SSD Complex
RG-MH-79298 · RERA P49900050851 · Last updated on MahaRERA portal: 29 Jun 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Completion date moved by 25 months
- 2 extensions taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Jalgaon registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SSD Complex is a Commercial project by Jay Narayan Developers in Jalgaon, Maharashtra, registered with MahaRERA as P49900050851 on 9 May 2023. Possession is promised by 31 Oct 2026. The completion date has moved by 25 months from the original filing. 12 of the 163 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.
At a glance
Project
- NameSSD Complex
- TypeCommercial
- Location
- F.P.No.286/1 Part
- Station Road
- Chalisgaon
- Jalgaon
- 424101
- Pincode424101
- RERA no.P49900050851
- ReraGenie IDRG-MH-79298
Builder
- NameJay Narayan Developers
- Entity typePartnership
- PartnersPRASHANT VASUDEO JIYANI, Raj Ramesh Punshi, Shobha Ashok Punshi, SURESH SABANDAS RAWLANI, Ashok Sabaldas Rawlani, Pawan Rameshlal Kursija, Amit Rameshlal Kursija, Premchand Javarilal Khinvsara, Arvind Javarlal Jain, Jitendra Bhojraj Punshi, jatin Haresh Manglani
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on9 May 2023
- Promised completion31 Oct 2026
- Revised completionRevised to 31 Oct 2026 (originally 30 Sep 2024)
- Buildings1 building record
- Documents filed67 files
Current status
Figures as on 29 Jun 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| SSD Complex | NA | 3 | 3 | 0 | 163 | 163 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 29 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
3 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 85%.
SSD Complex: 45% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 85% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 80% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 25% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 10% |
Progress on shared amenities15
As on 29 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 50% |
| Water Supply | Yes | 20% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 25% |
| Storm Water Drains | Yes | 60% |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 60% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| SSD Complex | NA | Rs 5.88 cr | Rs 2.85 cr |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Kiran S. onawane (Patil) |
| Engineer | Ashok S.Punshi |
| Engineer | Ashok S. Punshi & Associates |
| Chartered Accountant | Yash Nager |
| Chartered Accountant | Alkesh Rawka And Associates |
| Partner | Role in project |
|---|---|
| Jay Narayan Developers | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterThe delay in the project is primarily attributed to challenges in securing adequate labour and materials, which have been impacted by financial constraints. The ongoing sluggish recovery in the real estate market has further compounded the situation, as the anticipated recovery of booking amounts has fallen short of expectations.
Reason as filed by the promoterI respectfully request an extension of time for the completion of the project due to unforeseen delays. The slab work has been delayed owing to the migration of laborers during the festival season and poor coordination between contractors. Additionally, the progress of the wall and brickwork has been affected by supply chain issues, particularly fluctuations in cement prices. Financial constraints, stemming from a lack of demand from the allottee, have also contributed to the delay. In view of these challenges, we seek the authority’s kind consideration for an extension of time to complete the
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 19 Apr 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 6 Apr 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 21 Apr 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 6 Apr 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Oct 2026
Documents filed67
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1-Sign.pdf | 29 Jun 2026 |
| Withdrawal Update Form 1File: Form 1-Sign.pdf | 29 Jun 2026 |
| Withdrawal Update Form 2File: Form 2-New.pdf | 29 Jun 2026 |
| Withdrawal Update Form 2File: Form 2-New.pdf | 29 Jun 2026 |
| Withdrawal Update Form 3File: Final Form 3.pdf | 29 Jun 2026 |
| Withdrawal Update Form 3File: Final Form 3.pdf | 29 Jun 2026 |
| Withdrawal Update Form 1File: Form 1-Sign.pdf | 20 Dec 2025 |
| Withdrawal Update Form 2File: Form 2-New.pdf | 20 Dec 2025 |
| Withdrawal Update Form 3File: Final Form 3.pdf | 20 Dec 2025 |
| Withdrawal Update Form 1File: Form 1-Sign..pdf | 17 Dec 2025 |
| Withdrawal Update Form 2File: Form 2-New..pdf | 17 Dec 2025 |
| Withdrawal Update Form 3File: Final Form 3..pdf | 17 Dec 2025 |
| Withdrawal Update Form 1File: Form 1.pdf | 10 Nov 2025 |
| Withdrawal Update Form 1File: Form 1.pdf | 10 Nov 2025 |
| Withdrawal Update Form 2File: Form 2.pdf | 10 Nov 2025 |
| Withdrawal Update Form 2File: Form 2.pdf | 10 Nov 2025 |
| Withdrawal Update Form 3File: Form 3 2025-26 Q2.pdf | 10 Nov 2025 |
| Withdrawal Update Form 3File: Form 3 2025-26 Q2-New.pdf | 10 Nov 2025 |
| Form 2A (FY 2024-2025)File: Form 2A 2024-25-Sign.pdf | 10 Nov 2025 |
| Form 2A (FY 2023-2024)File: Form 2A 2023-24.pdf | 10 Nov 2025 |
| Form 5 (FY 2023-2024)File: Form 5_Signed.pdf | 10 Nov 2025 |
| Withdrawal Update Form 1File: Form 1 2025-26 Q1.pdf | 8 Nov 2025 |
| Withdrawal Update Form 2File: Form 2 2025-26 Q1.pdf | 8 Nov 2025 |
| Withdrawal Update Form 3File: Form 3 2025-26 Q1New.pdf | 8 Nov 2025 |
| Form 5 (FY 2024-2025)File: Form 5 2024-25- Final.pdf | 31 Oct 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 2024-25 Q4.pdf | 10 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 2024-25 Q3.pdf | 10 May 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 2024-25 Q3.pdf | 10 May 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold 2024-25 Q3_11zon.pdf | 10 May 2025 |
| Declaration in FORM BFile: Affidavit Cum Declaration - FORM B.pdf | 2 Dec 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5_Signed.pdf | 28 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 2023-24 Q3.pdf | 12 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf | 12 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 24-25 Q2_Signed.pdf | 12 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 2023-24 Q3.pdf | 12 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf | 12 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory_.pdf | 12 Nov 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A.pdf | 12 Nov 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5_Signed.pdf | 12 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: Shop_Sold and Unsold details.pdf | 15 Nov 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Pi7_Form_3_fianl.pdf | 15 Nov 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf | 6 Nov 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate-compressed.pdf | 6 Nov 2023 |
| CERSAI detailsFile: CERSAI_Search_Report_200267577251_For_Asset_Based_Search_02_05_2023_11_18_20_779.pdf | 3 May 2023 |
| CERSAI detailsFile: Decleration Cersai.pdf | 3 May 2023 |
| Building plan approvalFile: Adobe Scan Apr 20, 2023 (1).pdf | 21 Apr 2023 |
| Building plan approvalFile: Adobe Scan Apr 20, 2023.pdf | 21 Apr 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Adobe Scan Apr 20, 2023 (1).pdf | 21 Apr 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Adobe Scan Apr 20, 2023.pdf | 21 Apr 2023 |
| Copy of the legal title reportFile: Search Report In Maharera Format_compressed.pdf | 19 Apr 2023 |
| Details of encumbrances concerned to FinanceFile: Details of encumbrances concerned to Finance.pdf | 7 Apr 2023 |
| Details of encumbrances concerned to LegalFile: Details of encumbrances concerned to Finance.pdf | 7 Apr 2023 |
| Declaration about Commencement CertificateFile: Decleration of Commencement Certificate (1)_page-0001.pdf | 7 Apr 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 33 Form 3 CA Certificate_11zon.pdf | 7 Apr 2023 |
| Building plan approvalFile: Approved Building.pdf | 6 Apr 2023 |
| Layout approvalFile: Plan Layout.pdf | 6 Apr 2023 |
| PAN CardFile: Firm PAN.pdf | 6 Apr 2023 |
| Copy of Layout Approval (in case of layout)File: Plan Layout.pdf | 6 Apr 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Approved Building.pdf | 6 Apr 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement certificate- Jaynarayan05032023.pdf | 6 Apr 2023 |
| Declaration in FORM BFile: FORM B.pdf | 6 Apr 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclouser Merged_11zon.pdf | 6 Apr 2023 |
| Proforma of Allotment letterFile: Allotment Letter.pdf | 6 Apr 2023 |
| Proforma of Agreement for saleFile: Agreement to Sale.pdf | 6 Apr 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Seperate Bank Account Declaration.pdf | 6 Apr 2023 |
| Deviation Report with respect to Allotment letterFile: Deviation Report Allotment letter.pdf | 6 Apr 2023 |
| Deviation Report with respect to model copy of AgreementFile: Deviation Report Agreement.pdf | 6 Apr 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Jalgaon
Computed across the 230+ Jalgaon projects on ReraGenie, from their own filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- All 67 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep SSD Complex on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Chalisgaon230+ in Jalgaon
MAHARANA PRATAP SAHKARI GRUH NIRMAN SANSTHA LI
MAHARANA PRATAP SAHKARI GRUH NIRMAN SANSTH
Krushna Heights
M/s Shree Swami Samarth Traders Builders a
DESHMUKH NAGAR
SANGITA PRASHANT DESHMUKH
AJINKYATARA APPARTMENT
RAKESH BHIMRAO BORSE
AKSHYA PLAZA
YASHASHRI BUILDCON COMPANY
Aanand-Krishna
SHREE SWAMI SAMARTH TRADERS BUILDERS AND D
See every Jalgaon project, with the district possession charts
Builder: Jay Narayan Developers
Jay Narayan Developers has 1 registration on MahaRERA, including SSD Complex. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Jalgaon district page.
Frequently asked questions
What are my rights if SSD Complex is delayed beyond 31 Oct 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SSD Complex?
The registered promoter entity is Jay Narayan Developers, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SSD Complex?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SSD Complex?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SSD Complex?
The professionals named in the filing: Architect: Kiran S. onawane (Patil); Engineer: Ashok S.Punshi; Engineer: Ashok S. Punshi & Associates; Chartered Accountant: Yash Nager; Chartered Accountant: Alkesh Rawka And Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SSD Complex?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback