Building plan approvalFile: Parking Plan compressed.pdf15 Mar 2023
Building plan approvalFile: Typical Foor compressed.pdf15 Mar 2023
PAN CardFile: Pan of Raj Homes.pdf15 Mar 2023
Details of encumbrances concerned to FinanceFile: Encrumbance Legal and finance.pdf15 Mar 2023
Details of encumbrances concerned to LegalFile: Encrumbance Legal and finance.pdf15 Mar 2023

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
RAJ HOMESSHOP NO. 8 & 9 B 29 DREAMLAND CHS LTD SHANTI NAGAR SECTOR 11 MIRA ROAD EAST131CompletedDec 2023Jan 2023

How this compares with Thane

50%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep 127 RAJ HOMES D WING on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near PENKAR PADA (MAHAJANWADI)7,600+ in Thane

2 km127 RAJ HOMES D WINGCompleted 29Lapsed / revoked 17Other 53Dot size: filed unitsN

Filed coordinates, straight-line distance. 99 registered projects within 2 km.

Builder: RAJ HOMES

RAJ HOMES has 5 registrations on MahaRERA, including RAJ HOMES and 127 RAJ HOMES A WING. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if 127 RAJ HOMES D WING is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of 127 RAJ HOMES D WING?

The registered promoter entity is RAJ HOMES, a partnership as per the filing. Its GSTIN 27AASFR7947P1ZW can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in 127 RAJ HOMES D WING?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for 127 RAJ HOMES D WING?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at 127 RAJ HOMES D WING?

The professionals named in the filing: Architect: MR DINANATH DESHPANDE; Engineer: MAHAVIR THAKAN; Engineer: JITEN PATEL; Chartered Accountant: MBR & ASSOCIATES; Chartered Accountant: AJAY SHAH & CO.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in 127 RAJ HOMES D WING?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About 127 RAJ HOMES D WING. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save 127 RAJ HOMES D WING to a free account