Home / Browse projects / Pune, Maharashtra / YOUTHIKA

Registered No litigation declared Residential / Group Housing project

YOUTHIKA

By KRUSHNARANG GROUP

RG-MH-53763 · RERA P52100051202 · Last updated on MahaRERA portal: 16 Jul 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Oct 2026Possession promisedno revision filed
14 of 22Construction stages doneacross 2 buildings; furthest along: External plumbing and external plaster, 90%
140 of 198Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 164 documents Report an error

YOUTHIKA is a Residential / Group Housing project by KRUSHNARANG GROUP in Pune, Maharashtra, registered with MahaRERA as P52100051202 on 1 Jun 2023. Possession is promised by 30 Oct 2026. 58 of the 198 units on this registration are recorded sold or booked, and 14 of 22 construction stages are filed complete.

At a glance

Project

  • NameYOUTHIKA
  • TypeResidential / Group Housing
  • Location
    • LOHEGAON
    • LOHGAON
    • Haveli
    • Pune
    • 411047
  • Pincode411047
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100051202
  • ReraGenie IDRG-MH-53763

Builder

  • NameKRUSHNARANG GROUP
  • Entity typePartnership
  • PartnersSAMIR SAKHARAM ZAPKE, UMESH VITTHAL WALKE, CHANDRAKANT LAXMAN SATAV

Key dates

this monthRegisteredJun 2023PromisedOct 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on1 Jun 2023
  • Promised completion30 Oct 2026
  • Revised completionNone
  • Buildings2 building records
  • Documents filed164 files

Current status

29%58 of 198 units booked
83.1%Work done, per cost certificate

Figures as on 16 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING ANA121099099
BUILDING BNA121099099

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 16 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

14 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is External plumbing and external plaster, at 90%.

BUILDING A66%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises85%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%
BUILDING B82%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 16 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes50%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes50%
Street LightingYes50%
Community BuildingsYes50%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes70%
Electrical meter room, sub-station, receiving stationYes70%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed334

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots334
Closed/Covered334
BuildingClosed/CoveredTotal
BUILDING A177177
BUILDING B157157

Land and ownership15

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area6,000 sq m
Land owned byNot the promoter
Named landowners15
LandownerVillageDistrict
GOVIND KALURAM GAWADELOHGAONPune
ASHA GOVIND GAWADELOHGAONPune
POOJA KUNDAN JAGDALEWAGHOLIPune
GOPAL ALIAS BALU KALURAM GAWADELOHGAONPune
JAYASHREE GOPAL GAWADELOHGAONPune
Mr. Govind Kaluram GawadeLOHGAONPune
Mr. Gopal Alias Balu Kaluram GawadeLOHGAONPune
VAIBHAV GOVIND GAWADELahagaonPune
NAGESHWAR GOPAL ALIAS BALU KALURAM GAWADELahagaonPune
GAURAV GOPAL ALIAS BALU KALURAM GAWADELahagaonPune
GOVIND KALURAM GAWADELahagaonPune
ASHA GOVIND GAWADELahagaonPune
POOJA KUNDAN JAGDALE ALIAS POOJA GOVIND JAGDALEWAGHOLIPune
GOPAL ALIAS BALU KALURAM GAWADELahagaonPune
JAYASHREE GOPAL ALIAS BALU GAWADELahagaonPune

Approvals and building plan

Sanctioning authorityPUNE MUNICIPAL CORPORATION
Permissible FSI17155.03
Proposed, not sanctioned17,155 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSUNANDA APARTMENT VISHRANTWADI PUNE 411015
Estimated costRs 62.56 cr
Cost incurredRs 51.97 cr
Work done83.07%
BuildingWingEstimatedIncurred
BUILDING ANARs 29.11 crRs 20.67 cr
BUILDING BNARs 28.07 crRs 28.07 cr
-NARs 5.37 crRs 3.22 cr

