New projects and RERA data in Jalgaon district, Maharashtra

234 projects are registered in Jalgaon district: 2,067 units across them, 1 registered in the last 12 months. Sales and inventory trends accumulate from each future quarterly update; this page shows the first one.

234Projects covered
1Registered, last 12 months
2,067Units declared
1,585Units not yet booked
12Completion dates revised
0With declared litigation

Of the 234 covered registrations, 12 have revised their promised completion date and 0 declare litigation. The median project here is 21% booked as of the current data. Every figure comes from the projects' own MahaRERA filings.

Also free on ReraGenie: a monthly RERA report for the seven biggest markets in Maharashtra (Pune, Mumbai, Thane, Navi Mumbai, Nagpur, Nashik and Vasai-Virar): what registered that month, the possession pipeline and the busiest pincodes, from the filings. See the latest editions.

When Jalgaon projects promise possession

Promised possession year as filed by the builder with MahaRERA, split by what the registration says today. Of 234 projects with a promised date, 133 are recorded delivered, 26 are still on the register and 75 have a registration that has lapsed or been cancelled.

DeliveredOn the registerRegistration lapsed or cancelled

012253750today2017: 9 projects, delivered’172018: 11 projects, delivered’182019: 13 projects, delivered2019: 3 projects, registration lapsed or cancelled’192020: 11 projects, delivered2020: 4 projects, registration lapsed or cancelled’202021: 10 projects, delivered2021: 3 projects, registration lapsed or cancelled’212022: 20 projects, delivered2022: 13 projects, registration lapsed or cancelled’222023: 27 projects, delivered2023: 20 projects, registration lapsed or cancelled’232024: 11 projects, delivered2024: 11 projects, registration lapsed or cancelled’242025: 10 projects, delivered2025: 11 projects, registration lapsed or cancelled’252026: 4 projects, delivered2026: 11 projects, on the register2026: 10 projects, registration lapsed or cancelled’262027: 3 projects, delivered2027: 8 projects, on the register’272028: 1 projects, delivered2028: 4 projects, on the register’282029: 2 projects, delivered2029: 1 projects, on the register’292030: 1 projects, delivered2030: 1 projects, on the register’302032: 1 projects, on the register’32

47 projects promise possession in 2026 or later. Facts as per filings on RERA website.

02505007501,000today2017: 20 flats, delivered (only 1 of 9 projects filed a flat count)’172018: 26 flats, delivered (only 1 of 11 projects filed a flat count)’18’19’202021: 88 flats, delivered (only 1 of 13 projects filed a flat count)’21’222023: 103 flats, delivered (only 4 of 47 projects filed a flat count)2023: 49 flats, registration lapsed or cancelled (only 4 of 47 projects filed a flat count)’23’242025: 32 flats, registration lapsed or cancelled (only 2 of 21 projects filed a flat count)’252026: 130 flats, delivered (only 12 of 25 projects filed a flat count)2026: 504 flats, on the register (only 12 of 25 projects filed a flat count)2026: 190 flats, registration lapsed or cancelled (only 12 of 25 projects filed a flat count)’262027: 161 flats, delivered2027: 99 flats, on the register’272028: 228 flats, on the register (only 2 of 5 projects filed a flat count)’282029: 197 flats, delivered2029: 27 flats, on the register’292030: 206 flats, on the register’302032: 7 flats, on the register’32

1,749 flats are promised in 2026 or later, across the 51% of those projects that file a flat count. Hatched years are ones where most builders never filed a count, so the bar understates real supply and cannot be compared with the years beside it. Facts as per filings on RERA website.

How far Jalgaon possession dates have moved

Builders may revise the possession date they filed at registration. Each bar is the year a project first promised, split by how far that date has since moved. 12 of 234 projects (5%) have moved at least once; the median move is 12 months and the longest is 60 months.

Kept the original dateMoved by under 2 yearsMoved by 2 years or more

012253750Originally due 2017: 9 projects kept the original date, 90% of the yearOriginally due 2017: 1 projects moved by under 2 years, 10% of the year’17Originally due 2018: 10 projects kept the original date, 100% of the year’18Originally due 2019: 16 projects kept the original date, 84% of the yearOriginally due 2019: 3 projects moved by under 2 years, 16% of the year’19Originally due 2020: 13 projects kept the original date, 100% of the year’20Originally due 2021: 11 projects kept the original date, 92% of the yearOriginally due 2021: 1 projects moved by under 2 years, 8% of the year’21Originally due 2022: 33 projects kept the original date, 94% of the yearOriginally due 2022: 1 projects moved by under 2 years, 3% of the yearOriginally due 2022: 1 projects moved by 2 years or more, 3% of the year’22Originally due 2023: 46 projects kept the original date, 96% of the yearOriginally due 2023: 2 projects moved by 2 years or more, 4% of the year’23Originally due 2024: 22 projects kept the original date, 96% of the yearOriginally due 2024: 1 projects moved by 2 years or more, 4% of the year’24Originally due 2025: 21 projects kept the original date, 91% of the yearOriginally due 2025: 2 projects moved by under 2 years, 9% of the year’25Originally due 2026: 22 projects kept the original date, 100% of the year’26Originally due 2027: 9 projects kept the original date, 100% of the year’27Originally due 2028: 4 projects kept the original date, 100% of the year’28Originally due 2029: 3 projects kept the original date, 100% of the year’29Originally due 2030: 2 projects kept the original date, 100% of the year’30Originally due 2032: 1 projects kept the original date, 100% of the year’32

Read down a bar to see how much of that year's cohort held its promise. Facts as per filings on RERA website.

0125250375500Originally due 2017: 20 flats kept the original date, 90% of the year (only 2 of 10 projects filed a flat count)Originally due 2017: 26 flats moved by under 2 years, 10% of the year (only 2 of 10 projects filed a flat count)’17’18’19’20Originally due 2021: 88 flats kept the original date, 92% of the year (only 1 of 12 projects filed a flat count)’21Originally due 2022: 21 flats moved by 2 years or more, 3% of the year (only 1 of 35 projects filed a flat count)’22Originally due 2023: 152 flats kept the original date, 96% of the year (only 4 of 48 projects filed a flat count)’23Originally due 2024: 163 flats moved by 2 years or more, 4% of the year (only 1 of 23 projects filed a flat count)’24Originally due 2025: 32 flats kept the original date, 91% of the year (only 4 of 23 projects filed a flat count)Originally due 2025: 226 flats moved by under 2 years, 9% of the year (only 4 of 23 projects filed a flat count)’25Originally due 2026: 435 flats kept the original date, 100% of the year (only 9 of 22 projects filed a flat count)’26Originally due 2027: 239 flats kept the original date, 100% of the year’27Originally due 2028: 228 flats kept the original date, 100% of the year’28Originally due 2029: 224 flats kept the original date, 100% of the year’29Originally due 2030: 206 flats kept the original date, 100% of the year’30Originally due 2032: 7 flats kept the original date, 100% of the year’32

Hatched years are ones where most builders never filed a flat count, so the bar understates the real total. Read down a bar to see how much of that year's cohort held its promise. Facts as per filings on RERA website.

Permissions and land in Jalgaon

Who sanctions building in Jalgaon

35 of the 234 registrations on this page name the body that sanctioned their building plan. The rest leave that box empty, which is a gap in the filing and not a project without permission: the commencement certificate is filed as a separate document and is on the file for most projects. The body named here is where a commencement or occupancy certificate is verified.

Sanctioning authorityProjects
Jalgaon Municipal Corporation10
BHUSAWAL MUNICIPAL COUNCIL4
MHADA3
PACHORA NAGARPARISHAD, PACHORA3
Jalgaon Municipal Council2
13 other bodies13

One body is often filed under several spellings, and those are counted together. Acronyms that could mean two different bodies are not: PMC is Pune or Pimpri Chinchwad depending who typed it, so it is counted as filed.

Whose name the land is in

Every one of the 234 registrations on this page answers this: on 170 the promoter is the only owner named; on 63 the promoter is an owner with other names on the file, which is what a joint development looks like on paper; on 1 the promoter is not an owner. Where other names are on the file, ask which of them signs your agreement for sale. A landowner who is not a party to it is a question for your lawyer before you pay, not a defect in the project.

Where in Jalgaon: projects by taluka

234 of the 234 registrations on this page name their taluka.

TalukaProjectsShare
Jalgaon12051%
Bhusawal3615%
Chalisgaon229%
Pachora198%
Amalner146%
Chopda125%
5 other talukas115%

Projects in Jalgaon

Showing 1 to 60 of 234 projects.

Largest first, by the unit count in the filing.

ProjectDeveloperUnitsBookedRegisteredStatus
PPRL Basera - JaynagarBodwad, 425310Vinaykumar Uttamchand Parakh21418%27 Mar 2023Registered
ADITYA GOLD CITYSHIVAR KHEDI BUDRUK, MIDC AREA, 425003ADITYA BUILDERS AND DEVELOPERS20640%16 Dec 2019Registered
Chhoriya Fortune City -Parola plottingBus Stand, 425111ANMOL CHHORIYA AND ASSOCIATES19747%18 May 2022Completed
KRUSHNAJI ARCADESAMBHAJI CHOWK, 424201M/S. SHREYASH REALTIES1900%15 Apr 2024Registered
SSD ComplexChalisgaon, 424101Jay Narayan Developers1637%9 May 2023Registered
B M RAVAL PLAZARAVAL GINNING FACTORY, 424201DUSHYANT PRAVINSAGAR RAVAL15111%31 Aug 2017Registration lapsed
SUKRUTI SURATNANEAR SUKRUTI DREAMHOMES, JALGAON, 425001SURATNA INFRA LLP13243%21 Aug 2023Completed
Mundada High StreetAmalner, 425401Mundada Realty12921%31 Jan 2024Completed
MAHARANA PRATAP SAHKARI GRUH NIRMAN SANSTHA LIMITEDChalisgaon, 424101MAHARANA PRATAP SAHKARI GRUH NIRMAN SANSTHA LIMITED8836%6 Aug 2017Completed
MUNDADA ESTATEAmalner, 425401AMEY OMPRAKASH MUNDADA780%30 Aug 2021Completed
One High StreetMIDC, 425003Ashtavinayak Enterprises500%3 Oct 2025Registered
JK EleganceGanpati Nagar, 425001JK Elegance4439%13 Nov 2024Registered
GAURI NANDAN APARTMENTMOUJE SATARE, 425201PATIL MAHAJAN380%15 May 2026Registered
SHIV MAAN HEIGHTSJULALSING WADI, 425001JAIN INFRA3832%8 Jun 2023Registration lapsed
MANNAT HEIGHTSDIVISION JALGAON SHIWAR, 425001AJAY SHANTILAL LALWANI3336%2 Feb 2018Registration lapsed
LAXMI HEIGHTSAt Satare Shivar, 425201PRAJAKT SHIVAJI PATIL290%29 Oct 2024Completed
SAMARTHS SUVRUDDHIADARSH NAGAR MEHRUN, 425001Samarth Constrowell Private Limited270%10 Dec 2024Registered
ANTARIKSHMEHRUN LAKE AREA, 425001SUMEET PRAKASHCHAND MUTHA2612%21 May 2024Registered
RESIDENTIAL LAYOUT G NO 1135Chopda (M Cl), 425107ANIL SUBHAN PATIL260%31 Aug 2017Completed
PANCHAVATI PALACEBHUSAWAL, 425201CHINTAMANI CONSTRUCTION2580%26 Jun 2019Completed
Krushna HeightsChalisgaon, 424101M/s Shree Swami Samarth Traders Builders and Developrs240%31 Jan 2025Registration lapsed
SAI DHAMIN FRONT OF VIVEKANAND ENGLISH MEDIUM SCHOOL, 425002JB ASSOCIATES2421%1 Oct 2021Registered
ADITYA HEIGHTSVIVEKANAND NAGAR, 424201MAYURI MUKUND BILDIKAR2162%9 Jul 2020Registered
DESHMUKH NAGARKhadaki Bk., 424101SANGITA PRASHANT DESHMUKH2020%9 Nov 2017Completed
CASA DE ROYALEBhusawal, 425201Raka Constructions1937%24 Jan 2025Registered
RAMAI KESHAV VIHAR PHASE-1BHUSAWAL, 425201VISHAL RAJENDRA NATKAR1694%10 Feb 2020Registration lapsed
MAJESTIQUE LANDMARKMEHRUN SHIVAR, 425001ORNATE PROPERTIES1553%10 Jul 2024Registered
Mixed with All 1 May435, 423412Rupal as Public Authority1533%2 May 2025Registered
OM RESIDENCYOPP SWADHYA BHAWAN JALGAON, 425001JALGAON PROJECTS PVT LTD120%6 May 2024Registered
Gokuldas HousingIndiratai Nagar, 425107Gokuldas Housing825%6 Mar 2023Registration lapsed
BHARAT NAGARBHADGAON, 424105JAKIRKHAN YASINKHAN QURESHI743%2 Mar 2021Registered
SAI CHARAN RESIDENCYAt Meharun Shivar, 425001N & L ASSOCIATES10%21 Jun 2024Registration lapsed
VARAD HEIGHTSVivekanand Nagar, 425002Toke And Dhake Associates10%5 Oct 2021Completed
Aanand-Krishnadhule road, 424101SHREE SWAMI SAMARTH TRADERS BUILDERS AND DEVELOPERS--26 Mar 2018Completed
AAROHI HEIGHTSNIMKHEDI KD, 425001PIYUSH ASHOK BEDMUTHA--14 Mar 2022Registration lapsed
ADITYA PLAZAJalgaon, 425001CREATIVE BUILDERS--15 Dec 2017Registration lapsed
AJINKYATARA APPARTMENTAT POST CHALISGAON, 424101RAKESH BHIMRAO BORSE--9 Aug 2024Registration lapsed
AKSHYA PLAZA0, 424101YASHASHRI BUILDCON COMPANY--1 Oct 2019Registration lapsed
ANVIKA ARCADEJALGAON, 425001KAILASH VINAYAK KASAR--28 Apr 2023Registration lapsed
ARIHANNT SAPPHIREJALGAON, 425001ARIHANNT SAPPHIRE--28 Apr 2022Registration lapsed
ASHA HEIGHTS B WINGBHUSAWAL, 425201AKHLAK ISMAIL TELI--21 Sep 2018Registration lapsed
Ashirwad Dream City Phase 2Near Gajanan Maharaj Mandir, 424201MAYURI MUKUND BILDIKAR--23 Jan 2018Registered
ASHIRWAD DREAM FLOWERPachora (M Cl), 424201MAYURI MUKUND BILDIKAR--31 Aug 2017Registration lapsed
ASHIRWAD PLAZATongaon, 424105THE CREATIVE ASSOCIATES--1 Sep 2017Registration lapsed
AYAN HEIGHTSBHUSAWAL, 425201MOHAMMADAMIMN MOHAMMADNASAR QURESHI--2 Jan 2018Registration lapsed
Behede Deshpande Complexchopda, 425107Behede & Deshpande Group--20 Dec 2019Completed
BHAGAVANTI HEIGHTSMehrun Shivar, 425001SHIV GAJANAN CONSTRUCTION--24 Jan 2023Completed
C S COMPLEX AND RESIDENCYNEAR PETROL PUMP, 425201JAHID CHIRAG SHAIKH--11 Oct 2021Registration lapsed
COMMERCIAL COMPLEX ON PLOT NO 92 TO 95Neri Bk., 424104Suresh Gyanchand Haswani--22 Aug 2017Completed
Construction of 30 HIG T/s. on plots of S. No. 299/1C and 299/2 at Sakegaon, Bhusawal, Dist. JalgaonSakegaon, 425201Nashik Housing And Area Development Board--31 Aug 2017Registration lapsed
Construction of 33 Ts MIG on S. No. 300/1 B at Sakegaon, Bhusawal, Dist. JalgaonSakegaon, 425201Nashik Housing And Area Development Board--17 Aug 2017Completed
COOL HOMESBHUSAWAL, 425201SAVITA SHIVAJI PATIL--2 Jan 2018Completed
DESHMUKH SANKULCHOPDA, 425107SAGAR UMAKANT DESHMUKH--28 Jun 2019Registration lapsed
DEV HEIGHTSJALGAON, 425001DNYANDEV VASANT KALE--23 Jun 2023De-registered
DEVAKINANDAN RESIDENCYPUNGAON, 424201THEPADE BUILDERS--31 Oct 2021Registration lapsed
DWARKAIBESIDE VATIKA ASHRAM, 425001MURLIDHAR RAJARAM MAHAJAN--21 Jun 2019Completed
Ekdant ResidencyPACHORA, 424201Shri. Morya Construction--21 Oct 2020Registration lapsed
EXOTICAJALGAON, 425001KMP BUILDERS--11 Aug 2017Completed
Ganesh DelightJalgaon (M Corp.), 425001Gurudatta Global Developers--21 Sep 2017Completed
Ganesha Chaitanyanear gov.Engg collage, 425001deepak prakash saraf--29 May 2020Completed
Planning a launch in Jalgaon? The area market report packs one pincode's whole filed market into one document: every registration and what it has become, when the active stock promises to land, what the market absorbs, the operators and who finances them. A flat Rs 2,999 per pincode. Area report · Rs 2,999  Read a full sample

Developers active in Jalgaon

PATIL MAHAJAN (4), SHREE N T MUNDADA PARK (4), MAYURI MUKUND BILDIKAR (3), VISHAL RAJENDRA NATKAR (3), THEPADE BUILDERS (3), SAGAR PANDIT TADE (3). Each link opens the promoter's track record built from their own filings.

Frequently asked questions

How do I shortlist among the Jalgaon projects listed above?

Compare each project against its neighbours, not against the brochure. The median project on this page is 21% booked, which is the benchmark to hold any single project against. A project selling much slower than the district may have a pricing or credibility problem; one selling much faster deserves a look at whether construction is keeping pace with collections. Then open the developer link to check their delivery record on other projects, and compare filed carpet areas rather than super built-up marketing areas.

What does a revised completion date on a Jalgaon project actually mean?

The promoter has moved their deadline with the regulator, usually under section 6, which allows an extension of up to one year for reasons beyond their control. It does not move the date in your agreement for sale: your section 18 claim for delay interest or refund runs from the possession date you signed for. Before booking a project with a revision on record, ask which approvals or works the new date depends on.

What stamp duty will I pay on a flat in Jalgaon district?

The rate depends on the local body: roughly 6 to 7 percent inside municipal corporations, 4 percent in municipal council areas and 3 percent in gram panchayat areas, with women buying in their sole name paying 1 percent less. The registration fee is 1 percent of value, capped at Rs 30,000. Duty is charged on the higher of your agreement value and the ready reckoner value. ReraGenie has a free Maharashtra stamp duty calculator under Tools.

What does it mean that some Jalgaon registrations have lapsed?

A RERA registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then, the registration lapses and the project stops being a registered project: the promoter may not legally market or sell in it, and the Authority can act under section 7 against a defaulting promoter. It does not cancel your agreement for sale or your section 18 rights if you have already booked, and it does not mean construction has stopped. Ask the promoter for the current registration position in writing, and verify it on the MahaRERA portal before you pay any further instalment.

What if a Jalgaon project shows strong sales but slow construction?

That shape means the promoter is collecting money faster than they are building, which is fine under a disciplined promoter and dangerous under a stretched one. The law helps: withdrawals from the project account need architect, engineer and CA certificates in proportion to progress. Check the promoter's delivery record, and watch the next quarterly filing (due within 20 days of each quarter end) to see whether the construction line moves.

Does something here look wrong, or is there a number you expected to find and did not? Every figure on this page is summed from the projects' own MahaRERA filings, and we read every report.

Report an errorShare feedback

Data from official MahaRERA filings.

Report an error or share feedback

About Jalgaon district. Every figure on this page is summed from the projects' own filings, so if a number looks wrong it helps to say which one.