Home / Browse projects / Dakshina Kannada, Karnataka / ZORION

Registration approved Residential/Group Housing project

ZORION

By AASHIRWAD INFRA DEVELOPERS

RG-KA-67944 · RERA PRM/KA/RERA/1257/334/PR/171201/001683

Source: official RERA Karnataka filing

Red flags

  • Completion date moved by 12 months
  • 2 extensions taken

Clear

  • No complaints on record
  • Separate project account declared
Mar 2020Possession promisedmoved 12 months from the original
0Complaints at RERA Karnatakaon this registration
Jump to the 50 documents Report an error

ZORION is a Residential/Group Housing project by AASHIRWAD INFRA DEVELOPERS in Dakshina Kannada, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1257/334/PR/171201/001683 on 1 Dec 2017. Possession is promised by 31 Mar 2020. The completion date has moved by 12 months from the original filing.

At a glance

Project

  • NameZORION
  • TypeResidential/Group Housing
  • Location
    • Mangalore
    • Dakshina Kannada
  • PincodeNot stated
  • RERA no.PRM/KA/RERA/1257/334/PR/171201/001683
  • ReraGenie IDRG-KA-67944

Builder

  • NameAASHIRWAD INFRA DEVELOPERS
  • Entity typePartnership Firm
  • Authorized SignatoryP Krishnaraja Mayya
  • Other registrations1 more →

Key dates

this monthRegisteredDec 2017First promiseMar 2019Revised toMar 2020

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on1 Dec 2017
  • Promised completion31 Mar 2020
  • Revised completionRevised to 31 Mar 2020 (originally 31 Mar 2019)
  • Buildings1 building record
  • Documents filed50 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Zorion---45045

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Retaining wall (All types)Not applicable
Plinth level Beam-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)Not applicable
RCC or MS Framed structure-
Masonry construction: Bricks, Concrete blocks etc-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Fire prevention and fire fighting fitting and fixture with network-
Weather Proof work(tile,concrete)Not applicable
Painting-
Elevation workNot applicable
Internal and External work including landscapes as per santioned drawingsNot applicable

Progress on shared amenities41

Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Internal Roads & FootpathsNoNot applicable
Sewage and Drainage SystemYes-
Parks & Tree plantingNoNot applicable
Street LightingNoNot applicable
Provision for community buildings and for treatment and disposal of sewage and sullage waterNoNot applicable
Solid waste management and disposalNoNot applicable
Water conservationYes-
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Education/Health/Other public amenitiesYes-
Electricity supply transformer and substationYes-
Emergency Evacuation servicesNoNot applicable
Storm water drainsYes-
Use of renewable energyNoNot applicable
Water conservation/rain water harvesting/recharge of ground waterYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceNoNot applicable
Club HouseNoNot applicable
Community HallNoNot applicable
Outdoor Sports facilityYes-
Indoor Sports facilityNoNot applicable
Swimming PoolNoNot applicable
GymNoNot applicable
ParksNoNot applicable
Power BackupYes-
GasYes-
Water and SanitationNoNot applicable
Air Conditioning And incerntionNoNot applicable
StaircasesYes-
LiftsYes-
Staircases and Lift lobbies, corridor,lobbies, corridorYes-
Fire escapesNoNot applicable
Common entrance and exit for the building / common portico/foyer/verandahYes-
BasementNoNot applicable
TerraceYes-
Outer WallNoNot applicable
Open parking areas and common storage spacesNoNot applicable
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyNoNot applicable

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,872 sq m
Named landownersNone

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 8.88 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectM R Consultancy
EngineerK Anil Hegde

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

ExtensionMar 2019 → Dec 2020

No reason recorded in the filing

EX/PRM/KA/RERA/1257/334/PR/200226/001683Dec 2020 → Mar 2020

Reason as filed by the promoterShortage of Building Materials, Concrete, Jalli etc

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed50

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1257/334/PR/171201/001683 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
CertificateFile: REGISTRATION.PDF-
Architect Certificate for Work Completion Schedule till DateFile: Arc-Status-Zor.PDF-
Engineer Certificate for Work Completion Schedule till DateFile: Engr-Pending Zor.PDF-
CA Certificate for Funds UtilizationFile: Fund Utilization Certificate.PDF-
Architect Certificate for Pending Work Completion Schedule.File: Arc-Pending-Zor.PDF-
Engineer Certificate for Pending Work Completion Schedule.File: Engr-Pending Zor.PDF-
CA Certificate for Funds required for Project CompletionFile: Pro Ext-Fund Req.PDF-
AffidavitFile: AFFIVDAVIT-ZORION.PDF-
Latest Encumbrance CertificateFile: EC -Zor.PDF-
Consent letter from 2/3rd of AllotteesFile: Consent Letter.pdf-
Details Of Sold/ Un-sold UnitsFile: SoldUnsoldDetails (3).xlsx-
Document 1File: AFFIDAVIT-18.PDF-
Document 2File: Statement - Zorion.pdf-
Document 3File: Form-B Ext.PDF-
Document 4File: Zorion -Neft.pdf-
Document 5File: AFFIDAVIT- Rera.pdf-
Commecement-
Approved_Plan-
Approved_Plan-
Sale Deed-
Land resize-
Section_Plan-
Approved_Plan-
zorion-brochure-
NOC-
PROJECT SPECIFICATION-
EC-
khata registration-
JDA-
conversion zorian-
Balance Sheet 2015 - 2016File: BS16-17.PDF-
Balance Sheet 2014 - 2015File: BS15-16.PDF-
Balance Sheet 2013 - 2014File: BS14-15.PDF-
Audited Profit and Loss Statement 2015 - 2016File: P&L16-17.PDF-
Audited Profit and Loss Statement 2014 - 2015File: P&L15-16.PDF-
Audited Profit and Loss Statement 2013 - 2014File: P&L14-15.PDF-
Director's Report 2015 - 2016File: DIRECTORS REPORT 16-17.PDF-
Director's Report 2014 - 2015File: DIRECTORS REPORT 15-16.PDF-
Director's Report 2013 - 2014File: DIRECTORS REPORT 14-15.PDF-
Cash Flow Statement 2015 - 2016File: CASH FLOW 16-17.PDF-
Cash Flow Statement 2014 - 2015File: CASH FLOW 15-16.PDF-
Auditor's Report 2015 - 2016File: AUDITORS RREPORT 16-17.PDF-
Auditor's Report 2014 - 2015File: AUDITORS REPORT 15-16.PDF-
Auditor's Report 2013 - 2014File: AUDITORS REPORT 14-15.PDF-
Income Tax Return Acknowledgement 2015 - 2016File: IT RETURN 17-18.PDF-
Income Tax Return Acknowledgement 2014 - 2015File: IT RETURN 16-17.PDF-
Income Tax Return Acknowledgement 2013 - 2014File: IT RETURN 15-16.PDF-
ZORION FORM B-
Prospectus/BrochureFile: zorion-brochure.pdf-
Tower Excel SheetFile: Zorion UPLOAD.xlsx-

How this compares with Dakshina Kannada

30%of Dakshina Kannada projects moved their completion datethis one moved by 12 months
0%of Dakshina Kannada registrations are shown as withdrawn or revokedthis one is not

Computed across the 620+ Dakshina Kannada projects on ReraGenie, from their own filings.

Keep ZORION on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Dakshina Kannada620+ in Dakshina Kannada

Builder: AASHIRWAD INFRA DEVELOPERS

AASHIRWAD INFRA DEVELOPERS has 2 registrations on RERA Karnataka, including ZORION and DVARAKA ENCLAVE. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Dakshina Kannada district page.

Frequently asked questions

What are my rights if ZORION is delayed beyond 31 Mar 2020?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of ZORION?

The registered promoter entity is AASHIRWAD INFRA DEVELOPERS, a partnership firm as per the filing. Neither this filing nor this promoter's other RERA Karnataka registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in ZORION?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at ZORION?

The professionals named in the filing: Architect: M R Consultancy; Engineer: K Anil Hegde. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ZORION?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ZORION. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ZORION to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.