YOSH EMPIRE

By YOSH INFRATECH PRIVATE LIMITED

RG-MH-92880 · RERA P99000048717 · Last updated on MahaRERA portal: 9 Sep 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 36 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedmoved 36 months from the original
4 of 22Construction stages doneacross 2 buildings; furthest along: Slabs of Super Structure, 80%
167 of 195Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 91 documents Report an error

YOSH EMPIRE is a Others project by YOSH INFRATECH PRIVATE LIMITED in Palghar, Maharashtra, registered with MahaRERA as P99000048717 on 13 Jan 2023. Possession is promised by 31 Dec 2028. The completion date has moved by 36 months from the original filing. 28 of the 195 units on this registration are recorded sold or booked, and 4 of 22 construction stages are filed complete.

At a glance

Project

  • NameYOSH EMPIRE
  • TypeOthers
  • Location
    • TARAPUR ROAD
    • BOISAR
    • Palghar
    • 401501
  • Pincode401501
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P99000048717
  • ReraGenie IDRG-MH-92880

Builder

  • NameYOSH INFRATECH PRIVATE LIMITED
  • Entity typeCompany
  • DirectorHEENA YOGESH PATIL
  • Managing DirectorYOGESH MAHADEO PATIL

Key dates

this monthRegisteredJan 2023First promiseDec 2025Revised toDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on13 Jan 2023
  • Promised completion31 Dec 2028
  • Revised completionRevised to 31 Dec 2028 (originally 31 Dec 2025)
  • Buildings2 building records
  • Documents filed91 files

Current status

14%28 of 195 units booked
10.0%Work done, per cost certificate

Figures as on 9 Sep 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Residential-Wing A and BNA871240124
CommercialNA4407171

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 9 Sep 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 80%.

Residential-Wing A and B41%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure80%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks30%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Commercial9%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 9 Sep 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)NoNot applicable
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed160

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots160
Closed/Covered120
Open Space40
BuildingClosed/CoveredOpen SpaceTotal
Residential-Wing A and B6140101
Commercial59059

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area9,008 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on20 Jan 2026
LandownerVillageDistrict
TATANAGAR CO OP HSG SOC LTDKolwadePalghar

Approvals and building plan

Sanctioning authorityMAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION
Permissible FSI9008.0
Proposed, not sanctioned9,008 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBANDRA WEST , NATIONAL LIBRARY, S V ROAD, MUMBAI - 400050
Estimated costRs 38.03 cr
Cost incurredRs 3.80 cr
Work done9.99%
BuildingWingEstimatedIncurred
Residential-Wing A and BNARs 16.09 crRs 3.80 cr
CommercialNARs 16.09 cr-
-NARs 5.85 cr-

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDEEPAK THAKARE DEEPAK THAKRE
EngineerSTRUCTURAL CONCEPT DESIGNS PRIVATE LIMITED
EngineerF S CONSULTANT
Chartered AccountantMANISH KUMAR GUPTA AND CO MANISHKUMAR GUPTA
Chartered AccountantMs DIPIKA PATEL & CO DIPIKA PATEL
Chartered AccountantRAJESH MURUGAN
PartnerRole in project
YOSH INFRATECH PRIVATE LIMITED-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA21012619521Dec 2025 → Dec 2028

Reason as filed by the promoterThere were liquidity issues and delays in funding. Labour and material shortages, along with disruptions in supply chains and workforce availability, are impacting construction timelines.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 5 Dec 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 25 Nov 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 22 Feb 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 25 Nov 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed91

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 91 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 Q1 2026-27.pdf9 Sep 2026
Withdrawal Update Form 2File: 2627_Q1_Form 2.pdf9 Sep 2026
Withdrawal Update Form 3File: 2627 Q1 Form 3.pdf9 Sep 2026
Form 2A (FY 2025-2026)File: Form 2A_2025-26.pdf15 Jul 2026
Withdrawal Update Form 1File: 2526_Q4_Form 1.pdf22 Jun 2026
Withdrawal Update Form 2File: 2526_Q4_Form 2.pdf22 Jun 2026
Withdrawal Update Form 3File: 25-26_Q4_Form3.pdf22 Jun 2026
Form 1File: Form 1_March 25.pdf30 Jan 2026
Form 2File: Form 2_March 25.pdf30 Jan 2026
Form 3File: Form 3_March 25.pdf30 Jan 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Booked Inventory_March 25.pdf30 Jan 2026
Form 5 (FY 2022-2023)File: Form 5 FY 2022-23.pdf30 Jan 2026
Form 5 (FY 2023-2024)File: Form 5 FY 2023-24.pdf30 Jan 2026
Form 2A (FY 2023-2024)File: Form 2A March 2023-2024.pdf22 Jan 2026
Form 2A (FY 2024-2025)File: Form 2A March 2024-2025.pdf22 Jan 2026
Form 2A (FY 2022-2023)File: Form 2A March 2023.pdf21 Jan 2026
Withdrawal Update Form 1File: Form 1_June 25.pdf20 Jan 2026
Withdrawal Update Form 1File: Form 1_Sep 25.pdf20 Jan 2026
Withdrawal Update Form 1File: Form 1_Dec 25.pdf20 Jan 2026
Withdrawal Update Form 2File: Form 2_June 25.pdf20 Jan 2026
Withdrawal Update Form 2File: Form 2_Sep 25.pdf20 Jan 2026
Withdrawal Update Form 2File: Form 2_Dec 25.pdf20 Jan 2026
Withdrawal Update Form 3File: Form 3_June 25.pdf20 Jan 2026
Withdrawal Update Form 3File: Form 3_Sep 25.pdf20 Jan 2026
Withdrawal Update Form 3File: Form 3_Dec 25.pdf20 Jan 2026
Building plan approvalFile: june-24.pdf22 Feb 2025
Building plan approvalFile: sept -24.pdf22 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Sep-23.pdf22 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: dec-23.pdf22 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: March-24.pdf22 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: june-24.pdf22 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: sept -24.pdf22 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: dec -24.pdf22 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: June-23.pdf22 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 24-25_Q2_Form3.pdf22 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 24-25_Q3_Form3.pdf22 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 24-25_Q1_Form3.pdf22 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 23-24_Q4_Form3.pdf22 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 23-24_Q3_Form3.pdf22 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 23-24_Q2_Form3.pdf22 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 23-24_Q1_Form3.pdf22 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2324_Q1_Form 2.pdf22 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2324_Q2_Form 2.pdf22 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2324_Q3_Form 2.pdf22 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2324_Q4_Form 2.pdf22 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2425_Q1_Form 2.pdf22 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2425_Q2_Form 2.pdf22 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2425_Q3_Form 2.pdf22 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: june-24.pdf22 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: sept -24.pdf22 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Quality Certificate.pdf22 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form5.pdf22 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 2 updated Form 3 CA Certificate 31-03-2023 Revised Signed_11zon.pdf20 Feb 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 Fy 2022-23.pdf20 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2 Yosh Architect's Certificate 31-03-2023.pdf29 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 Engineer's Certificate.pdf29 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 2 Form 3 CA Certificate Yosh-sign.pdf29 May 2023
Proforma of Agreement for saleFile: NEW AFS BY YOSH FILED WITH RERA.pdf11 Jan 2023
Deviation Report with respect to model copy of AgreementFile: NEW DEVIATION REPORT SIGN.pdf11 Jan 2023
Declaration about Commencement CertificateFile: Declaration about Commencement Certificate- Sign.pdf3 Jan 2023
Declaration in FORM BFile: Form B New.pdf3 Jan 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure- Yogesh sir sign 1.pdf2 Jan 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure- Heena signed.pdf2 Jan 2023
Proforma of Allotment letterFile: nEW ALLOTMENT LETTER DRAFT WITHOUT PREJUDICE.pdf20 Dec 2022
Deviation Report with respect to Allotment letterFile: deviation report allotment letter NEW.pdf20 Dec 2022
CERSAI detailsFile: CERSAI_Search_Report_200254036362_For_Asset_Based_Search_06_12_2022_11_14_33_319.pdf6 Dec 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf6 Dec 2022
Copy of the legal title reportFile: Legal Title Report.pdf5 Dec 2022
Building plan approvalFile: Sheet-8_compressed.pdf25 Nov 2022
Layout approvalFile: Sheet-1_compressed.pdf25 Nov 2022
Building plan approvalFile: Sheet-2_compressed.pdf25 Nov 2022
Building plan approvalFile: Sheet-3_compressed.pdf25 Nov 2022
Building plan approvalFile: Sheet-4_compressed.pdf25 Nov 2022
Building plan approvalFile: Sheet-5_compressed.pdf25 Nov 2022
Building plan approvalFile: Sheet-6_compressed.pdf25 Nov 2022
Building plan approvalFile: Sheet-7_compressed.pdf25 Nov 2022
PAN CardFile: Yosh Infratech Private Limited PAN Card.pdf25 Nov 2022
Details of encumbrances concerned to FinanceFile: Encumbrance certificate.pdf25 Nov 2022
Details of encumbrances concerned to LegalFile: Encumbrance certificate.pdf25 Nov 2022
Copy of Layout Approval (in case of layout)File: Sheet-1_compressed.pdf25 Nov 2022

How this compares with Palghar

14%of this project is bookeddistrict median 25%
31%of Palghar projects moved their completion datethis one moved by 36 months
26%of Palghar registrations have lapsed or been cancelledthis one is on the register

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep YOSH EMPIRE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near BOISAR3,200+ in Palghar

2 kmYOSH EMPIRECompleted 4Lapsed / revoked 2Other 11Dot size: filed unitsN

Filed coordinates, straight-line distance. 17 registered projects within 2 km.

Builder: YOSH INFRATECH PRIVATE LIMITED

YOSH INFRATECH PRIVATE LIMITED has 1 registration on MahaRERA, including YOSH EMPIRE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if YOSH EMPIRE is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of YOSH EMPIRE?

The registered promoter entity is YOSH INFRATECH PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in YOSH EMPIRE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for YOSH EMPIRE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at YOSH EMPIRE?

The professionals named in the filing: Architect: DEEPAK THAKARE DEEPAK THAKRE; Engineer: STRUCTURAL CONCEPT DESIGNS PRIVATE LIMITED; Engineer: F S CONSULTANT; Chartered Accountant: MANISH KUMAR GUPTA AND CO MANISHKUMAR GUPTA; Chartered Accountant: Ms DIPIKA PATEL & CO DIPIKA PATEL; Chartered Accountant: RAJESH MURUGAN. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in YOSH EMPIRE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About YOSH EMPIRE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save YOSH EMPIRE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.