Yogesh Co-Operative Housing Society
By Ravindra Developers Private Limited
RG-MH-52813 · RERA P51600048451 · Last updated on MahaRERA portal: 24 Apr 2026
Source: official MahaRERA filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations and every project registered within 2 km.
See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Yogesh Co-Operative Housing Society is a Residential / Group Housing project by Ravindra Developers Private Limited in Nashik, Maharashtra, registered with MahaRERA as P51600048451 on 3 Jan 2023. The registration is recorded completed; possession was promised by 31 Dec 2025. 31 of the 44 units on this registration are recorded sold or booked, and 10 of 11 construction stages are filed complete.
At a glance
Project
- NameYogesh Co-Operative Housing Society
- TypeResidential / Group Housing
- Location
- Sharanpur Road
- Kulkarni Garden
- Nashik (M Corp.)
- Nashik
- 422002
- Pincode422002
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51600048451
- ReraGenie IDRG-MH-52813
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on3 Jan 2023
- Promised completion31 Dec 2025
- Revised completionNone
- Buildings1 building record
- Documents filed101 files
Current status
Figures as on 24 Apr 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Yogesh Co-Operative Housing Society | NA | 14 | 14 | 44 | 0 | 44 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 24 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
10 of 11 construction stages are filed complete. The stage furthest along is Stilt Floor, at 0%.
Yogesh Co-Operative Housing Society: 91% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 24 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 80% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | No | Not applicable |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 100% |
Parking filed238
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Yogesh Co-Operative Housing Society Ltd | Nashik (M Corp.) | Nashik |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Yogesh Co-Operative Housing Society | NA | Rs 7.87 cr | Rs 7.07 cr |
| - | NA | Rs 1.24 cr | Rs 1.23 cr |
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Ar. Sagar A. Kabre |
| Engineer | Er. Sachin Bagul |
| Chartered Accountant | Rohan S Patil |
| Partner | Role in project |
|---|---|
| Ravindra Developers Private Limited | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 30 Nov 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 25 Aug 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 25 Aug 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 25 Aug 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed101
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 101 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Occupational CertificateFile: RERA-Yogesh_merged.pdf | 24 Apr 2026 |
| Withdrawal Update Form 1File: Form 1 yog architect jan 26_0001.pdf | 4 Feb 2026 |
| Withdrawal Update Form 2File: Form 2 yog engi jan 26_0001.pdf | 4 Feb 2026 |
| Withdrawal Update Form 3File: Form 3 yogesh ca jan 26_0001Com.pdf | 4 Feb 2026 |
| Withdrawal Update Form 1File: ARCHITECT 2 yogesh apt_0001.pdf | 17 Oct 2025 |
| Withdrawal Update Form 2File: YOGESH APT RERA OCT 2025_0001.pdf | 17 Oct 2025 |
| Withdrawal Update Form 3File: Form 3 Yogesh Apartment_0001.pdf | 17 Oct 2025 |
| Form 1File: ARCH CERT YOGESH APT JULY 25.pdf | 19 Jul 2025 |
| Form 2File: yogesh apt engi cert july 2025_0001.pdf | 19 Jul 2025 |
| Form 3File: yogesh apt ca cert july 2025 0001.pdf | 19 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Yogesh Q 1.pdf | 19 Jul 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Ar Certifcate - Yogesh Apt.pdf | 24 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate -Yogesh Apt_compressed.pdf | 24 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engi Certificate - Yogesh Apt.pdf | 24 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: sold_unsold_yogesh_4thQ-24-25.pdf | 24 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect yogesh_0001.pdf | 5 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: Sold unsold Yogesh 3rd Qtr 24 25.pdf | 27 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Certificate Yogesh Appt_0001.pdf | 21 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Yogesh Apt CA Certificate Jan 2025_0001_compressed.pdf | 20 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: sold_unsold_Yogesh.pdf | 9 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Ar certificate Yogesh Apt _0001.pdf | 6 Nov 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Yogesh Co-op 2023-24.pdf | 6 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RDPL CA Certificate Yogesh Apt_0001_compressed.pdf | 19 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RDPL Engi Certificate Yogesh Apt_0001.pdf | 19 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Yogesh_0001.pdf | 13 Aug 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineering Certificate Yogesh_0001_compressed.pdf | 13 Aug 2024 |
| Disclosure of sold/ booked inventoryFile: Sold unsold - Yogesh Co 1st Q 24-25.pdf | 13 Aug 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE Yogesh_0001_compressed.pdf | 13 Aug 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A -YOGESH_0001.pdf | 20 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ArchiYogeshAptjan.pdf | 26 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: YCHS Eng.pdf | 26 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: SoldUnsoldMarYogesh.pdf | 26 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA yogeshAptJan.pdf | 26 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: arch jantomarch.pdf | 15 Mar 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: arch aprtojun.pdf | 15 Mar 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: arch jultosep.pdf | 15 Mar 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: arch octtodec.pdf | 15 Mar 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engi jantomarch.pdf | 15 Mar 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engi aprtojun.pdf | 15 Mar 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engi jultosep.pdf | 15 Mar 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engi octtodec.pdf | 15 Mar 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA jantomarch.pdf | 15 Mar 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: engi aprtojun.pdf | 15 Mar 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA jultosep.pdf | 15 Mar 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA octtodec.pdf | 15 Mar 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architectcertyogeshapt.pdf | 12 Mar 2024 |
| Disclosure of sold/ booked inventoryFile: Sold unsold Yogesh.pdf | 10 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architectcertyogeshapt.pdf | 23 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engiCertificateyogeshapt.pdf | 20 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CACertificateYogeshAppt.pdf | 20 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form2.pdf | 16 Oct 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: form2a.pdf | 16 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form3.pdf | 16 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form5.pdf | 16 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 3 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Yogesh Q1 Form 1.pdf | 3 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_compressed.pdf | 3 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Yogesh Q1 Form 2.pdf | 3 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_ (1).pdf | 3 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_ (2).pdf | 3 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA (1).pdf | 19 Dec 2022 |
| Copy of the legal title reportFile: Title Yogesh_0001.pdf | 30 Nov 2022 |
| Copy of the legal title reportFile: search Report Yogesh CHS 1.pdf | 30 Nov 2022 |
| Declaration about Commencement CertificateFile: Form D.pdf | 11 Nov 2022 |
| Proforma of Allotment letterFile: Draft Agreement For Sale.pdf | 4 Oct 2022 |
| Proforma of Agreement for saleFile: Draft Agreement For Sale.pdf | 4 Oct 2022 |
| CERSAI detailsFile: CERSAI details.pdf | 23 Sep 2022 |
| Deviation Report with respect to model copy of AgreementFile: Divetion Reprot For AFS.pdf | 23 Sep 2022 |
| Details of encumbrances concerned to FinanceFile: Details of encumbrances concerned to Finance-Yogesh Co-operative Housing Society.pdf | 1 Sep 2022 |
| Details of encumbrances concerned to LegalFile: Details of encumbrances concerned to Legal-Yogesh Co-operative Housing Society.pdf | 1 Sep 2022 |
| Declaration in FORM BFile: Developers Declaration_0001_compressed.pdf | 1 Sep 2022 |
| Proforma of Agreement for saleFile: Allotment Letter-Yogesh Co-operative Housing Society.pdf | 1 Sep 2022 |
| Proforma of Allotment letterFile: Allotment Letter-Yogesh Co-operative Housing Society.pdf | 1 Sep 2022 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Separate Bank Ac Declaration_0001.pdf | 1 Sep 2022 |
| Deviation Report with respect to Allotment letterFile: Deviation of Allotment Letter-Yogesh Co-operative Housing Society.pdf | 1 Sep 2022 |
| Layout approvalFile: Plan 01.pdf | 25 Aug 2022 |
| Layout approvalFile: Plan 02.pdf | 25 Aug 2022 |
| Layout approvalFile: Plan 03.pdf | 25 Aug 2022 |
| Layout approvalFile: Plan 04.pdf | 25 Aug 2022 |
| Layout approvalFile: Plan 05.pdf | 25 Aug 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nashik
Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.
Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 2 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 101 filed documents as one ZIP, foldered, with a manifest
Keep Yogesh Co-Operative Housing Society on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Kulkarni Garden4,100+ in Nashik
Filed coordinates, straight-line distance. 259 registered projects within 2 km.
THE CHOUPAAL
KALANTRI AND BANG PROPERTIES
Sai Pride
Jay Infrastructures
Nayantara Presidency Phase 3
Pancharatna Builcon Pvt. Ltd
Nayantara Presidency Phase 4
Pancharatna Builcon Pvt. Ltd
TRUKONS BUSINESS PARK
TEZVED BUILDCON LLP
Avenue Flora
The Avenue NX
See every Nashik project, with the district possession charts
Builder: Ravindra Developers Private Limited
Ravindra Developers Private Limited has 3 registrations on MahaRERA, including Aura Sky Tower and Yogesh Co-Operative Housing Society. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Nashik district page.
Frequently asked questions
What are my rights if Yogesh Co-Operative Housing Society is delayed beyond 31 Dec 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Yogesh Co-Operative Housing Society?
The registered promoter entity is Ravindra Developers Private Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Yogesh Co-Operative Housing Society?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Yogesh Co-Operative Housing Society?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Yogesh Co-Operative Housing Society?
The professionals named in the filing: Architect: Ar. Sagar A. Kabre; Engineer: Er. Sachin Bagul; Chartered Accountant: Rohan S Patil. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Yogesh Co-Operative Housing Society?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback