Home / Browse projects / Mumbai Suburban, Maharashtra / Yura Business Park
Yura Business Park
By Yura Business Park Private Limited
RG-MH-25213 · RERA P51800005547 · Last updated on MahaRERA portal: 20 May 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Completion date moved by 72 months
- 1 extension taken
- Rs 65.00 crore secured on the land, in favour of BEACONTRUSTEESHIPLIMITED
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Yura Business Park is a Commercial project by Yura Business Park Private Limited in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800005547 on 11 Aug 2017. Possession is promised by 31 Dec 2027. The completion date has moved by 72 months from the original filing. 53 of the 59 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.
At a glance
Project
- NameYura Business Park
- TypeCommercial
- Location
- ANDHERI VERSOVA LINK ROAD
- ANDHERI WEST
- Andheri
- Mumbai Suburban
- 400058
- Pincode400058
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800005547
- ReraGenie IDRG-MH-25213
Builder
- NameYura Business Park Private Limited
- Entity typeCompany
- CINU45200MH1994PTC080038
- GSTIN27AAACM3795K1Z1
- CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
- DirectorsRohit Ramswaroop Garodia, Kitam Pravin Ranka
- Other registrations1 more →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on11 Aug 2017
- Promised completion31 Dec 2027
- Revised completionRevised to 31 Dec 2027 (originally 30 Dec 2021)
- Buildings1 building record
- Documents filed100 files
Current status
Figures as on 20 May 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Yura Building No 1 | NA | 8 | 4 | 0 | 59 | 59 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 20 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
4 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 10%.
Yura Building No 1: 37% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 10% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 20 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Land and ownership
A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Yura Building No 1 | NA | Rs 41.90 cr | Rs 39.66 cr |
| - | NA | Rs 2.00 cr | - |
Certifying professionals and partners8
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | arun gurav |
| Architect | Skyline Inframart Consultants LLP |
| Engineer | AHMEDA ALI MASUM ALI SAYED |
| Engineer | MOHD SOHEB RANGILA |
| Engineer | omprakash purohit |
| Engineer | Venturx Project Services LLP |
| Chartered Accountant | UDAYKUMAR PUROHIT |
| Chartered Accountant | KPMR & Co |
| Partner | Role in project |
|---|---|
| Yura Business Park Private Limited | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterSir, We, Yura Business Park Private Limited, the New Promoter appointed under order dated 17/05/2023 passed by National Company Law Tribunal (NCLT), hereby apply for extension, u/s 7(3), of the registered project Yura Business Park bearing no P51800005547, until date 31/12/2026. As prescribed under circular no 07/2019 dated 8 Feb 2019, the consent of two-thirds of the allottees is not applicable in this case as no sales have been done in the project. The said changes are being proposed by the new promoter whose appointment has been confirmed by MahaRERA Authority vide its order dated 29/12/202
Litigation declared2
| Case | Court | Status |
|---|---|---|
| 365/2015 | Bombay High Court | Pending |
| 213/2019 | Bombay High Court | Pending |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 28 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 2 Feb 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 2 Feb 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 2 Feb 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2027
Documents filed100
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 100 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Architect.pdf | 20 May 2026 |
| Withdrawal Update Form 2File: Engineer.pdf | 20 May 2026 |
| Withdrawal Update Form 3File: CA.pdf | 20 May 2026 |
| Withdrawal Update Form 1File: Form-1 (Architect Certificate-Phase 1) Wing AB.pdf | 11 Feb 2026 |
| Withdrawal Update Form 2File: form 2 (engineer certificate) P1.pdf | 11 Feb 2026 |
| Withdrawal Update Form 3File: FORM 3_upto Dec 25_P1.pdf | 11 Feb 2026 |
| Withdrawal Update Form 1File: Form 1 Architect Certificate Phase 1.pdf | 3 Dec 2025 |
| Withdrawal Update Form 2File: Form 2 Engineer Certificate Sep-25 Phase 1.pdf | 3 Dec 2025 |
| Withdrawal Update Form 3File: form 3.pdf | 3 Dec 2025 |
| Withdrawal Update Form 1File: Architect certificate - 30062025.pdf | 11 Nov 2025 |
| Withdrawal Update Form 2File: Engineer certificate - 21072025pdf.pdf | 11 Nov 2025 |
| Withdrawal Update Form 3File: CA certificate - 21072025.pdf | 11 Nov 2025 |
| Form 5 (FY 2024-2025)File: form 5 (CA certificate) P1.pdf | 30 Sep 2025 |
| Form 2A (FY 2024-2025)File: Form 2A Engineer Certificate Phase 1.pdf | 24 Sep 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Yura Phase 1 Engineer certificate.pdf | 25 Apr 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect's certificate.pdf | 23 Apr 2025 |
| Certificates of CA (Form 3)File: Yura Phase 1 CA certificate.pdf | 23 Apr 2025 |
| Certificates of CA (Form 3)File: Yura Phase 1 CA certificate.pdf | 23 Apr 2025 |
| Details of encumbrances concerned to FinanceFile: Encumbrance Declaration dated - 23-01-25.pdf | 24 Jan 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect's Certificate Dec 2024.pdf | 24 Jan 2025 |
| Certificates of CA (Form 3)File: CA Certificate Dec 2024.pdf | 24 Jan 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer's Certificate Dec 2024.pdf | 24 Jan 2025 |
| CERSAI detailsFile: Yura CERSAI- DTDM (1).pdf | 24 Jan 2025 |
| Details of encumbrances concerned to LegalFile: Encumbrance Declaration dated - 23-01-25.pdf | 24 Jan 2025 |
| Certificates of CA (Form 3)File: CA Certificate_Sep 2024 revised.pdf | 21 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory Disclosure_Sept 2024.pdf | 20 Dec 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1.pdf | 21 Oct 2024 |
| Certificates of CA (Form 3)File: form 3.pdf | 21 Oct 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2.pdf | 21 Oct 2024 |
| Proforma of Agreement for saleFile: Yura - Final Agreement For Sale Draft - Wing A,B.pdf | 14 Aug 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: YBPPL Architect Certificate Form 1 - June 2024.pdf | 17 Jul 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: YBPPL Engineer Certificate Form 2 - June 2024.pdf | 17 Jul 2024 |
| Certificates of CA (Form 3)File: YBPPL CA Certificate Form 3 - June 2024.pdf | 17 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Site Supervisor Certificate - March 2024.pdf | 3 May 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate - March 2024.pdf | 19 Apr 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate - March 2024.pdf | 19 Apr 2024 |
| Certificates of CA (Form 3)File: Form - 3 CA certificate March 2024.pdf | 19 Apr 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: 2 Certificates of CA (Form 5).pdf | 29 Feb 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of sold units.pdf | 22 Feb 2024 |
| Certificates of CA (Form 3)File: 1 Estimate Cost Details.pdf | 22 Feb 2024 |
| Proforma of Agreement for saleFile: Yura Agreement for Sale.pdf | 22 Feb 2024 |
| Proforma of Allotment letterFile: Yura Allotment Letter.pdf | 22 Feb 2024 |
| Deviation Report with respect to Allotment letterFile: Deviation Report.pdf | 22 Feb 2024 |
| Deviation Report with respect to model copy of AgreementFile: Deviation Report.pdf | 22 Feb 2024 |
| Building plan approvalFile: 20240119_IoA.pdf | 2 Feb 2024 |
| Layout approvalFile: 20240119_IoA Drawing.pdf | 2 Feb 2024 |
| Layout approvalFile: 20240119_IoA Drawing-2.pdf | 2 Feb 2024 |
| Copy of Layout Approval (in case of layout)File: 20240119_IoA Drawing.pdf | 2 Feb 2024 |
| Copy of Layout Approval (in case of layout)File: 20240119_IoA Drawing-2.pdf | 2 Feb 2024 |
| Building Plan Approval (IOD)File: 20240119_IoA.pdf | 2 Feb 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: 20240131_CC.pdf | 2 Feb 2024 |
| Declaration about Commencement CertificateFile: YBP CC Declaration draft.pdf | 23 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: YBP Sold Inventory Disclosure.pdf | 23 Jan 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: RG_Interest in other REO.pdf | 23 Jan 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: KR Interest in other REO.pdf | 23 Jan 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: YBPPL_Bank Account Declaration.pdf | 23 Jan 2024 |
| Details of encumbrancesFile: Encumbrances declaration.pdf | 18 Jan 2024 |
| Details of encumbrances concerned to FinanceFile: Legal encumbrance declaration.pdf | 18 Jan 2024 |
| Details of encumbrances concerned to LegalFile: Legal encumbrance declaration.pdf | 18 Jan 2024 |
| Declaration in FORM BFile: Form B - Revised date of completion.pdf | 18 Jan 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 202306_Ar.pdf | 18 Jan 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 202309_Ar.pdf | 18 Jan 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 202312_Ar.pdf | 18 Jan 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 202306_Er.pdf | 18 Jan 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 202309_Er.pdf | 18 Jan 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 202312_Er.pdf | 18 Jan 2024 |
| CERSAI detailsFile: Undertaking regarding report from CERSAI.pdf | 18 Jan 2024 |
| Certificates of CA (Form 3)File: 202306_CA.pdf | 18 Jan 2024 |
| Certificates of CA (Form 3)File: 202309_CA.pdf | 18 Jan 2024 |
| Certificates of CA (Form 3)File: 202312_CA.pdf | 18 Jan 2024 |
| Certificates of CA (Form 5)File: Form 5_Mayurpankh MArch 19 Final.pdf | 5 Nov 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 31-12-2018-Sunshine Chambers.pdf | 23 Oct 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 31-03-2019-Sunshine Chambers.pdf | 23 Oct 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 30-6-2019-Sunshine Chambers.pdf | 23 Oct 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 31-12-2018-Sunshine Chambers.pdf | 23 Oct 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 30-6-2019-Sunshine Chambers.pdf | 22 Oct 2019 |
| Certificates of CA (Form 3)File: MPPL RERA DEC 18.pdf | 14 Oct 2019 |
| Certificates of CA (Form 3)File: MPPL RERA MAR 19.pdf | 14 Oct 2019 |
| Certificates of CA (Form 3)File: MPPL RERA MAR 19.pdf | 14 Oct 2019 |
| Certificates of CA (Form 5)File: MPPL Form 5.pdf | 22 Jan 2019 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 100 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Yura Business Park on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near ANDHERI WEST6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 347 registered projects within 2 km.
PEARL UNIVERSE
CHANDIWALA ENTERPRISES PRIVATE LIMITED
PRANAMI BLISS
Pranami Neev Realty Limited
Alpine Primo
ALPINE INFRAHEIGHTS LLP
NAMAN HABITAT
SHREE NAMAN DEVELOPERS PVT LTD
Vantage
Rolland Spaces Private Limited
Nasar Enclave Sale Building A and B Wing
M/s. Nasar Associates
See every Mumbai Suburban project, with the district possession charts
Builder: Yura Business Park Private Limited
Yura Business Park Private Limited has 2 registrations on MahaRERA, including Yura Business Park and YURA BUSINESS PARK - PHASE 2. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if Yura Business Park is delayed beyond 31 Dec 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Yura Business Park?
The registered promoter entity is Yura Business Park Private Limited, a company as per the filing. Its CIN U45200MH1994PTC080038 and GSTIN 27AAACM3795K1Z1 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Yura Business Park?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Yura Business Park?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Yura Business Park?
The professionals named in the filing: Architect: arun gurav; Architect: Skyline Inframart Consultants LLP; Engineer: AHMEDA ALI MASUM ALI SAYED; Engineer: MOHD SOHEB RANGILA; Engineer: omprakash purohit; Engineer: Venturx Project Services LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Yura Business Park?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.