ReraGenieLog inGet a buyer report

Home / Browse projects / 118 WEST

Registered No litigation declared Residential / Group Housing project

118 WEST

By TURQUOISE DEVELOPERS

RG-MH-29918 · RERA P51900030992 · Last updated on MahaRERA portal: 14 Jul 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: .
Dec 2031Possession promisedno revision filed
11 of 11Construction stages doneevery applicable stage filed complete
44 of 68Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 176 documents Report an error

118 WEST is a Residential / Group Housing project by TURQUOISE DEVELOPERS in Agripada, Mumbai Central, 400008, registered with MahaRERA as P51900030992 on 29 Sep 2021. Possession is promised by 31 Dec 2031. 24 of the 68 units on this registration are recorded sold or booked, and 11 of 11 construction stages are filed complete.

At a glance

Project

  • Name118 WEST
  • TypeResidential / Group Housing
  • Location
    • YMCA Road
    • Agripada
    • Mumbai Central
    • 400008
  • Pincode400008
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51900030992
  • ReraGenie IDRG-MH-29918

Builder

  • NameTURQUOISE DEVELOPERS
  • Entity typePartnership
  • PartnersFarhan Iqbal Patel, Faiz Iqbal Patel

Key dates

this monthRegisteredSep 2021PromisedDec 2031

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on29 Sep 2021
  • Promised completion31 Dec 2031
  • Revised completionNone
  • Buildings1 building record
  • Documents filed176 files

Current status

35%24 of 68 units booked
96.8%Work done, per cost certificate

Figures as on 14 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
118 WESTNA211561268

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 14 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 11 construction stages are filed complete.

118 WEST: 100% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 14 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes100%

Parking filed75

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots75
Closed/Covered27
Open Space48

Land and ownership2

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area849 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on20 Jan 2026
LandownerVillageDistrict
Adnan Masud Shiakh-Mumbai City
Yasmin Masud Shaikh-Mumbai City

Approvals and building plan

Sanctioning authorityMHADA
Permissible FSI5731.02
Proposed, not sanctioned5,731 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGround Floor Apsara Multiplex Dr B D Marg Grant Road East
Estimated costRs 20.17 cr
Cost incurredRs 19.52 cr
Work done96.79%
BuildingWingEstimatedIncurred
118 WESTNARs 11.65 crRs 11.65 cr
-NARs 8.52 crRs 7.87 cr

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAbdul Sattar Abdul Gani Shaikh Shaikh
EngineerShaikh Shahid Hasnain
Chartered AccountantAftab Alam
PartnerRole in project
TURQUOISE DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 20 Sep 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 20 Sep 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 30 Aug 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 30 Aug 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2031

Documents filed176

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 176 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: TD Form 1 ARCH 12th May 2026.pdf14 Jul 2026
Withdrawal Update Form 2File: 31-03-26 Engg TD.pdf14 Jul 2026
Withdrawal Update Form 3File: TD Form 3 12th May 2026.pdf14 Jul 2026
Withdrawal Update Form 1File: 31-03-26 Architect TD.pdf1 May 2026
Withdrawal Update Form 2File: 31-03-26 Engg TD.pdf1 May 2026
Withdrawal Update Form 3File: 31-03-26 FORM 3 TD.pdf1 May 2026
Form 2A (FY 2025-2026)File: 31-03-26 2A TD.pdf1 May 2026
Form 2A (FY 2024-2025)File: 31-03-2025 Form 2A Eng Pending.pdf1 May 2026
Form 2A (FY 2023-2024)File: 31-03-2024 Form 2A Eng.pdf1 May 2026
Form 2A (FY 2022-2023)File: 31-03-23 Form 2A Eng.pdf1 May 2026
Form 2A (FY 2021-2022)File: 31-03-22 Form 2A Eng.pdf1 May 2026
Form 5 (FY 2024-2025)File: Form 5 2024-25_TD Signed.pdf1 May 2026
Withdrawal Update Form 1File: 30-09-25 Architect.pdf20 Jan 2026
Withdrawal Update Form 1File: 30-09-25 Architect.pdf20 Jan 2026
Withdrawal Update Form 1File: 30-09-25 Architect.pdf20 Jan 2026
Withdrawal Update Form 1File: 30-09-25 Architect.pdf20 Jan 2026
Withdrawal Update Form 1File: 31-12-25 Form 1 Arc TD.pdf20 Jan 2026
Withdrawal Update Form 2File: 30-09-25 Form 2 Eng Pending.pdf20 Jan 2026
Withdrawal Update Form 2File: 30-09-25 Form 2 Eng Pending.pdf20 Jan 2026
Withdrawal Update Form 2File: 30-09-25 Form 2 Eng Pending.pdf20 Jan 2026
Withdrawal Update Form 2File: 30-09-25 Form 2 Eng Pending.pdf20 Jan 2026
Withdrawal Update Form 2File: 31-12-25 Form 2 Eng TD.pdf20 Jan 2026
Withdrawal Update Form 3File: Q-2 FY 2025-26 Signed Pending.pdf20 Jan 2026
Withdrawal Update Form 3File: Q-2 FY 2025-26 Signed Pending.pdf20 Jan 2026
Withdrawal Update Form 3File: Q-2 FY 2025-26 Signed Pending.pdf20 Jan 2026
Withdrawal Update Form 3File: Q-2 FY 2025-26 Signed Pending.pdf20 Jan 2026
Withdrawal Update Form 3File: 31-12-25 Form 3 TD.pdf20 Jan 2026
Withdrawal Update Form 1File: 30-09-25 Architect.pdf17 Jan 2026
Withdrawal Update Form 1File: 30-09-25 Architect.pdf17 Jan 2026
Withdrawal Update Form 1File: 30-09-25 Architect.pdf17 Jan 2026
Withdrawal Update Form 1File: 30-09-25 Architect.pdf17 Jan 2026
Withdrawal Update Form 2File: 30-09-25 Form 2 Eng Pending.pdf17 Jan 2026
Withdrawal Update Form 2File: 30-09-25 Form 2 Eng Pending.pdf17 Jan 2026
Withdrawal Update Form 2File: 30-09-25 Form 2 Eng Pending.pdf17 Jan 2026
Withdrawal Update Form 2File: 30-09-25 Form 2 Eng Pending.pdf17 Jan 2026
Withdrawal Update Form 3File: Q-2 FY 2025-26 Signed Pending.pdf17 Jan 2026
Withdrawal Update Form 3File: Q-2 FY 2025-26 Signed Pending.pdf17 Jan 2026
Withdrawal Update Form 3File: Q-2 FY 2025-26 Signed Pending.pdf17 Jan 2026
Withdrawal Update Form 3File: Q-2 FY 2025-26 Signed Pending.pdf17 Jan 2026
Form 1File: 30-06-23 Architect.pdf18 Dec 2025
Form 2File: 30-06-23 Form 2 Eng.pdf18 Dec 2025
Form 3File: Q-1 FY 2023-24 Signed.pdf18 Dec 2025
Disclosure of Sold and Booked InventoryFile: Q-1 FY 2023-24 Signed Sold.pdf18 Dec 2025
Form 1File: 30-09-23 Architect.pdf18 Dec 2025
Form 2File: 30-09-23 Form 2 Eng.pdf18 Dec 2025
Form 3File: Q-3 FY 2023-24 Signed.pdf18 Dec 2025
Disclosure of Sold and Booked InventoryFile: Q-3 FY 2023-24 Sold.pdf18 Dec 2025
Form 1File: 31-12-23 Architect.pdf18 Dec 2025
Form 2File: 31-12-23 Form 2 Eng.pdf18 Dec 2025
Form 3File: Q-3 FY 2023-24 Signed.pdf18 Dec 2025
Disclosure of Sold and Booked InventoryFile: Q-3 FY 2023-24 Sold.pdf18 Dec 2025
Form 1File: 31-03-24 Architect.pdf18 Dec 2025
Form 2File: 31-03-24 Form 2 Eng.pdf18 Dec 2025
Form 3File: Q-4 FY 2023-24 Signed.pdf18 Dec 2025
Disclosure of Sold and Booked InventoryFile: Q-4 FY 2023-24 Sold.pdf18 Dec 2025
Form 1File: 30-06-24 Architect.pdf18 Dec 2025
Form 2File: 30-06-24 Form 2 Eng.pdf18 Dec 2025
Form 3File: Q-1 FY 2024-25 Signed.pdf18 Dec 2025
Disclosure of Sold and Booked InventoryFile: Q-1 FY 2024-25 Sold.pdf18 Dec 2025
Form 1File: 30-09-24 Architect.pdf18 Dec 2025
Form 2File: 30-09-24 Form 2 Eng.pdf18 Dec 2025
Form 3File: Q-2 FY 2024-25 Signed.pdf18 Dec 2025
Disclosure of Sold and Booked InventoryFile: Q-2 FY 2024-25 Sold.pdf18 Dec 2025
Form 1File: 31-12-24 Architect.pdf18 Dec 2025
Form 2File: 31-12-24 Form 2 Eng.pdf18 Dec 2025
Form 3File: Q-3 FY 2024-25 Signed.pdf18 Dec 2025
Disclosure of Sold and Booked InventoryFile: Q-3 FY 2024-25 Sold.pdf18 Dec 2025
Withdrawal Update Form 1File: 30-09-25 Architect.pdf18 Dec 2025
Withdrawal Update Form 2File: 30-09-25 Form 2 Eng Pending.pdf18 Dec 2025
Withdrawal Update Form 3File: Q-2 FY 2025-26 Signed Pending.pdf18 Dec 2025
Form 1File: 30-09-21 Architect.pdf17 Dec 2025
Form 2File: 30-09-21 Form 2 Eng.pdf17 Dec 2025
Form 3File: Q-2 FY 2021-22 Signed.pdf17 Dec 2025
Disclosure of Sold and Booked InventoryFile: Q-2 FY 2021-22 Sold.pdf17 Dec 2025
Form 1File: 31-12-21 Architect.pdf17 Dec 2025
Form 2File: 31-12-21 Form 2 Eng.pdf17 Dec 2025
Form 3File: Q-3 FY 2021-22 Signed.pdf17 Dec 2025
Disclosure of Sold and Booked InventoryFile: Q-3 FY 2021-22 Sold.pdf17 Dec 2025
Form 1File: 31-03-22 Architect.pdf17 Dec 2025
Form 2File: 31-03-22 Form 2 Eng.pdf17 Dec 2025

Keep 118 WEST on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Agripada, Mumbai Central

Builder: TURQUOISE DEVELOPERS

TURQUOISE DEVELOPERS has 1 registration on MahaRERA, including 118 WEST. Its filings disclose no earlier MahaRERA projects. Read the full track record.

Frequently asked questions

What are my rights if 118 WEST is delayed beyond 31 Dec 2031?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of 118 WEST?

The registered promoter entity is TURQUOISE DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in 118 WEST?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for 118 WEST?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at 118 WEST?

The professionals named in the filing: Architect: Abdul Sattar Abdul Gani Shaikh Shaikh; Engineer: Shaikh Shahid Hasnain; Chartered Accountant: Aftab Alam. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in 118 WEST?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About 118 WEST. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save 118 WEST to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.