Home / Browse projects / Jalgaon, Maharashtra / Gokuldas Housing
Gokuldas Housing
RG-MH-75372 · RERA P49900049845 · Last updated on MahaRERA portal: 15 Oct 2025
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 10 months past the filed date
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Jalgaon registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Gokuldas Housing is a Residential / Group Housing project by Gokuldas Housing in Jalgaon, Maharashtra, registered with MahaRERA as P49900049845 on 6 Mar 2023. Possession was promised by 31 Dec 2025 and is now 10 months past that date. 2 of the 8 units on this registration are recorded sold or booked, and 16 of 88 construction stages are filed complete.
At a glance
Project
- NameGokuldas Housing
- TypeResidential / Group Housing
- Location
- Old Shirpur Road
- Indiratai Nagar
- Bhadli Bk
- Jalgaon
- 425107
- Pincode425107
- MapView location on Google Maps (as filed on RERA)
- RERA no.P49900049845
- ReraGenie IDRG-MH-75372
Builder
- NameGokuldas Housing
- Entity typePartnership
- PartnersTejbhan Arun Patil, Kalyani Tejbhan Patil, Sanket Sanjay Jain, Punamchand Gokuldas Jain
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on6 Mar 2023
- Promised completion31 Dec 2025
- Revised completionNone
- Buildings8 building records
- Documents filed80 files
Current status
Figures as on 15 Oct 2025, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Block A | NA | 1 | 1 | 1 | 0 | 1 |
| Block B | NA | 1 | 1 | 1 | 0 | 1 |
| Block C | NA | 1 | 1 | 1 | 0 | 1 |
| Block D | NA | 1 | 1 | 1 | 0 | 1 |
| Block E | NA | 1 | 1 | 1 | 0 | 1 |
| Block F | NA | 1 | 1 | 1 | 0 | 1 |
| Block G | NA | 1 | 1 | 1 | 0 | 1 |
| Block H | NA | 1 | 1 | 1 | 0 | 1 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building8
As on 15 Oct 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
16 of 88 construction stages are filed complete across 8 buildings. The stage furthest along is Slabs of Super Structure, at 50%.
Block A25%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 50% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 30% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Block B25%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 50% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 30% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Block C25%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 50% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 30% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Block D25%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 50% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 30% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Block E25%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 50% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 30% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Block F25%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 50% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 30% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Block G25%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 50% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 30% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Block H25%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 50% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 30% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 15 Oct 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 60% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 60% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 0% |
Parking filed8
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Open Space | Total |
|---|---|---|
| Block A | 1 | 1 |
| Block B | 1 | 1 |
| Block C | 1 | 1 |
| Block D | 1 | 1 |
| Block E | 1 | 1 |
| Block F | 1 | 1 |
| Block G | 1 | 1 |
| Block H | 1 | 1 |
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Block A | NA | Rs 1.58 cr | Rs 1.23 cr |
Certifying professionals and partners7
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Santosh C Baviskar |
| Architect | Santosh C Baaviskar |
| Engineer | Santosh C Baviskar |
| Engineer | Santosh C Baaviskar |
| Chartered Accountant | CA Paresh Sabadra |
| Chartered Accountant | RSPH & Associates |
| Chartered Accountant | P N Sabadra and Associates |
| Partner | Role in project |
|---|---|
| Gokuldas Housing | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 23 Feb 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 7 Feb 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 7 Feb 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 7 Feb 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed80
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: AR - March 25.pdf | 15 Oct 2025 |
| Withdrawal Update Form 1File: AR - March 25.pdf | 15 Oct 2025 |
| Withdrawal Update Form 2File: ER - March 25.pdf | 15 Oct 2025 |
| Withdrawal Update Form 2File: ER - March 25.pdf | 15 Oct 2025 |
| Withdrawal Update Form 3File: CA - March 25 final.pdf | 15 Oct 2025 |
| Withdrawal Update Form 3File: CA - March 25 final.pdf | 15 Oct 2025 |
| Withdrawal Update Form 1File: AR - March 25.pdf | 13 Oct 2025 |
| Withdrawal Update Form 1File: AR - March 25.pdf | 13 Oct 2025 |
| Withdrawal Update Form 1File: AR - March 25.pdf | 13 Oct 2025 |
| Withdrawal Update Form 1File: AR - March 25.pdf | 13 Oct 2025 |
| Withdrawal Update Form 2File: ER - March 25.pdf | 13 Oct 2025 |
| Withdrawal Update Form 2File: ER - March 25.pdf | 13 Oct 2025 |
| Withdrawal Update Form 2File: ER - March 25.pdf | 13 Oct 2025 |
| Withdrawal Update Form 2File: ER - March 25.pdf | 13 Oct 2025 |
| Withdrawal Update Form 3File: CA - March 25 final.pdf | 13 Oct 2025 |
| Withdrawal Update Form 3File: CA - March 25 final.pdf | 13 Oct 2025 |
| Withdrawal Update Form 3File: CA - March 25 final.pdf | 13 Oct 2025 |
| Withdrawal Update Form 3File: CA - March 25 final.pdf | 13 Oct 2025 |
| Form 1File: AR - March 25.pdf | 25 Aug 2025 |
| Form 2File: ER - March 25.pdf | 25 Aug 2025 |
| Form 3File: CA - March 25 final.pdf | 25 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure.pdf | 25 Aug 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure.pdf | 5 May 2025 |
| Other - TechnicalFile: Form 2A.pdf | 5 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AR dec24_compressed.pdf | 20 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final_CA Certificate-Form -Dec 24 (sign).pdf | 20 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final_CA DEC24.pdf | 20 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ER DEC 24.pdf | 20 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure Dec24.pdf | 20 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: DBP -Form 5 sign copy.pdf | 16 Nov 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: DBP - CA Final.pdf | 16 Nov 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: ER Certi sep 24.pdf | 16 Nov 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: ER Certi sep 24.pdf | 16 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AR Certi sep 24.pdf | 16 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: DBP - CA Final.pdf | 16 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AR Certi sep 24.pdf | 16 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: DBP - CA Final.pdf | 16 Nov 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: DBP -Form 5 sign copy.pdf | 16 Nov 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: DBP - CA Final.pdf | 16 Nov 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: ER Certi sep 24.pdf | 16 Nov 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: ER Certi sep 24.pdf | 16 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure.pdf | 29 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AR Certificate - sign final.pdf | 16 Aug 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ER Certificate - sign Final.pdf | 16 Aug 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA - DBP developers Final.pdf | 16 Aug 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure.pdf | 1 Aug 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure.pdf | 28 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Ar Certificate-Sept 23 - converted.pdf | 23 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AR Cer- Dec23 - converted.pdf | 23 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect-March-24 - converted.pdf | 23 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Enginner -Sept-23.pdf | 23 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Enginner -Dec-23.pdf | 23 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Enginner -March-24.pdf | 23 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 2-CA Certificate -Dec23.pdf | 23 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA cert March 2024.pdf | 23 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 1-CA Certificate -Sept23 (1) (1).pdf | 22 May 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A.pdf | 8 May 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure Sold unsold.pdf | 8 May 2024 |
| Proforma of Agreement for saleFile: Gokuldas Housing _Agreement for Sale.pdf | 3 Mar 2023 |
| Deviation Report with respect to model copy of AgreementFile: Devi of AFS_Edited.pdf | 3 Mar 2023 |
| CERSAI detailsFile: CERSAI details.pdf | 2 Mar 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure Merged.pdf | 2 Mar 2023 |
| Copy of the legal title reportFile: Title Report 2 compressed.pdf | 23 Feb 2023 |
| Details of encumbrances concerned to FinanceFile: Legal.pdf | 23 Feb 2023 |
| Details of encumbrances concerned to LegalFile: Legal.pdf | 23 Feb 2023 |
| Layout approvalFile: Building Plan.pdf | 7 Feb 2023 |
| Building plan approvalFile: Building Plan.pdf | 7 Feb 2023 |
| PAN CardFile: Company Pan Card.pdf | 7 Feb 2023 |
| Copy of the legal title reportFile: Title Report.pdf | 7 Feb 2023 |
| Details of encumbrances concerned to FinanceFile: Finance.pdf | 7 Feb 2023 |
| Details of encumbrances concerned to LegalFile: Finance.pdf | 7 Feb 2023 |
| Copy of Layout Approval (in case of layout)File: Building Plan.pdf | 7 Feb 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Building Plan.pdf | 7 Feb 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: Commecment Certificate.pdf | 7 Feb 2023 |
| Declaration about Commencement CertificateFile: Form D.pdf | 7 Feb 2023 |
| Declaration in FORM BFile: Form B (1).pdf | 7 Feb 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_Signed (1).pdf | 7 Feb 2023 |
| Proforma of Allotment letterFile: Allotment (1).pdf | 7 Feb 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Form A.pdf | 7 Feb 2023 |
| Deviation Report with respect to Allotment letterFile: deviation of allotment.pdf | 7 Feb 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Jalgaon
Computed across the 230+ Jalgaon projects on ReraGenie, from their own filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 80 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Gokuldas Housing on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Indiratai Nagar230+ in Jalgaon
RESIDENTIAL LAYOUT G NO 1135
ANIL SUBHAN PATIL
Behede Deshpande Complex
Behede & Deshpande Group
DESHMUKH SANKUL
SAGAR UMAKANT DESHMUKH
Laxman Avenue
Lakshman Daulat Mali
ORANGE CITY
M/S DBP DEVELOPERS
Pankaj Residency
Pankaj Borole
See every Jalgaon project, with the district possession charts
Builder: Gokuldas Housing
Gokuldas Housing has 1 registration on MahaRERA, including Gokuldas Housing. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Jalgaon district page.
Frequently asked questions
What does it mean that Gokuldas Housing shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if Gokuldas Housing is delayed beyond 31 Dec 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Gokuldas Housing?
The registered promoter entity is Gokuldas Housing, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Gokuldas Housing?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Gokuldas Housing?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Gokuldas Housing?
The professionals named in the filing: Architect: Santosh C Baviskar; Architect: Santosh C Baaviskar; Engineer: Santosh C Baviskar; Engineer: Santosh C Baaviskar; Chartered Accountant: CA Paresh Sabadra; Chartered Accountant: RSPH & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Gokuldas Housing?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback