Home / Browse projects / Mumbai Suburban, Maharashtra / Alpine Primo
Alpine Primo
RG-MH-30581 · RERA P51800030851 · Last updated on MahaRERA portal: 20 Jun 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- 4 complaints at MahaRERA
- Completion date moved by 24 months
- 2 extensions taken
Clear
- No litigation declared
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Alpine Primo is a Others project by ALPINE INFRAHEIGHTS LLP in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800030851 on 20 Sep 2021. Possession is promised by 31 Dec 2026. The completion date has moved by 24 months from the original filing. 86 of the 219 units on this registration are recorded sold or booked, and 12 of 33 construction stages are filed complete. 4 complaints are on record with the regulator.
At a glance
Project
- NameAlpine Primo
- TypeOthers
- Location
- J P Road & S N Patil Marg
- Andheri West
- Andheri
- Mumbai Suburban
- 400058
- Pincode400058
- RERA no.P51800030851
- ReraGenie IDRG-MH-30581
Builder
- NameALPINE INFRAHEIGHTS LLP
- Entity typePartnership
- PartnersVickash Rajendra Chowdhury, Aniket Rohidas Mhatre
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on20 Sep 2021
- Promised completion31 Dec 2026
- Revised completionRevised to 31 Dec 2026 (originally 31 Dec 2024)
- Buildings3 building records
- Documents filed96 files
Current status
Figures as on 20 Jun 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Alpine Primo -A Wing | NA | 17 | 11 | 54 | 28 | 82 |
| Alpine Primo -B Wing | NA | 17 | 11 | 39 | 18 | 57 |
| Alpine Primo - C Wing | NA | 18 | 12 | 52 | 28 | 80 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building3
As on 20 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
12 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Podiums (if any), at 95%.
Alpine Primo -A Wing76%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 95% |
| Plinth | 100% |
| Stilt Floor | 95% |
| Slabs of Super Structure | 82% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 50% |
| Sanitary Fittings within the flats / premises | 40% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 40% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 30% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Alpine Primo -B Wing76%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 95% |
| Plinth | 100% |
| Stilt Floor | 95% |
| Slabs of Super Structure | 82% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 50% |
| Sanitary Fittings within the flats / premises | 40% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 40% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 30% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Alpine Primo - C Wing76%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 95% |
| Plinth | 100% |
| Stilt Floor | 95% |
| Slabs of Super Structure | 82% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 50% |
| Sanitary Fittings within the flats / premises | 40% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 40% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 30% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 20 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed99
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| Alpine Primo -A Wing | 62 | 62 |
| Alpine Primo -B Wing | 17 | 17 |
| Alpine Primo - C Wing | 20 | 20 |
Land and ownership2
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| Sunil Shopping Centre Co Op Hsg Soc Ltd | Andheri | Mumbai Suburban |
| ALPINE INFRAHEIGHTS LLP | Malad | Mumbai Suburban |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Alpine Primo -A Wing | NA | Rs 59.00 cr | Rs 46.66 cr |
| Alpine Primo -B Wing | NA | Rs 14.33 cr | Rs 10.45 cr |
| Alpine Primo - C Wing | NA | Rs 14.33 cr | Rs 10.45 cr |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Ashim Khatri |
| Engineer | Mohammed Afzal Haque |
| Engineer | Mohammad Shakir Ansari |
| Chartered Accountant | UTSAV MILAN SHAH |
| Chartered Accountant | Avin K Shah & Associates |
| Partner | Role in project |
|---|---|
| ALPINE INFRAHEIGHTS LLP | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterWe understand the importance of adhering to project timelines as per MahaRERA regulations, and we assure you that our team is working diligently to mitigate these challenges. However, in the interest of transparency and to ensure the successful completion of the project in accordance with the quality standards set by MahaRERA, we kindly request an extension of 12 months to the original project completion date.
Reason as filed by the promoterdue to delay in sanctioned plans from concerned authority, therefore there was delay in completing the project, hence we request you to kindly grant us extension for further period of 12 months, so shall we complete and comply with MahaRERA norms.
Complaints filed with MahaRERA4
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC12400893 | Aniket Mhatre | Rishabh Rakesh Yadav | 26/11/2024 |
| CC12601728 | Sandeep Singh | ALPINE INFRAHEIGHTS LLP | 25/03/2026 |
| CC12601868 | Anil Goyal | ALPINE INFRAHEIGHTS LLP | 30/03/2026 |
| CC12604795 | Prabhat Chandra | ALPINE INFRAHEIGHTS LLP | 30/07/2026 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 3 Sep 2021 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 3 Sep 2021 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 27 Nov 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 29 Mar 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2026
Documents filed96
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 96 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: q3 form 1 .pdf | 20 Jun 2026 |
| Withdrawal Update Form 1File: Form 1 Q4 FY 2526 (1).pdf | 20 Jun 2026 |
| Withdrawal Update Form 2File: form 2 q3.pdf | 20 Jun 2026 |
| Withdrawal Update Form 2File: form 2 q4.pdf | 20 Jun 2026 |
| Withdrawal Update Form 3File: FORM 3.pdf | 20 Jun 2026 |
| Withdrawal Update Form 3File: Form 3 Mar-26 Rev.pdf | 20 Jun 2026 |
| Form 2A (FY 2024-2025)File: Form 2A (1).pdf | 27 Dec 2025 |
| Form 2A (FY 2023-2024)File: Form 2A 24.pdf | 27 Dec 2025 |
| Form 5 (FY 2023-2024)File: Form 5 n24.pdf | 27 Dec 2025 |
| Withdrawal Update Form 1File: Form 1 Q1 25-26.pdf | 24 Dec 2025 |
| Withdrawal Update Form 1File: Form 1 FY 25-26.pdf | 24 Dec 2025 |
| Withdrawal Update Form 2File: Form 2 Q1 25-26.pdf | 24 Dec 2025 |
| Withdrawal Update Form 2File: Form 2 25-26.pdf | 24 Dec 2025 |
| Withdrawal Update Form 3File: Form 3 Q1 25-26.pdf | 24 Dec 2025 |
| Withdrawal Update Form 3File: Form 3 FY 25-26.pdf | 24 Dec 2025 |
| Form 5 (FY 2024-2025)File: Form 5 FY 24-25.pdf | 22 Dec 2025 |
| Form 1File: Form 2 Q1 2025.pdf | 15 Jul 2025 |
| Form 2File: Form 2 Q1 2025.pdf | 15 Jul 2025 |
| Form 3File: Form 3 Q1 2025.pdf | 15 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Unsold Inventory Q1 2025.pdf | 15 Jul 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 19 Mar 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Dec 2024.pdf | 19 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Dec 2024.pdf | 19 Mar 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory.pdf | 19 Mar 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q2.pdf | 6 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q3.pdf | 6 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Q2 24.pdf | 6 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Q3 24.pdf | 6 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q2.pdf | 6 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q3 2024.pdf | 6 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: Sold n Unsold Inventory Q2.pdf | 6 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory List Q3.pdf | 6 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 27 Jun 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A.pdf | 27 Jun 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory.pdf | 27 Jun 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Discloser Annexure A Mr VIckash Chowdhury.pdf | 27 Jun 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Discloser Annexure A Mr Aniket Mhatre.pdf | 27 Jun 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5.pdf | 27 Jun 2024 |
| Proforma of Agreement for saleFile: Draft of Agreement for Sale.pdf | 27 Jun 2024 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: Registration Certificate.pdf | 27 Jun 2024 |
| Deviation Report with respect to Allotment letterFile: Deviation Report With Respect to Allotment Letter.pdf | 27 Jun 2024 |
| Deviation Report with respect to model copy of AgreementFile: Deviation Report With Respect to Allotment Letter.pdf | 27 Jun 2024 |
| Deviation Report with respect to model copy of AgreementFile: Deviation Report With Respect to Agreement For Sa.pdf | 27 Jun 2024 |
| Declaration in FORM BFile: FORM B Affidavit cum Declarationcompressed.pdf | 18 Jun 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer.pdf | 7 May 2024 |
| Disclosure of sold/ booked inventoryFile: sold unsold inventories.pdf | 7 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 31 12 2023.pdf | 7 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 31 03 24.pdf | 7 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 31 12 2023.pdf | 7 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 31 03 24.pdf | 7 May 2024 |
| Status of ConveyanceFile: Conveyance.pdf | 12 Apr 2024 |
| Details of encumbrances concerned to FinanceFile: Non Encumbrance certificate.pdf | 8 Apr 2024 |
| Details of encumbrances concerned to LegalFile: Non Encumbrance certificate.pdf | 8 Apr 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5.pdf | 8 Apr 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration separate bank.pdf | 8 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: sold unsold Inventory.pdf | 4 Apr 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: Further CC.pdf | 29 Mar 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: Further CC.pdf | 29 Mar 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate.pdf | 29 Mar 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 29 Mar 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate.pdf | 20 Mar 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer’s certificate .pdf | 20 Mar 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 - Signed (1).pdf | 13 Mar 2024 |
| Disclosure of sold/ booked inventoryFile: sold unsold.pdf | 2 Feb 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A as on 31st March 2022.pdf | 17 Jan 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A as on 31st March 2023.pdf | 17 Jan 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 -Alpine - Signed (1).pdf | 28 Dec 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf | 7 Dec 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf | 7 Dec 2023 |
| Building plan approvalFile: Building Plan upto 4th Flooe.pdf | 27 Nov 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Building Plan upto 4th Flooe.pdf | 27 Nov 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: CC upto 4th floor.pdf | 20 Nov 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1795 RERA CERTIFICATE 31072023.pdf | 1 Aug 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_compressed.pdf | 3 May 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Alpine (2).pdf | 2 May 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1795 RERA CERTIFICATE.pdf | 26 Apr 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 Signed_compressed.pdf | 26 Apr 2023 |
| PAN CardFile: Alpine Infra Heights LLP Pan Card.pdf | 13 Feb 2023 |
| CERSAI detailsFile: Alpine Primo.pdf | 24 May 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Alpine Primo - 31 Dec 2021.pdf | 23 May 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- All 96 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Alpine Primo on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Andheri West6,700+ in Mumbai Suburban
PEARL UNIVERSE
CHANDIWALA ENTERPRISES PRIVATE LIMITED
PRANAMI BLISS
Pranami Neev Realty Limited
NAMAN HABITAT
SHREE NAMAN DEVELOPERS PVT LTD
Vantage
Rolland Spaces Private Limited
Nasar Enclave Sale Building A and B Wing
M/s. Nasar Associates
Romell Asrava
ROMELL REALTOR DEVELOPERS PRIVATE LIMITED
See every Mumbai Suburban project, with the district possession charts
Builder: ALPINE INFRAHEIGHTS LLP
ALPINE INFRAHEIGHTS LLP has 1 registration on MahaRERA, including Alpine Primo. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if Alpine Primo is delayed beyond 31 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Alpine Primo?
The registered promoter entity is ALPINE INFRAHEIGHTS LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Alpine Primo?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Alpine Primo?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Alpine Primo?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Alpine Primo?
The professionals named in the filing: Architect: Ashim Khatri; Engineer: Mohammed Afzal Haque; Engineer: Mohammad Shakir Ansari; Chartered Accountant: UTSAV MILAN SHAH; Chartered Accountant: Avin K Shah & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Alpine Primo?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback