ReraGenieLog inGet a buyer report

Home / Areas / Jalgaon

New projects and RERA data in Jalgaon district, Maharashtra

234 of the projects in this build are in Jalgaon district: 2,067 units across them, 2 registered in the last 12 months. Sales and inventory trends accumulate from each future quarterly update; this page shows the first one.

234Projects in this build
2Registered, last 12 months
2,067Units declared
1,595Units not yet booked
12Completion dates revised
0With declared litigation

Of the 234 covered registrations, 12 have revised their promised completion date and 0 declare litigation. The median project here is 21% booked as of the current data. Every figure comes from the projects' own MahaRERA filings.

When Jalgaon projects promise possession

Promised possession year as filed by the builder with MahaRERA, split by what the registration says today. Of 234 projects with a promised date, 133 are recorded delivered, 26 are still on the register and 75 have a registration that has lapsed or been cancelled.

DeliveredOn the registerRegistration lapsed or cancelled

012253750today2017: 9 projects, delivered’172018: 11 projects, delivered’182019: 13 projects, delivered2019: 3 projects, registration lapsed or cancelled’192020: 11 projects, delivered2020: 4 projects, registration lapsed or cancelled’202021: 10 projects, delivered2021: 3 projects, registration lapsed or cancelled’212022: 20 projects, delivered2022: 13 projects, registration lapsed or cancelled’222023: 27 projects, delivered2023: 20 projects, registration lapsed or cancelled’232024: 11 projects, delivered2024: 11 projects, registration lapsed or cancelled’242025: 10 projects, delivered2025: 11 projects, registration lapsed or cancelled’252026: 4 projects, delivered2026: 11 projects, on the register2026: 10 projects, registration lapsed or cancelled’262027: 3 projects, delivered2027: 8 projects, on the register’272028: 1 projects, delivered2028: 4 projects, on the register’282029: 2 projects, delivered2029: 1 projects, on the register’292030: 1 projects, delivered2030: 1 projects, on the register’302032: 1 projects, on the register’32

47 projects promise possession in 2026 or later. Facts as per filings on RERA website.

02505007501,000today2017: 20 flats, delivered (only 1 of 9 projects filed a flat count)’172018: 26 flats, delivered (only 1 of 11 projects filed a flat count)’18’19’202021: 88 flats, delivered (only 1 of 13 projects filed a flat count)’21’222023: 103 flats, delivered (only 4 of 47 projects filed a flat count)2023: 49 flats, registration lapsed or cancelled (only 4 of 47 projects filed a flat count)’23’242025: 32 flats, registration lapsed or cancelled (only 2 of 21 projects filed a flat count)’252026: 130 flats, delivered (only 12 of 25 projects filed a flat count)2026: 504 flats, on the register (only 12 of 25 projects filed a flat count)2026: 190 flats, registration lapsed or cancelled (only 12 of 25 projects filed a flat count)’262027: 161 flats, delivered2027: 99 flats, on the register’272028: 228 flats, on the register (only 2 of 5 projects filed a flat count)’282029: 197 flats, delivered2029: 27 flats, on the register’292030: 206 flats, on the register’302032: 7 flats, on the register’32

1,749 flats are promised in 2026 or later, across the 51% of those projects that file a flat count. Hatched years are ones where most builders never filed a count, so the bar understates real supply and cannot be compared with the years beside it. Facts as per filings on RERA website.

How far Jalgaon possession dates have moved

Builders may revise the possession date they filed at registration. Each bar is the year a project first promised, split by how far that date has since moved. 12 of 234 projects (5%) have moved at least once; the median move is 12 months and the longest is 60 months.

Kept the original dateMoved by under 2 yearsMoved by 2 years or more

012253750Originally due 2017: 9 projects kept the original date, 90% of the yearOriginally due 2017: 1 projects moved by under 2 years, 10% of the year’17Originally due 2018: 10 projects kept the original date, 100% of the year’18Originally due 2019: 16 projects kept the original date, 84% of the yearOriginally due 2019: 3 projects moved by under 2 years, 16% of the year’19Originally due 2020: 13 projects kept the original date, 100% of the year’20Originally due 2021: 11 projects kept the original date, 92% of the yearOriginally due 2021: 1 projects moved by under 2 years, 8% of the year’21Originally due 2022: 33 projects kept the original date, 94% of the yearOriginally due 2022: 1 projects moved by under 2 years, 3% of the yearOriginally due 2022: 1 projects moved by 2 years or more, 3% of the year’22Originally due 2023: 46 projects kept the original date, 96% of the yearOriginally due 2023: 2 projects moved by 2 years or more, 4% of the year’23Originally due 2024: 22 projects kept the original date, 96% of the yearOriginally due 2024: 1 projects moved by 2 years or more, 4% of the year’24Originally due 2025: 21 projects kept the original date, 91% of the yearOriginally due 2025: 2 projects moved by under 2 years, 9% of the year’25Originally due 2026: 22 projects kept the original date, 100% of the year’26Originally due 2027: 9 projects kept the original date, 100% of the year’27Originally due 2028: 4 projects kept the original date, 100% of the year’28Originally due 2029: 3 projects kept the original date, 100% of the year’29Originally due 2030: 2 projects kept the original date, 100% of the year’30Originally due 2032: 1 projects kept the original date, 100% of the year’32

Read down a bar to see how much of that year's cohort held its promise. Facts as per filings on RERA website.

0125250375500Originally due 2017: 20 flats kept the original date, 90% of the year (only 2 of 10 projects filed a flat count)Originally due 2017: 26 flats moved by under 2 years, 10% of the year (only 2 of 10 projects filed a flat count)’17’18’19’20Originally due 2021: 88 flats kept the original date, 92% of the year (only 1 of 12 projects filed a flat count)’21Originally due 2022: 21 flats moved by 2 years or more, 3% of the year (only 1 of 35 projects filed a flat count)’22Originally due 2023: 152 flats kept the original date, 96% of the year (only 4 of 48 projects filed a flat count)’23Originally due 2024: 163 flats moved by 2 years or more, 4% of the year (only 1 of 23 projects filed a flat count)’24Originally due 2025: 32 flats kept the original date, 91% of the year (only 4 of 23 projects filed a flat count)Originally due 2025: 226 flats moved by under 2 years, 9% of the year (only 4 of 23 projects filed a flat count)’25Originally due 2026: 435 flats kept the original date, 100% of the year (only 9 of 22 projects filed a flat count)’26Originally due 2027: 239 flats kept the original date, 100% of the year’27Originally due 2028: 228 flats kept the original date, 100% of the year’28Originally due 2029: 224 flats kept the original date, 100% of the year’29Originally due 2030: 206 flats kept the original date, 100% of the year’30Originally due 2032: 7 flats kept the original date, 100% of the year’32

Hatched years are ones where most builders never filed a flat count, so the bar understates the real total. Read down a bar to see how much of that year's cohort held its promise. Facts as per filings on RERA website.

Projects in Jalgaon

ProjectDeveloperUnits BookedRegistered
PPRL Basera - JaynagarVinaykumar Uttamchand Parakh21413%27 Mar 2023
ADITYA GOLD CITYADITYA BUILDERS AND DEVELOPERS20640%16 Dec 2019
Chhoriya Fortune City -Parola plottingANMOL CHHORIYA AND ASSOCIATES19747%18 May 2022
KRUSHNAJI ARCADEM/S. SHREYASH REALTIES1900%15 Apr 2024
SSD ComplexJay Narayan Developers1637%9 May 2023
B M RAVAL PLAZADUSHYANT PRAVINSAGAR RAVAL15111%31 Aug 2017
SUKRUTI SURATNASURATNA INFRA LLP13243%21 Aug 2023
Mundada High StreetMundada Realty12921%31 Jan 2024
MAHARANA PRATAP SAHKARI GRUH NIRMAN SANSTHA LIMITEDMAHARANA PRATAP SAHKARI GRUH NIRMAN SANSTHA LIMITED8836%6 Aug 2017
MUNDADA ESTATEAMEY OMPRAKASH MUNDADA780%30 Aug 2021
One High StreetAshtavinayak Enterprises500%3 Oct 2025
JK EleganceJK Elegance4439%13 Nov 2024
SHIV MAAN HEIGHTSJAIN INFRA3832%8 Jun 2023
GAURI NANDAN APARTMENTPATIL MAHAJAN380%15 May 2026
MANNAT HEIGHTSAJAY SHANTILAL LALWANI3336%2 Feb 2018
LAXMI HEIGHTSPRAJAKT SHIVAJI PATIL290%29 Oct 2024
SAMARTHS SUVRUDDHISamarth Constrowell Private Limited270%10 Dec 2024
RESIDENTIAL LAYOUT G NO 1135ANIL SUBHAN PATIL260%31 Aug 2017
ANTARIKSHSUMEET PRAKASHCHAND MUTHA2612%21 May 2024
PANCHAVATI PALACECHINTAMANI CONSTRUCTION2580%26 Jun 2019
SAI DHAMJB ASSOCIATES2421%1 Oct 2021
Krushna HeightsM/s Shree Swami Samarth Traders Builders and Developrs240%31 Jan 2025
ADITYA HEIGHTSMAYURI MUKUND BILDIKAR2162%9 Jul 2020
DESHMUKH NAGARSANGITA PRASHANT DESHMUKH2020%9 Nov 2017
CASA DE ROYALERaka Constructions1937%24 Jan 2025
RAMAI KESHAV VIHAR PHASE-1VISHAL RAJENDRA NATKAR1694%10 Feb 2020
MAJESTIQUE LANDMARKORNATE PROPERTIES1553%10 Jul 2024
Mixed with All 1 MayRupal as Public Authority1533%2 May 2025
OM RESIDENCYJALGAON PROJECTS PVT LTD120%6 May 2024
Gokuldas HousingGokuldas Housing825%6 Mar 2023
BHARAT NAGARJAKIRKHAN YASINKHAN QURESHI743%2 Mar 2021
VARAD HEIGHTSToke And Dhake Associates10%5 Oct 2021
SAI CHARAN RESIDENCYN & L ASSOCIATES10%21 Jun 2024
Vasukamal SamruddhiVasukamal & Associates--22 Jun 2017
RADHA RAMAN APARTMENTSARVESHWAR ASSOCIATES--5 Jul 2017
Sukruti PinnacleArihant Developers--10 Jul 2017
PANDIT CORNERSAGAR PANDIT TADE--10 Jul 2017
SIDDIVINAYAK HEIGHTSMINAKSHI CONSTRUCTIONS--18 Jul 2017
Vasukamal SolitaireNarendra Ziprulal Kabra--22 Aug 2017
PRAKASH ESTATESM/S REALTY SHAPERS--31 Jul 2017
OM PREMIAOMBUILDCORP--28 Jul 2017
SHRI KRISHNA HEIGHTSJAY SHREE KRISHNA DREAM HOMES BUILDERS AND DEVELOPERS--21 Sep 2017
PPRL Mera Ghar - Building L1Parakh Plexus Realty Ltd.--27 Jul 2017
PPRL Mera Ghar - Building M1Parakh Plexus Realty Ltd.--29 Jul 2017
