Home / Browse projects / Mumbai Suburban, Maharashtra / PRANAMI BLISS

Registered No litigation declared Residential / Group Housing project

PRANAMI BLISS

By Pranami Neev Realty Limited

RG-MH-17638 · RERA P51800077150 · Last updated on MahaRERA portal: 14 Apr 2026

Source: official MahaRERA filing

Red flags

  • Rs 20.00 crore secured on the land, in favour of Tourism Finance Corporation of India Limited

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Apr 2027Possession promisedno revision filed
2 of 11Construction stages donefurthest along: Slabs of Super Structure, 60%
135 of 234Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 94 documents Report an error

PRANAMI BLISS is a Residential / Group Housing project by Pranami Neev Realty Limited in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800077150 on 23 Jul 2024. Possession is promised by 15 Apr 2027. 99 of the 234 units on this registration are recorded sold or booked, and 2 of 11 construction stages are filed complete.

At a glance

Project

  • NamePRANAMI BLISS
  • TypeResidential / Group Housing
  • Location
    • Veera Desai Road
    • Azad Nagar 3
    • Ambivali
    • Andheri
    • Mumbai Suburban
    • 400058
  • Pincode400058
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800077150
  • ReraGenie IDRG-MH-17638

Builder

  • NamePranami Neev Realty Limited
  • Entity typeCompany
  • DirectorSundeep Radheshyam Poddar
  • Declared earlier projects1 →

Key dates

this monthRegisteredJul 2024PromisedApr 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on23 Jul 2024
  • Promised completion15 Apr 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed94 files

Current status

42%99 of 234 units booked

Figures as on 14 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Pranami BlissNA20192340234

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 14 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

2 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 60%.

Pranami Bliss: 25% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)100%
Plinth0%
Stilt Floor0%
Slabs of Super Structure60%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises10%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 14 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed54

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots54
Closed/Covered54

Land and ownership2

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area1,675 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
Encumbrance on the landDeclared present
Charge in favour ofTourism Finance Corporation of India Limited
Secured amountRs 20.00 crore
CERSAI search filedYes
Declared on19 Jul 2025
LandownerVillageDistrict
Azad Nagar Himalaya CHS Ltd.AmbivaliMumbai Suburban
Lotus Logistics and Developers Private LimitedAndheriMumbai Suburban

Approvals and building plan

Sanctioning authorityMHADA
Permissible FSI13953.45
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch215, FREE PRESS HOUSE, ICICI Bank Ltd, Free Press Marg, Nariman Point, Mumbai, Maharashtra 400021

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectA plus Architects plus Planners
EngineerNexus Project Solutions Pvt Ltd
Chartered AccountantVinod Gowadia
PartnerRole in project
Pranami Neev Realty Limited-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 11 Mar 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 25 Apr 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 25 Apr 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 11 Feb 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 15 Apr 2027

Documents filed94

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 94 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Form 1 Architect Cert March 26.pdf14 Apr 2026
Form 2File: Form 2 Engineers Cert March 26.pdf14 Apr 2026
Form 3File: Form 3 CA Cert March 26.pdf14 Apr 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold inventory Doc march 26.pdf14 Apr 2026
Form 1File: Form 1 Pranami Bliss Dec 2025.pdf20 Jan 2026
Form 2File: Form 2 RERA Certificate.pdf20 Jan 2026
Form 3File: Form 3 CA certificate of Dec25.pdf20 Jan 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold and Unsold Inventory Dec 25.pdf20 Jan 2026
Form 1File: Form 1 Arch Cert Sept 25.pdf18 Oct 2025
Form 2File: Form 2 Engg Cert Sept 25.pdf18 Oct 2025
Form 3File: Form 3 CA Cert Sept 25.pdf18 Oct 2025
Disclosure of Sold and Booked InventoryFile: Sold unsold Status Sept 25.pdf18 Oct 2025
Form 1File: 1- Architect Cert of June-25 Qtr.pdf16 Jul 2025
Form 2File: 2- Engg Certificate June-25.pdf16 Jul 2025
Form 3File: 3- Form 3 of CA Cert of June-25 Qtr.pdf16 Jul 2025
Disclosure of Sold and Booked InventoryFile: Pranami Bliss Sold and Unsold june 25.pdf16 Jul 2025
Layout approvalFile: Amend IOA Plan 280325.pdf25 Apr 2025
Building plan approvalFile: Amend IOA Letter dated 280325.pdf25 Apr 2025
Copy of Layout Approval (in case of layout)File: Amend IOA Plan 280325.pdf25 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: Amend IOA Letter dated 280325.pdf25 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 - CA Certificate Mar 25 R1_compressed.pdf22 Apr 2025
Disclosure of sold/ booked inventoryFile: Unsold Inventor - Mar-25 R1.pdf22 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Architech Certificate Mar-25 Qtr.pdf19 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - CA Certificate Mar-25 Qtr_compressed.pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Engineers Certificate Mar-25 Qtr.pdf19 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold and Unsold Inventory Mar-25 Qtr.pdf19 Apr 2025
Proforma of Agreement for saleFile: Draft Agreement for Sale Updated.pdf19 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold 2024 end.pdf4 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg Cert Dec-24.pdf11 Feb 2025
Commencement Certificates / NA Order for plotted developmentFile: Pranami Bliss CC Revalidation.pdf11 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg Cert Dec-24.pdf11 Feb 2025
Commencement Certificates / NA Order for plotted developmentFile: Pranami Bliss CC Revalidation.pdf11 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Dec 24.pdf10 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Dec 24.pdf10 Feb 2025
Details of encumbrances concerned to FinanceFile: Pranami Bliss Encumbrance - Financial.pdf27 Dec 2024
Details of encumbrances concerned to FinanceFile: title legal.pdf27 Dec 2024
Details of encumbrances concerned to LegalFile: Pranami Bliss Encumbrance - Financial.pdf27 Dec 2024
Details of encumbrances concerned to LegalFile: title legal.pdf27 Dec 2024
Details of encumbrances concerned to FinanceFile: Pranami Bliss Encumbrance - Financial.pdf27 Dec 2024
Details of encumbrances concerned to FinanceFile: title legal.pdf27 Dec 2024
Details of encumbrances concerned to LegalFile: Pranami Bliss Encumbrance - Financial.pdf27 Dec 2024
Details of encumbrances concerned to LegalFile: title legal.pdf27 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Rera certificate 16 dec 24.pdf17 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Rera certificate 16 dec 24.pdf17 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 4th Slab Completion certificate_11-28-2024.pdf16 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects Form 1 certificate.pdf16 Dec 2024
Disclosure of sold/ booked inventoryFile: Booked Inventory.pdf16 Dec 2024
Proforma of Agreement for saleFile: Draft AFS.pdf16 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 4th Slab Completion certificate_11-28-2024.pdf16 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects Form 1 certificate.pdf16 Dec 2024
Disclosure of sold/ booked inventoryFile: Booked Inventory.pdf16 Dec 2024
Proforma of Agreement for saleFile: Draft AFS.pdf16 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Cert Form 3- Sept-24 Qtr.pdf11 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg Cert Sept-24.pdf11 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Cert Form 3- Sept-24 Qtr.pdf11 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg Cert Sept-24.pdf11 Dec 2024
Commencement Certificates / NA Order for plotted developmentFile: Azad Nagar CC 9 August 2024.pdf9 Aug 2024
Proforma of Agreement for saleFile: Draft Model Agreement for Sale RERA Pranami 22062024.pdf6 Jun 2024
Other - LegalFile: Order 06032024 merge order.pdf6 Jun 2024
Other - LegalFile: Order 06032024.pdf6 Jun 2024
Other - LegalFile: Title Flow letter.pdf6 Jun 2024
Other - LegalFile: 49 SALE DEED 09-06-2011.pdf6 Jun 2024
Other - LegalFile: 50 SALE DEED 05-04-2010.pdf6 Jun 2024
Other - LegalFile: 6.pdf6 Jun 2024
Other - LegalFile: 6 (1).pdf6 Jun 2024
Other - LegalFile: 6 (2).pdf6 Jun 2024
Other - LegalFile: 6 (3).pdf6 Jun 2024
Other - LegalFile: 6 (4).pdf6 Jun 2024
Other - LegalFile: 6 (5).pdf6 Jun 2024
Other - FinanceFile: NON Encubrance Finanace and legal.pdf26 Apr 2024
Commencement Certificates / NA Order for plotted developmentFile: Plinth CC AN 49 50.pdf30 Mar 2024
CERSAI detailsFile: 2.pdf30 Mar 2024
Declaration in FORM BFile: Form B of SPs compressed.pdf29 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA cert 19march24 compressed.pdf19 Mar 2024
Other - TechnicalFile: Declaration for one registration 18 March 24.pdf18 Mar 2024
Copy of the legal title reportFile: Title Report - RERA.pdf11 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg Certificate.pdf8 Mar 2024
Proforma of Allotment letterFile: Draft of RERA Allotment Letter Pranami 22062024.pdf8 Mar 2024
Deviation Report with respect to model copy of AgreementFile: Deviation AFS 060624.pdf8 Mar 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: BA Int Disclosure.pdf29 Feb 2024

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
Mall of RanchiRatu Road Ranchi Jharkhand 83522286CompletedJul 2022Jul 2022

How this compares with Mumbai Suburban

42%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep PRANAMI BLISS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Azad Nagar 36,700+ in Mumbai Suburban

2 kmPRANAMI BLISSCompleted 127Lapsed / revoked 93Abeyance 1Other 167Dot size: filed unitsN

Filed coordinates, straight-line distance. 388 registered projects within 2 km.

Builder: Pranami Neev Realty Limited

Pranami Neev Realty Limited has 1 registration on MahaRERA, including PRANAMI BLISS. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if PRANAMI BLISS is delayed beyond 15 Apr 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of PRANAMI BLISS?

The registered promoter entity is Pranami Neev Realty Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in PRANAMI BLISS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for PRANAMI BLISS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at PRANAMI BLISS?

The professionals named in the filing: Architect: A plus Architects plus Planners; Engineer: Nexus Project Solutions Pvt Ltd; Chartered Accountant: Vinod Gowadia. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in PRANAMI BLISS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About PRANAMI BLISS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save PRANAMI BLISS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.