Home / Browse projects / Jalgaon, Maharashtra / SHIV MAAN HEIGHTS
SHIV MAAN HEIGHTS
By JAIN INFRA
RG-MH-61199 · RERA P49900051360 · Last updated on MahaRERA portal: 20 Feb 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 7 months past the filed date
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Jalgaon registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SHIV MAAN HEIGHTS is a Others project by JAIN INFRA in Jalgaon, Maharashtra, registered with MahaRERA as P49900051360 on 8 Jun 2023. Possession was promised by 31 Mar 2026 and is now 7 months past that date. 12 of the 38 units on this registration are recorded sold or booked, and 10 of 11 construction stages are filed complete.
At a glance
Project
- NameSHIV MAAN HEIGHTS
- TypeOthers
- Location
- 100 FT ROAD
- JULALSING WADI
- Jalgaon
- 425001
- Pincode425001
- MapView location on Google Maps (as filed on RERA)
- RERA no.P49900051360
- ReraGenie IDRG-MH-61199
Builder
- NameJAIN INFRA
- Entity typePartnership
- PartnersAKASH ARVINDKUMAR JAIN, SIDDHARTH ARVINDKUMAR JAIN, MANOJ INDARCHAND SURANA
- Other registrations1 more →
- Completed1 of 2
- No longer live1 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on8 Jun 2023
- Promised completion31 Mar 2026
- Revised completionNone
- Buildings1 building record
- Documents filed114 files
Current status
Figures as on 20 Feb 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| SHIV MAAN HEIGHTS | NA | 9 | 0 | 28 | 10 | 38 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 20 Feb 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.
SHIV MAAN HEIGHTS: 91% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 20 Feb 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 100% |
Parking filed57
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| SURESH MANSING PATIL | Jalgaon | Jalgaon |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| SHIV MAAN HEIGHTS | NA | Rs 5.05 cr | Rs 4.83 cr |
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | ANAND MUKUND |
| Engineer | HEMANT S CHAVAN |
| Chartered Accountant | NACHIKET JAKHETIYA |
| Partner | Role in project |
|---|---|
| JAIN INFRA | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 5 Apr 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 5 Apr 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 9 Aug 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 9 Aug 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed114
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 114 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1.pdf | 20 Feb 2026 |
| Withdrawal Update Form 2File: Form 2.pdf | 20 Feb 2026 |
| Withdrawal Update Form 3File: Form3Q2FY2526.pdf | 20 Feb 2026 |
| Withdrawal Update Form 1File: Form 1.pdf | 11 Dec 2025 |
| Withdrawal Update Form 2File: Form 2.pdf | 11 Dec 2025 |
| Withdrawal Update Form 3File: Form3Q2FY2526.pdf | 11 Dec 2025 |
| Form 1File: 1Form130062023.pdf | 8 Aug 2025 |
| Form 2File: 2Form230062023.pdf | 8 Aug 2025 |
| Form 3File: Q1.pdf | 8 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Q1.pdf | 8 Aug 2025 |
| Form 1File: 1Form130092023.pdf | 8 Aug 2025 |
| Form 2File: 2Form230092023.pdf | 8 Aug 2025 |
| Form 3File: Q2.pdf | 8 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Q2.pdf | 8 Aug 2025 |
| Form 1File: Form1 31122023.pdf | 8 Aug 2025 |
| Form 2File: Form 2 31122023.pdf | 8 Aug 2025 |
| Form 3File: Q3.pdf | 8 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Q3.pdf | 8 Aug 2025 |
| Form 1File: Form1 31032024.pdf | 8 Aug 2025 |
| Form 2File: Form 2 31032024.pdf | 8 Aug 2025 |
| Form 3File: Q4.pdf | 8 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Q4.pdf | 8 Aug 2025 |
| Form 1File: FORM1Q4FY2425.pdf | 8 Aug 2025 |
| Form 2File: FORM2Q4FY2425.pdf | 8 Aug 2025 |
| Form 3File: FORM3Q4FY2425.pdf | 8 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: UIQ4FY2425.pdf | 8 Aug 2025 |
| Form 1File: 1Form1Q1FY2526ShivMaan.pdf | 8 Aug 2025 |
| Form 2File: 2Form2Q1FY2526ShivNaman.pdf | 8 Aug 2025 |
| Form 3File: 3Form3Q1FY2526ShivMaan.pdf | 8 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: UIQ1FY2526.pdf | 8 Aug 2025 |
| Form 2A (FY 2023-2024)File: Form 2A 31032024.pdf | 8 Aug 2025 |
| Form 1File: FORM1Q3FY2425.pdf | 4 Jul 2025 |
| Form 2File: FORM2Q3FY2425.pdf | 4 Jul 2025 |
| Form 3File: FORM3Q3FY2425.pdf | 4 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Q3FY2425.pdf | 4 Jul 2025 |
| OthersFile: FORM2AQ3FY2425.pdf | 4 Jul 2025 |
| Form 1File: Form1 30092024.pdf | 4 Jul 2025 |
| Form 2File: Form2 30092024.pdf | 4 Jul 2025 |
| Form 3File: Form3Q2FY2425.pdf | 4 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Q2FY2425.pdf | 4 Jul 2025 |
| OthersFile: Form5 30092024.pdf | 4 Jul 2025 |
| Form 1File: Form 1.pdf | 4 Jul 2025 |
| Form 2File: Form 2.pdf | 4 Jul 2025 |
| Form 3File: Form 3.pdf | 4 Jul 2025 |
| OthersFile: Form 2A.pdf | 4 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Q1.pdf | 4 Jul 2025 |
| Form 2A (FY 2024-2025)File: FORM2AQ4FY2425.pdf | 4 Jul 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM1Q3FY2425.pdf | 29 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM2Q3FY2425.pdf | 29 Jan 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM2AQ3FY2425.pdf | 29 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1 30092024.pdf | 17 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3Q2FY2425.pdf | 17 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2 30092024.pdf | 17 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Q2FY2425.pdf | 17 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Q3FY2425.pdf | 17 Jan 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form2A 30092024.pdf | 17 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form5 30092024.pdf | 17 Jan 2025 |
| Building plan approvalFile: Updated Plan.pdf | 9 Aug 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Updated Plan.pdf | 9 Aug 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: Updated CC.pdf | 9 Aug 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 9 Aug 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 9 Aug 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A.pdf | 9 Aug 2024 |
| Disclosure of sold/ booked inventoryFile: Q1.pdf | 9 Aug 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf | 9 Aug 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q1.pdf | 7 Jun 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q2.pdf | 7 Jun 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q3.pdf | 7 Jun 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q4.pdf | 7 Jun 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Q3.pdf | 7 Jun 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1 31032024.pdf | 6 Jun 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 31032024.pdf | 6 Jun 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 3Form2A30092023.pdf | 6 Jun 2024 |
| Disclosure of sold/ booked inventoryFile: Q1.pdf | 6 Jun 2024 |
| Disclosure of sold/ booked inventoryFile: Q2.pdf | 6 Jun 2024 |
| Disclosure of sold/ booked inventoryFile: Q3.pdf | 6 Jun 2024 |
| Disclosure of sold/ booked inventoryFile: Q4.pdf | 6 Jun 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1 31122023.pdf | 1 Jun 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 31122023.pdf | 1 Jun 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 3Form2A30062023.pdf | 1 Jun 2024 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Jalgaon
Computed across the 230+ Jalgaon projects on ReraGenie, from their own filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 114 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep SHIV MAAN HEIGHTS on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near JULALSING WADI230+ in Jalgaon
Filed coordinates, straight-line distance. 19 registered projects within 2 km.
SUKRUTI SURATNA
SURATNA INFRA LLP
JK Elegance
JK Elegance
MANNAT HEIGHTS
AJAY SHANTILAL LALWANI
SAMARTHS SUVRUDDHI
Samarth Constrowell Private Limited
ANTARIKSH
SUMEET PRAKASHCHAND MUTHA
MAJESTIQUE LANDMARK
ORNATE PROPERTIES
See every Jalgaon project, with the district possession charts
Builder: JAIN INFRA
JAIN INFRA has 2 registrations on MahaRERA, including GOLD MAPLE and SHIV MAAN HEIGHTS. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Jalgaon district page.
Frequently asked questions
What does it mean that SHIV MAAN HEIGHTS shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if SHIV MAAN HEIGHTS is delayed beyond 31 Mar 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SHIV MAAN HEIGHTS?
The registered promoter entity is JAIN INFRA, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SHIV MAAN HEIGHTS?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SHIV MAAN HEIGHTS?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SHIV MAAN HEIGHTS?
The professionals named in the filing: Architect: ANAND MUKUND; Engineer: HEMANT S CHAVAN; Chartered Accountant: NACHIKET JAKHETIYA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SHIV MAAN HEIGHTS?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback