ReraGenieLog inGet a buyer report

Home / Browse projects / Raigarh, Maharashtra / Zenisha Aura

Registered No litigation declared Others project

Zenisha Aura

By Zenisha Infra

RG-MH-83003 · RERA P52000048498 · Last updated on MahaRERA portal: 14 Jul 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
4 of 11Construction stages donefurthest along: Slabs of Super Structure, 86%
0Complaints at MahaRERAon this registration
Jump to the 75 documents Report an error

Zenisha Aura is a Others project by Zenisha Infra in Raigarh, Maharashtra, registered with MahaRERA as P52000048498 on 3 Jan 2023. Possession is promised by 31 Dec 2027.

At a glance

Project

  • NameZenisha Aura
  • TypeOthers
  • Location
    • Sector - 07
    • Pushpak Nagar
    • Panvel
    • Dapoli
    • Panvel
    • Raigarh
    • 410206
  • Pincode410206
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000048498
  • ReraGenie IDRG-MH-83003

Builder

  • NameZenisha Infra
  • Entity typePartnership
  • PartnersBharat Karman Arethia, Vasaram Bhoja Rajput
  • Other registrations1 more →

Key dates

this monthRegisteredJan 2023PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on3 Jan 2023
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed75 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Zenisha AuraNA1612000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 14 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 86%.

Zenisha Aura: 52% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure86%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises14%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks72%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 14 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed116

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots116
Closed/Covered64
Open Space52

Land and ownership13

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,919 sq m
Land owned byThe promoter, with other names on the file
Named landowners13
LandownerVillageDistrict
Gajanan Dattu MhatrePargaonRaigarh
Krishna Dattu MhatreNew PanvelRaigarh
Hemant Dattu MhatrePanvelRaigarh
Kalavati Maruti MhatrePanvelRaigarh
Sandesh Maruti MhatrePanvelRaigarh
Samir Namdev MhatrePargaonRaigarh
Padubai Namdev MhatrePargaonRaigarh
Sankita Maruti MhatreDevichapadaRaigarh
Anant Namdeo MhatrePanvelRaigarh
Anandi Namdev TarekarPargaonRaigarh
Suvarna Namdeo PatilPanvelRaigarh
Sumitra Chandrakant PawashePanvelRaigarh
Sunita Vithal PatilPanvelRaigarh

Approvals and building plan

Sanctioning authorityCity and Industrial Development Corporation of Maharashtra
Permissible FSI7772.86
Proposed, not sanctioned6,169 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchShop No 25 - 28, Sector 7, Mumbai - 400703

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDestination Architecture Interior Designs
EngineerSK Consultants & Engineers
Chartered AccountantNB Sayed & Associates
Chartered AccountantVikas Abhang & Associates
Chartered AccountantGaurav S. Rajpal & Co.
PartnerRole in project
Zenisha Infra-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 7 Dec 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 3 Dec 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 3 Dec 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 3 Dec 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed75

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Form 1 - June 26 Zenisha Aura.pdf14 Jul 2026
Form 2File: Zenisha_Aura_Form2_Q1_2026-27_14-07-2026_06-15.pdf14 Jul 2026
Form 3File: Zenisha_Aura_Form3_Q1_2026-27_13-07-2026_14-45_doc1.pdf14 Jul 2026
Disclosure of Sold and Booked InventoryFile: Circular 29 - Zenisha Aura as on June 2026.pdf14 Jul 2026
Form 1File: Form 1 - Zenisha Aura as on Sep 2025.pdf17 May 2026
Form 2File: Form 2 - Zenisha Aura as on Dec 2025.pdf17 May 2026
Form 3File: Form 3 - Zenisha Aura as on 30-06-2025.pdf17 May 2026
Disclosure of Sold and Booked InventoryFile: Circular 29 - Zenisha Aura as on June 2025.pdf17 May 2026
Form 1File: Form 1 - Zenisha Aura as on Sep 2025.pdf16 May 2026
Form 2File: Form 2 - Zenisha Aura as on Dec 2025.pdf16 May 2026
Form 3File: Form 3 - Zenisha Aura as on 30-09-2025.pdf16 May 2026
Disclosure of Sold and Booked InventoryFile: Circular 29 - Zenisha Aura as on 30-09-2025.pdf16 May 2026
Form 1File: Form 1 - Zenisha Aura as on Dec 2025.pdf14 May 2026
Form 2File: Form 2 - Zenisha Aura as on Dec 2025.pdf14 May 2026
Form 3File: Form 3 - Zenisha Aura as on Dec 2025.pdf14 May 2026
Disclosure of Sold and Booked InventoryFile: Circular 29 - Zenisha Aura as on Dec 2025.pdf14 May 2026
Form 1File: Form 1 - Zenisha Aura as on March 2026.pdf14 May 2026
Form 2File: Form 2 - Zenisha Aura as on March 2026.pdf14 May 2026
Form 3File: Form 3 - Zenisha Aura as on March 2026.pdf14 May 2026
Disclosure of Sold and Booked InventoryFile: Circular 29 - Zenisha Aura as on March 2026.pdf14 May 2026
Form 5 (FY 2022-2023)File: Form 5 - Zenisha Aura as on FY 22-23.pdf30 Dec 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Zenisha Aura as on March 2025.pdf5 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Zenisha Aura as on Dec 2024.pdf11 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Zenisha Aura as on 30-09-2024.pdf6 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Zenisha Aura as on 31-12-2024.pdf6 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Zenisha Aura as on 30-09-2024.pdf6 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Zenisha Aura as on 31-12-2024.pdf6 Mar 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 - Zenisha Aura - FY 2023-24.pdf6 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Zenisha Aura as on 31-12-2024.pdf18 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Zenisha Aura as on 31-12-2024.pdf18 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Zenisha Aura as on Sep 24.pdf12 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Zenisha Aura as on June 2024.pdf19 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Zenisha Aura as on 30-06-2024.pdf19 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Zenisha Aura as on March 2024.pdf10 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Zenisha Aura as on 31-03-2024.pdf10 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Zenisha Aura as on Dec 2023.pdf16 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Zenisha Aura as on Dec 2023.pdf6 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Zenisha Aura as on Dec 2023.pdf6 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A - Zenisha Aura.pdf30 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: New Format Form 5 Zenisha Aura.pdf30 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Zenisha Aura -March 2023_compressed.pdf27 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Zenisha Aura - June 2023_compressed.pdf27 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Zenisha Aura - Sept 2023_compressed.pdf27 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Zenisha Aura as on March 2023.pdf26 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Zenisha Aura as on June 2023.pdf26 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf26 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Zenisha Aura as on 30-09-2023.pdf23 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Zenisha Aura as on 30-09-2023.pdf20 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Zenisha Aura .pdf13 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Zenisha Aura as on March 2023.pdf21 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Zenisha Aura as on June 2023.pdf21 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Zenisha Aura as on 31-03-2023.pdf21 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Zenisha Aura as on 30-06-2023.pdf21 Sep 2023
Details of encumbrances concerned to FinanceFile: Encumbrance Finance -Zenisha.pdf14 Dec 2022
Details of encumbrances concerned to LegalFile: Encumbrance Finance -Zenisha.pdf14 Dec 2022
CERSAI detailsFile: CERSAI_Search_Report_200254770792_For_Asset_Based_Search_14_12_2022_15_28_59_857.pdf14 Dec 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A -Zenisha - Copy.pdf14 Dec 2022
Copy of the legal title reportFile: Short Title - zenisha Aura_11zon.pdf7 Dec 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: organized (42).pdf7 Dec 2022
Details of encumbrances concerned to FinanceFile: Encumbrance Finance -Zenisha.pdf6 Dec 2022
Details of encumbrances concerned to FinanceFile: Encumbrance Legal -Zenisha.pdf6 Dec 2022
Details of encumbrances concerned to LegalFile: Encumbrance Finance -Zenisha.pdf6 Dec 2022
Details of encumbrances concerned to LegalFile: Encumbrance Legal -Zenisha.pdf6 Dec 2022
Declaration about Commencement CertificateFile: Format D -Zenisha.pdf6 Dec 2022
Declaration in FORM BFile: Zenisha -Promoter Form B.pdf6 Dec 2022
Proforma of Allotment letterFile: Allotment Letter _ Zenisha Infra_Zenisha aura_03122022 FILE 1889.pdf6 Dec 2022
Proforma of Agreement for saleFile: AFS_Zenisha Infra_Zenisha aura_03122022_FILE 1889.pdf6 Dec 2022
Deviation Report with respect to Allotment letterFile: Deviation Allotment -Zenisha.pdf6 Dec 2022
Deviation Report with respect to model copy of AgreementFile: Deviation Agreement -Zenisha.pdf6 Dec 2022
Layout approvalFile: CC DWG -1_compressed.pdf3 Dec 2022
Building plan approvalFile: CC DWG -1_compressed.pdf3 Dec 2022
PAN CardFile: 1 PAN Card.pdf3 Dec 2022
Copy of Layout Approval (in case of layout)File: CC DWG -1_compressed.pdf3 Dec 2022
Building Plan Approval / NA Order for plotted developmentFile: CC DWG -1_compressed.pdf3 Dec 2022
Commencement Certificates / NA Order for plotted developmentFile: CC COPY -1 .pdf3 Dec 2022

How this compares with Raigarh

20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is on the register

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Zenisha Aura on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Pushpak Nagar, Panvel5,900+ in Raigarh

2 kmZenisha AuraCompleted 14Lapsed / revoked 15Other 114Dot size: filed unitsN

Filed coordinates, straight-line distance. 143 registered projects within 2 km.

Builder: Zenisha Infra

Zenisha Infra has 2 registrations on MahaRERA, including Zenisha Luxuria and Zenisha Aura. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if Zenisha Aura is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Zenisha Aura?

The registered promoter entity is Zenisha Infra, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Zenisha Aura?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Zenisha Aura?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Zenisha Aura?

The professionals named in the filing: Architect: Destination Architecture Interior Designs; Engineer: SK Consultants & Engineers; Chartered Accountant: NB Sayed & Associates; Chartered Accountant: Vikas Abhang & Associates; Chartered Accountant: Gaurav S. Rajpal & Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Zenisha Aura?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Zenisha Aura. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Zenisha Aura to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.