Certifying professionals and partners9

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectATUL RANPISE
ArchitectMANISH ARVIND TRIBHUVAN
EngineerMR. G.A. BHILARE
EngineerROHINEE KAILAS BADGUJAR
EngineerSagar Patil
Chartered AccountantYOGESH B KABRA AND CO
Chartered AccountantPravin Pise
Chartered AccountantVaibhav S Bhise
Chartered AccountantPratik Doshi
PartnerRole in project
KRUSHNARANG GROUP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 13 Apr 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 7 Jan 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 7 Jan 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 2 Dec 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Oct 2026

Documents filed164

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 164 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 (7).pdf16 Jul 2026
Withdrawal Update Form 2File: Form 2 (1).pdf16 Jul 2026
Withdrawal Update Form 3File: Form 3_june 26 (2).pdf16 Jul 2026
Form 2A (FY 2025-2026)File: FORM 2A_25-26 (1).pdf29 May 2026
Form 2A (FY 2026-2027)File: FORM 2A_26-27.pdf29 May 2026
Withdrawal Update Form 1File: Form 1_March 26.pdf23 Apr 2026
Withdrawal Update Form 1File: Form 1_March 26.pdf23 Apr 2026
Withdrawal Update Form 2File: Form 2_March 26.pdf23 Apr 2026
Withdrawal Update Form 2File: Form 2_March 26.pdf23 Apr 2026
Withdrawal Update Form 3File: ram Residency form 3.pdf23 Apr 2026
Withdrawal Update Form 3File: Youthika Form 3.pdf23 Apr 2026
Withdrawal Update Form 1File: Form 1_March 26.pdf16 Apr 2026
Withdrawal Update Form 2File: Form 2_March 26.pdf16 Apr 2026
Withdrawal Update Form 3File: CA.pdf16 Apr 2026
Withdrawal Update Form 1File: DEC 2025_FORM 1.pdf17 Jan 2026
Withdrawal Update Form 2File: DEC 2025_FORM 2.pdf17 Jan 2026
Withdrawal Update Form 3File: DEC 2025_FORM 3.pdf17 Jan 2026
Layout approvalFile: YOUTHIKA LAYOUT.pdf7 Jan 2026
Building plan approvalFile: FLOOR PLAN 1 (B BLDG).pdf7 Jan 2026
Building plan approvalFile: FLOOR PLAN 2 (8 FLOOR B BLDG).pdf7 Jan 2026
Building plan approvalFile: FLOOR PLAN 3 (1 TO 10 B BLDG)_compressed (1).pdf7 Jan 2026
Building plan approvalFile: FLOOR PLAN 4 (A BLDG).pdf7 Jan 2026
Building plan approvalFile: FLOOR PLAN 5 (BP-GP-10 FLOOR A BLDG).pdf7 Jan 2026
Building plan approvalFile: FLOOR PLAN 6 (BP-GP-10 FLOOR A BLDG)_compressed.pdf7 Jan 2026
Building plan approvalFile: FLOOR PLAN 7 (BAEMENT AND GROUND PARKING).pdf7 Jan 2026
Withdrawal Update Form 1File: Sept 2025_Architect.pdf8 Nov 2025
Withdrawal Update Form 2File: Sept 2025_Engineer.pdf8 Nov 2025
Withdrawal Update Form 3File: REVISED FORM 3 RERA (5).pdf8 Nov 2025
Form 5 (FY 2024-2025)File: form 5 (2).pdf8 Nov 2025
Form 2A (FY 2023-2024)File: Youthika Form 2A 2023-24.pdf2 Sep 2025
Form 2A (FY 2024-2025)File: youthika Form 2A 24-25.pdf2 Sep 2025
Form 5 (FY 2023-2024)File: youthika Form 5 23-24.pdf2 Sep 2025
Withdrawal Update Form 1File: FORM 1 (30).pdf17 Jul 2025
Withdrawal Update Form 1File: FORM 1 (30).pdf17 Jul 2025
Withdrawal Update Form 2File: FORM 2 (31).pdf17 Jul 2025
Withdrawal Update Form 2File: FORM 2 (31).pdf17 Jul 2025
Withdrawal Update Form 3File: FORM 3 (23).pdf17 Jul 2025
Withdrawal Update Form 3File: FORM 3 (23).pdf17 Jul 2025
Layout approvalFile: 1-8.pdf27 Jun 2025
Layout approvalFile: 1-8.pdf27 Jun 2025
Building plan approvalFile: 2-8.pdf27 Jun 2025
Building plan approvalFile: 4-8.pdf27 Jun 2025
Building plan approvalFile: 5-8.pdf27 Jun 2025
Building plan approvalFile: 7-8.pdf27 Jun 2025
Building plan approvalFile: 8-8.pdf27 Jun 2025
Building plan approvalFile: 3-8_compressed.pdf27 Jun 2025
Building plan approvalFile: 6-8_compressed.pdf27 Jun 2025
Form 1File: f1 jun 23.pdf24 Jun 2025
Form 2File: f2 jun 23.pdf24 Jun 2025
Form 3File: f3 june 23.pdf24 Jun 2025
Disclosure of Sold and Booked InventoryFile: june 23 sold.pdf24 Jun 2025
Form 1File: f1 sep 23.pdf24 Jun 2025
Form 2File: f2 sep 23.pdf24 Jun 2025
Form 3File: f3 sept 23.pdf24 Jun 2025
Disclosure of Sold and Booked InventoryFile: sold sept 23.pdf24 Jun 2025
Form 1File: f1 dec 23.pdf24 Jun 2025
Form 2File: f2 dec 23.pdf24 Jun 2025
Form 3File: f3 dec 23.pdf24 Jun 2025
Disclosure of Sold and Booked InventoryFile: sold dec 23.pdf24 Jun 2025
Form 1File: f1.pdf24 Jun 2025
Form 2File: f2 mar 24 sy.pdf24 Jun 2025
Form 3File: f3 mar 24.pdf24 Jun 2025
Disclosure of Sold and Booked InventoryFile: sold mar 24.pdf24 Jun 2025
Form 1File: f1 jun 24.pdf24 Jun 2025
Form 2File: f2 jun 24.pdf24 Jun 2025
Form 3File: f3 june 24.pdf24 Jun 2025
Disclosure of Sold and Booked InventoryFile: sold jjun 24.pdf24 Jun 2025
Form 1File: f1 sep 24.pdf24 Jun 2025
Form 2File: f2 set 24.pdf24 Jun 2025
Form 3File: f3 sep 24.pdf24 Jun 2025
Disclosure of Sold and Booked InventoryFile: sold sept 24.pdf24 Jun 2025
Form 1File: f1 sep 24.pdf24 Jun 2025
Form 2File: f2 set 24.pdf24 Jun 2025
Form 3File: f3 sep 24.pdf24 Jun 2025
Disclosure of Sold and Booked InventoryFile: sold sept 24.pdf24 Jun 2025
Form 1File: f1 mar 25.pdf24 Jun 2025
Form 2File: f2 mar 25.pdf24 Jun 2025
Form 3File: f3 mar 25sy.pdf24 Jun 2025
Disclosure of Sold and Booked InventoryFile: sold mar 25.pdf24 Jun 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: KR Group Form No 3 Mar 2025_compressed.pdf14 Apr 2025

How this compares with Pune

29%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep YOUTHIKA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near LOHEGAON13,700+ in Pune

2 kmYOUTHIKACompleted 45Lapsed / revoked 21Other 61Dot size: filed unitsN

Filed coordinates, straight-line distance. 127 registered projects within 2 km.

Builder: KRUSHNARANG GROUP

KRUSHNARANG GROUP has 1 registration on MahaRERA, including YOUTHIKA. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if YOUTHIKA is delayed beyond 30 Oct 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of YOUTHIKA?

The registered promoter entity is KRUSHNARANG GROUP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in YOUTHIKA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for YOUTHIKA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at YOUTHIKA?

The professionals named in the filing: Architect: ATUL RANPISE; Architect: MANISH ARVIND TRIBHUVAN; Engineer: MR. G.A. BHILARE; Engineer: ROHINEE KAILAS BADGUJAR; Engineer: Sagar Patil; Chartered Accountant: YOGESH B KABRA AND CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in YOUTHIKA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About YOUTHIKA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save YOUTHIKA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.