Pankaj ResidencyPankaj Borole--17 Aug 2017
Rishika ParkPankaj Borole--27 Jul 2017
PPRL Mera Ghar - Building E2Parakh Plexus Realty Ltd.--29 Jul 2017
Sanika TowerSucheta Jitendra Kolhe--4 Aug 2017
MANAS ARADHANA APARTMENTManas Developers--1 Aug 2017
SHRISHRITOWERSSHRISHRI TOWERS--22 Aug 2017
GULMOHAR PARKVPBHANDARICONSTRUCTIONSPVTLTD--18 Aug 2017
SANKALP RESIDENCYRAVINDRA SUPADU PAWAR--19 Aug 2017
PUSHPCHHAYA RIVER VIEWRAKA SURANA ASSOCIATES--14 Aug 2017
ZENIYA ARCADERAJESH DHANJI ZALTE--5 Aug 2017
SHREE N T MUNDADA PARK - BLG NO 1SHREE N T MUNDADA PARK--16 Aug 2017
SHREE N T MUNDADA PARK - BLG NO. 3SHREE N T MUNDADA PARK--19 Aug 2017
SHREE N T MUNDADA PARK - BLG NO 5SHREE N T MUNDADA PARK--17 Aug 2017
SHEELA PRIDEHiranand T Manghwani & Others--31 Aug 2017
PRABHU RAM RESIDENCYSANJAY NAMDEV BHIRUD--19 Aug 2017
HAREKRISHNA RESIDENCYRAMESH SHANKARLAL MOR--31 Aug 2017
ADITYA PLAZACREATIVE BUILDERS--15 Dec 2017
SOPAN PARKKALPANA SUDHAKAR PHALAK--18 Aug 2017
PAREES HEIGHTSANIL SUBHAN PATIL--31 Aug 2017
SHREE N T MUNDADA PARK - BLG NO 2SHREE N T MUNDADA PARK--11 Aug 2017
MADHUPRABHA HEIGHTSPRIME DEVELOPERS--18 Aug 2017
SHRISHRI LAKE CASTLESHREE DEVELOPERS--18 Aug 2017
RESIDENTIAL BLOCK IN G NO 334/1AND2Suresh Gyanchand Haswani--22 Aug 2017
EXOTICAKMP BUILDERS--11 Aug 2017
COMMERCIAL COMPLEX ON PLOT NO 92 TO 95Suresh Gyanchand Haswani--22 Aug 2017
VISHRAM PRIDEV INFRA SOLUTION--14 Aug 2017
SAMRUDDHI APARTMENTPRAMOD MADHUKAR GHUGE--31 Aug 2017
Construction of 33 Ts MIG on S. No. 300/1 B at Sakegaon, Bhusawal, Dist. JalgaonNashik Housing And Area Development Board--17 Aug 2017
Construction of 30 HIG T/s. on plots of S. No. 299/1C and 299/2 at Sakegaon, Bhusawal, Dist. JalgaonNashik Housing And Area Development Board--31 Aug 2017
GOKULDHAMYOGESHWAR BUILDERS AND DEVELOPERS--31 Aug 2017
KRUSHNA RESIDENCYSARK BUILDCON--31 Aug 2017
JAIRAM HEIGHTSSHILP CONSTRUCTION--14 Sep 2017
SHANKAR PLAZAPRASHANT MANOHAR NIKAM--31 Aug 2017
SINHAGADPRASHANT MANOHAR NIKAM--22 Aug 2017
SAI SAPPHIRE REGENCYKASHINATH MOTIRAM TALELE--31 Aug 2017
MAHAVIR HEIGHTSAHYOG CREATIONS--31 Aug 2017
Ganesha PlazaDeepak prakash saraf--14 Sep 2017
RUKHMINI HEIGHTSSPRING SHELTERS--31 Aug 2017
ASHIRWAD DREAM FLOWERMAYURI MUKUND BILDIKAR--31 Aug 2017
ASHIRWAD PLAZATHE CREATIVE ASSOCIATES--1 Sep 2017
KRUSHNAWORLD CITYGLOBAL BUILDERS AND DEVELOPERS--9 Nov 2017
Ganesh DelightGurudatta Global Developers--21 Sep 2017
SIDDHKALA NAGARYogesh Magar--5 Oct 2017
SIDDHAKALA NAGARSHREE MK DEVELOPERS--23 Oct 2017
KRISHNA CITYGLOBAL INFRASTRUCTURE--7 Nov 2017
SAMADNYA APARTMENTSSARASWATI CONSTRUCTIONS--25 Oct 2017
GAURI GREEN APPARTMENTGAURI CONSTRUCTIONS BUILDERS AND DEVELOPERS--26 Mar 2018
AYAN HEIGHTSMOHAMMADAMIMN MOHAMMADNASAR QURESHI--2 Jan 2018
COOL HOMESSAVITA SHIVAJI PATIL--2 Jan 2018
Om HeightsOM BUILDERS AND DEVELOPERS--8 Feb 2018
RAMANAND NAGARM/S. SHREYASH REALTIES--3 Oct 2018
VRUNDAVANSAGAR PANDIT TADE--23 Feb 2018
Ashirwad Dream City Phase 2MAYURI MUKUND BILDIKAR--23 Jan 2018
Imperial towerAkash enterprises--20 Feb 2018
NEHARajesh PUKHRAJ RAKA--12 Feb 2018
GOKULDHAM RESIDENCYOM BUILDERS AND DEVELOPERS--7 Feb 2018
Vrudavan HeightsVrundavan Heights--15 Mar 2018
Shriram ApartmentKavita Sangramsing Shinde--8 Mar 2018
SAMRUDDHI HEIGHTS PHASE IISUMIT MAHENDRA CHORDIA--22 Mar 2018
SUN-RISE APPARTMENTRUKNUDDIN ALIMUDDIN SIDDIQUI--28 Mar 2018
RAJARAM BAPU MEGA CITY PHASE IKISHOR PITAMBAR PATIL--22 Mar 2018
SANKALPSIDDHIDNYANESHWAR PUNDLIK PATIL--12 Jun 2018
Aanand-KrishnaSHREE SWAMI SAMARTH TRADERS BUILDERS AND DEVELOPERS--26 Mar 2018
KRUSHNA CITY PHASE 3GLOBAL BUILDERS--9 Apr 2018
GAURI CLASSICPATIL AND DESHMUKH ASSOCIATES--10 Apr 2018
NARAYANI PARKSHIV CONSTRUCTION--9 Aug 2018
LAXMI-NIRMAL HEIGHTSYASHADA ENTERPRISES PRIVATE LIMITED--25 Jun 2018
RUDRA APARTMENTMohan Bhimaji Lad--2 Aug 2018
SAI GANESHSAI INFRA--22 Jun 2018
RAJARAMBAPU MEGA CITY PHASE IIKISHOR PITAMBAR PATIL--31 Jul 2018
ASHA HEIGHTS B WINGAKHLAK ISMAIL TELI--21 Sep 2018
SNEHA HEIGHTESSNEHA DEVELOPERS--15 Oct 2018
GAURI HERITAGEPATIL AND PAWAR ASSOCIATES--10 Oct 2018
GOKULDHAMAVINASH CHAMPALAL JAKHETE--3 Oct 2018
NAVKAR RESIDENCYMAYA RAJESH DOSHI--10 Oct 2018
Vasuakamal ViharNarendra Ziprulala Kabra--24 Oct 2018
SHAKUNTALA HOMESBHAVANA DHANANJAY THOKE--24 Jun 2019
GAURI-PREM ARCADEPATIL AND MANURE ASSOCIATES--5 Dec 2018
Town Square HeightsTown Square Builders--28 Dec 2018
VASTUNAGARM/S. CHANDRA CONSTRUCTIONS--14 Jan 2019
Sukruti DreamHomesArihant Developers--28 Dec 2018
SAIRANG HEIGHTSVASTUCONSTRUCTIONS--29 Jan 2019
SAI SHRI SONA PLAZAN & L ASSOCIATES--12 Feb 2019
ORANGE CITYM/S DBP DEVELOPERS--18 Apr 2019
VISHWA-KARMA SANKULPADMAVATI LANDMARK--26 Mar 2019
THE RUDRA SQUARESUNIL RAMNARAYAN MANTRI--8 May 2019
SHUBHAMANGALSHUBHAMANGAL DEVELOPERS--9 Apr 2019
DWARKAIMURLIDHAR RAJARAM MAHAJAN--21 Jun 2019
Manas Aaradhya ApartmentManas Developers--9 Apr 2019
MEGH MALHAR PHASE 2SOHAM DEVELOPERS--8 May 2019
J K PARADISEJ K PARADISE--27 May 2019
MAKRA TOWEREZZY ENTERPRISES--5 Jul 2019
DESHMUKH SANKULSAGAR UMAKANT DESHMUKH--28 Jun 2019
Gopal Krushna ResidencyThepade Builders--5 Aug 2019
SAI PLAZASAI SHIV CONSTRUCTION--4 Sep 2019
LEELA RESIDENCYADITYA BUILDERS AND LAND DEVELOPERS--12 Oct 2019
Vasukamal MithilaVasuakamal Five Elements--5 Sep 2019
Om PrabhaOm Build Corp--23 Oct 2019
AKSHYA PLAZAYASHASHRI BUILDCON COMPANY--1 Oct 2019
KALPTARUSAGAR PANDIT TADE--16 Sep 2019
SUPRIYA RESIDENCYADITYA BUILDERS AND DEVELOPERS--30 Oct 2019
KRISHNA NANDANIS PALACEJAI SHRI KRUSHNA STRUCTURE--30 Oct 2019
SHRI SAI VIHARPUSHPAK ONKAR NARKHEDE--10 Jan 2020
Behede Deshpande ComplexBehede & Deshpande Group--20 Dec 2019
R D TOWERM/S SHREE SWAMI SAMARTH TRADERS BUILDERS AND DEVELOPERS--14 Jan 2020
MORESHWAR APARTMENTPATIL MAHAJAN--9 Jan 2020
SHAKUNTALA HEIGHTSSHIV CONSTRUCTION--23 Mar 2020
LABHONI KAMAL VILLANARENDRA NIHALCHAND JAIN--23 Jan 2020
KRUPA APARTMENTABRAHAM THOMAS MULLESSERIL--1 Jul 2020
Shakun EstatesRajesh Raka--7 Jan 2020
Kunal ParkM/S SHREE SWAMI SAMARTH TRADERS BUILDERS AND DEVELOPERS--7 Jul 2020
Shivtirth ApartmentPRAMOD MADHUKAR GHUGE--4 Jul 2020
SHREERAM RESIDENCYNARENDRA ATMARAM PATIL--23 Mar 2020
VANDAN HEIGHTSGOVINDA GHANSHYAM NAGORI--5 Apr 2020
MANGALAM PARKMANGALAM INFRA--1 Jul 2020
SAI YASH HEIGHTSJAIN BUILDCON--28 Jun 2020
VIGHNAHARTA APARTMENTPATIL MAHAJAN--12 Oct 2020
SHRI APARTMENTMILAN DEVANAND PRAJAPATI--4 Jul 2020
NAYANTARA ARCADE CITY PRIDENAYANTARA DEVELOPERS--14 Apr 2020
Ganesha Chaitanyadeepak prakash saraf--29 May 2020
Ganesha DivineGurudatta Global Developers--15 May 2020
SWAMI PUSHPA APARTMENTPOONAM RAMESH DEORE--8 Jun 2020
Shri Krishna AvenueGanesh Ladhe--18 Jul 2020
SWAMI NARAYAN PARKSHRI SWAMI LAND DEVELOPERS--31 Jul 2020
SAYED ZAHIDALI JAMATALIZAHIDALI JAMATALI SAYED--19 Aug 2020
Gopal Krushna Residency Phase 2THEPADE BUILDERS--30 Sep 2020
TulasRajesh Raka--11 Sep 2020
RAMAI KESHAV VIHAR PHASE-2VISHAL RAJENDRA NATKAR--2 Dec 2020
SHUBHAMRajesh Raka--2 Oct 2020
PATIL HEIGHTSPRAJAKT SHIVAJI PATIL--10 Nov 2020
SHRI BALAJI HEIGHTSSHRI BALAJI CONSTRUCTIONS--21 Oct 2020
Ekdant ResidencyShri. Morya Construction--21 Oct 2020
SINHAGADH VILLAS PHASE IHARISH MANIKARO SURVE--13 Nov 2020
SINHAGAD VILLAS PHASE IIHARISH MANIKARO SURVE--1 Dec 2020
SHOBHARAM HEIGHTSSHRIRAM CONSTRUCTION--16 Dec 2020
SAI KRUSHANASHASAI KRUSHNA ASSOCIATES--8 Mar 2021
PRABHULILAVastu Builders--8 Sep 2021
SUNSHINE TOWERSACHIN SURYAKANT BHAMRE--12 May 2022
RADHAKRISHNASHANKHESHWAR ASSOCIATES--18 May 2021
SAI JYOTSNAIV B WANI AND COMPANY--18 May 2021
NEW ANAND KRUSHNAM/S SHREE SWAMI SAMARTH TRADERS BUILDERS AND DEVELOPERS--26 Apr 2021
SWAMI APARTMENT 2DEVENDRA PANDURANG SONAWANE--5 Aug 2021
Laxman AvenueLakshman Daulat Mali--29 May 2021
KAMLAI RESIDENCYDNYANESHWAR PUNDLIK PATIL--1 Sep 2021
Shree Balaji PrideShree Balaji Developers--5 Aug 2021
SHREE SWAMI SAMARTH SANKULKADAM AND PATIL DEVELOPERS--5 Oct 2021
Navkar ResidencyGLOBAL BUILDERS--8 Sep 2021
C S COMPLEX AND RESIDENCYJAHID CHIRAG SHAIKH--11 Oct 2021
VISHNU KUNJPADMAVATI DEVELOPERS--29 Sep 2021
RAMAI KESHAV VIHAR PHASE 3VISHAL RAJENDRA NATKAR--20 Sep 2021
NAVKAR HEIGHTSRAJESH CONSTRUCTION AND BUILDERS--29 Sep 2021
MORYA HEIGHTMORYA BUILDERS AND DEVELOPERS--20 Dec 2021
DEVAKINANDAN RESIDENCYTHEPADE BUILDERS--31 Oct 2021
SHIVAAY SQUAREISHANAVI CONSTRUTECH PVT LTD--24 Jan 2022
GOPAL PLAZABHUSHAN GOPAL PATIL--3 Feb 2022
PARK ROYALEMAHAVEER BUILDCON--22 Dec 2021
GANPATI NAGARGiriraj Developers--15 Jun 2022
Sukruti SerenityArihant Developers--17 Jan 2022
Mannat heightsAjmal khan Musa Khan--17 Mar 2022
Shivnery ParkSUPEREALTY BUILDCON LLP--15 Jun 2022
JK PRIDEJAJU & KHANDELWAL CONSTRUCTIONS--30 Mar 2022
JAMUNA RESIDENCYJAMUNA INFRA--8 Mar 2022
SURYADARSHAN RESIDENCYGANESH GOPAL CHAUDHARI--24 May 2022
SHAMBHO RESIDENCYANITA VILAS AHIRRAO--14 Mar 2022
AAROHI HEIGHTSPIYUSH ASHOK BEDMUTHA--14 Mar 2022
SUKRUTI CENTRUMArihant Construction--24 May 2022
ARIHANNT SAPPHIREARIHANNT SAPPHIRE--28 Apr 2022
SAHYADRI SHIKHARSAHYADRI SHIKHAR--20 Jul 2022
OMKARA RESIDENCYJALGAON PROJECTS PVT LTD--25 Aug 2022
MORYA PLAZATRIMURTI CONTRUCTIONS--28 Nov 2022
BHAGAVANTI HEIGHTSSHIV GAJANAN CONSTRUCTION--24 Jan 2023
UDYOG ISHWARM/S. FAITH BUILD CONSTRUCTIONS--10 Jan 2023
VASTU NINEPRIDE LEELA BUILDERS AND DEVELOPERS--22 Feb 2023
VASTU VANDANMANOHAR GANPAT WANI--6 Mar 2023
M SQUAREAARADHYA INFRAPROJECTS--8 Dec 2022
SHRI GAJANAN COMPLEXRAJANI DINKAR PATIL--12 Dec 2022
VASANT VIHARAARADHYA INFRAPROJECTS--22 Dec 2022
SAI KRUSHANASHA HEIGHTSAI KRUSHNA ASSOCIATES--24 Jan 2023
VRINDAVANRaka Constructions--15 Feb 2023
PRIDE RESIDENCYSUMIT MAHENDRA CHORDIA--27 Mar 2023
Shiv NamanJain Buildcon--8 Jun 2023
RUPCHAND RAMCHAND COMPLEXASHISH PUNAMCHAND AGRAWAL--27 Jun 2023
SAI PRAKASH HEIGHTSJAIN BUILDCON--17 Apr 2023
ANVIKA ARCADEKAILASH VINAYAK KASAR--28 Apr 2023
VIGHNARAJPATIL MAHAJAN--7 Jul 2023
Prathamesh EliteHemant Developers--8 Jun 2023
DEV HEIGHTSDNYANDEV VASANT KALE--23 Jun 2023
AJINKYATARA APPARTMENTRAKESH BHIMRAO BORSE--9 Aug 2024
SIDDHIVINAYAK PRIDESIDDHIVINAYAK PRIDE--20 Jun 2024
THE LAKE PARADISEJIVRAJ BUILDCON--7 Jul 2025
Planning a launch in Jalgaon? The area consolidated report packs launches, inventory movement, unit sizes and absorption across the projects you pick into one document. Rs 2,999 for the first project and Rs 1,999 for each additional one. Area report · Rs 2,999 · coming soon  See what is coming

