ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / 10 Square

Registered No litigation declared Residential / Group Housing project

10 Square

By Nitin T Patil

RG-MH-32534 · RERA P52100080351 · Last updated on MahaRERA portal: 2 May 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
0 of 11Construction stages donefurthest along: Excavation, 0%
0Complaints at MahaRERAon this registration
Jump to the 30 documents Report an error

10 Square is a Residential / Group Housing project by Nitin T Patil in Pune, Maharashtra, registered with MahaRERA as P52100080351 on 26 May 2025. Possession is promised by 31 Dec 2026.

At a glance

Project

  • Name10 Square
  • TypeResidential / Group Housing
  • Location
    • BRT Road
    • Near Bhondve Petrol Pump
    • Pratap Nagar
    • Ravet
    • Haveli
    • Pune
    • 411033
  • Pincode411033
  • RERA no.P52100080351
  • ReraGenie IDRG-MH-32534

Builder

  • NameNitin T Patil
  • Entity typeIndividual

Key dates

this monthRegisteredMay 2025PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on26 May 2025
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed30 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
10 SquareNA50000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 2 May 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 0%.

10 Square: 0% average across the applicable activities

ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 2 May 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed22

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots22
Closed/Covered11
Open Space11

Land and ownership9

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area700 sq m
Land owned byThe promoter, with other names on the file
Named landowners9
LandownerVillageDistrict
Vinod Ashok MahajanRavetPune
Shobha Narayan PatilRavetPune
Rajendra Ashok MahajanRavetPune
Sagar Krushna DhandeRavetPune
Rashmi Sagar DhandeRavetPune
Ramesh Jagannath PatilRavetPune
Mahesh Vasantrao KapureRavetPune
Vilas Prakash ChaudhariRavetPune
Arun Ashok PatilRavetPune

Approvals and building plan

Permissible FSI6228.5
Proposed, not sanctioned1,228 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchICICI Bank Ltd, Shop No 1 Part Ballina, Sector No 29, Plot SDC 2, Ravet, Pune 412101

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPatil & Bugade Associates
EngineerSankalpsiddhi Consultants
Chartered AccountantR H Pothiwal & Associates
PartnerRole in project
Nitin T Patil-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 23 Apr 2025
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 23 Apr 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 23 Apr 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 23 Apr 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed30

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Archietect Letter_compressed.pdf2 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate 10 Square_compressed.pdf2 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 02.pdf2 May 2025
Other - FinanceFile: Landowner declaration.pdf2 May 2025
Layout approvalFile: Revised sanction layout plan _compressed.pdf23 Apr 2025
Building plan approvalFile: Revised sanction layout plan _compressed.pdf23 Apr 2025
Building plan approvalFile: Revised plan section elevation sheet_compressed.pdf23 Apr 2025
Copy of the legal title reportFile: ACE Scanner_2025_04_19.pdf23 Apr 2025
Copy of the legal title reportFile: Search Report_compressed.pdf23 Apr 2025
Details of encumbrances concerned to FinanceFile: Details of encumbrances concerned to Finance.pdf23 Apr 2025
Details of encumbrances concerned to FinanceFile: Details of encumbrances concerned to Legal.pdf23 Apr 2025
Copy of Layout Approval (in case of layout)File: Revised sanction layout plan _compressed.pdf23 Apr 2025
Proforma of Allotment letterFile: Allotment Letter.pdf23 Apr 2025
Declaration in FORM BFile: Developer Form B_compressed.pdf23 Apr 2025
Commencement Certificates / NA Order for plotted developmentFile: revised commencement.pdf23 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: Revised plan section elevation sheet_compressed.pdf23 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: Revised sanction layout plan _compressed.pdf23 Apr 2025
Declaration about Commencement CertificateFile: Format D.pdf23 Apr 2025
CERSAI detailsFile: Declaration-Nil-CERSAI Report.pdf23 Apr 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: Format A.pdf23 Apr 2025
Deviation Report with respect to Allotment letterFile: Deviation of Allotment Letter.pdf23 Apr 2025
Details of encumbrances concerned to LegalFile: Details of encumbrances concerned to Finance.pdf23 Apr 2025
Details of encumbrances concerned to LegalFile: Details of encumbrances concerned to Legal.pdf23 Apr 2025
Other - TechnicalFile: Declaration of One Plot One Registration.pdf23 Apr 2025
Deviation Report with respect to model copy of AgreementFile: Deviation for AFS.pdf23 Apr 2025
Proforma of Agreement for saleFile: AFS.pdf23 Apr 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in Other Real Estate Organizations.pdf23 Apr 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format B.pdf23 Apr 2025
Disclosure for secured/unsecured finance availed for the projectFile: Disclosure for secured unsecured finance availed for the project.pdf23 Apr 2025
PAN CardFile: Pancard NITIN.pdf28 Jan 2025

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep 10 Square on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Near Bhondve Petrol Pump, Pratap Nagar13,700+ in Pune

Builder: Nitin T Patil

Nitin T Patil has 1 registration on MahaRERA, including 10 Square. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if 10 Square is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of 10 Square?

The registered promoter entity is Nitin T Patil, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in 10 Square?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for 10 Square?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at 10 Square?

The professionals named in the filing: Architect: Patil & Bugade Associates; Engineer: Sankalpsiddhi Consultants; Chartered Accountant: R H Pothiwal & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in 10 Square?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About 10 Square. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save 10 Square to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.