Developers active in Jalgaon

PATIL MAHAJAN (4), SHREE N T MUNDADA PARK (4), MAYURI MUKUND BILDIKAR (3), VISHAL RAJENDRA NATKAR (3), Arihant Developers (3), SAGAR PANDIT TADE (3). Each link opens the promoter's track record built from their own filings.

Frequently asked questions

How do I shortlist among the Jalgaon projects listed above?

Compare each project against its neighbours, not against the brochure. The median project on this page is 21% booked, which is the benchmark to hold any single project against. A project selling much slower than the district may have a pricing or credibility problem; one selling much faster deserves a look at whether construction is keeping pace with collections. Then open the developer link to check their delivery record on other projects, and compare filed carpet areas rather than super built-up marketing areas.

What does a revised completion date on a Jalgaon project actually mean?

The promoter has moved their deadline with the regulator, usually under section 6, which allows an extension of up to one year for reasons beyond their control. It does not move the date in your agreement for sale: your section 18 claim for delay interest or refund runs from the possession date you signed for. Before booking a project with a revision on record, ask which approvals or works the new date depends on.

What stamp duty will I pay on a flat in Jalgaon district?

The rate depends on the local body: roughly 6 to 7 percent inside municipal corporations, 4 percent in municipal council areas and 3 percent in gram panchayat areas, with women buying in their sole name paying 1 percent less. The registration fee is 1 percent of value, capped at Rs 30,000. Duty is charged on the higher of your agreement value and the ready reckoner value. ReraGenie has a free Maharashtra stamp duty calculator under Tools.

What does it mean that some Jalgaon registrations have lapsed?

A RERA registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then, the registration lapses and the project stops being a registered project: the promoter may not legally market or sell in it, and the Authority can act under section 7 against a defaulting promoter. It does not cancel your agreement for sale or your section 18 rights if you have already booked, and it does not mean construction has stopped. Ask the promoter for the current registration position in writing, and verify it on the MahaRERA portal before you pay any further instalment.

What if a Jalgaon project shows strong sales but slow construction?

That shape means the promoter is collecting money faster than they are building, which is fine under a disciplined promoter and dangerous under a stretched one. The law helps: withdrawals from the project account need architect, engineer and CA certificates in proportion to progress. Check the promoter's delivery record, and watch the next quarterly filing (due within 20 days of each quarter end) to see whether the construction line moves.

Data from official MahaRERA filings.