Completed No litigation declared Residential / Group Housing project

Yogesh Co-Operative Housing Society

By Ravindra Developers Private Limited

RG-MH-52813 · RERA P51600048451 · Last updated on MahaRERA portal: 24 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.
Dec 2025Possession promisedregistration recorded completed
10 of 11Construction stages donefurthest along: Stilt Floor, 0%
13 of 44Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 101 documents Report an error

Yogesh Co-Operative Housing Society is a Residential / Group Housing project by Ravindra Developers Private Limited in Nashik, Maharashtra, registered with MahaRERA as P51600048451 on 3 Jan 2023. The registration is recorded completed; possession was promised by 31 Dec 2025. 31 of the 44 units on this registration are recorded sold or booked, and 10 of 11 construction stages are filed complete.

At a glance

Project

  • NameYogesh Co-Operative Housing Society
  • TypeResidential / Group Housing
  • Location
    • Sharanpur Road
    • Kulkarni Garden
    • Nashik (M Corp.)
    • Nashik
    • 422002
  • Pincode422002
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51600048451
  • ReraGenie IDRG-MH-52813

Builder

  • NameRavindra Developers Private Limited
  • Entity typeCompany
  • DirectorsRavindra Sudam Patil, Shubham Ravindra Patil
  • Other registrations2 more →
  • Completed1 of 3
  • Declared earlier projects1 →

Key dates

this monthRegisteredJan 2023PromisedDec 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on3 Jan 2023
  • Promised completion31 Dec 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed101 files

Current status

70%31 of 44 units booked
91.2%Work done, per cost certificate

Figures as on 24 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Yogesh Co-Operative Housing SocietyNA141444044

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 24 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Stilt Floor, at 0%.

Yogesh Co-Operative Housing Society: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 24 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes80%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes100%

Parking filed238

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots238
Closed/Covered104
Open Space134

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,324 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
Yogesh Co-Operative Housing Society LtdNashik (M Corp.)Nashik

Approvals and building plan

Sanctioning authorityNashik Municipal Corporation
Permissible FSI5619.45
Proposed, not sanctioned5,619 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchHDFC Bank Ltd, Takli Road, Near Dwarka Circle, Nashik-422011
Estimated costRs 9.10 cr
Cost incurredRs 8.30 cr
Work done91.18%
BuildingWingEstimatedIncurred
Yogesh Co-Operative Housing SocietyNARs 7.87 crRs 7.07 cr
-NARs 1.24 crRs 1.23 cr

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAr. Sagar A. Kabre
EngineerEr. Sachin Bagul
Chartered AccountantRohan S Patil
PartnerRole in project
Ravindra Developers Private Limited-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 30 Nov 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 25 Aug 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 25 Aug 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 25 Aug 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed101

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 101 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupational CertificateFile: RERA-Yogesh_merged.pdf24 Apr 2026
Withdrawal Update Form 1File: Form 1 yog architect jan 26_0001.pdf4 Feb 2026
Withdrawal Update Form 2File: Form 2 yog engi jan 26_0001.pdf4 Feb 2026
Withdrawal Update Form 3File: Form 3 yogesh ca jan 26_0001Com.pdf4 Feb 2026
Withdrawal Update Form 1File: ARCHITECT 2 yogesh apt_0001.pdf17 Oct 2025
Withdrawal Update Form 2File: YOGESH APT RERA OCT 2025_0001.pdf17 Oct 2025
Withdrawal Update Form 3File: Form 3 Yogesh Apartment_0001.pdf17 Oct 2025
Form 1File: ARCH CERT YOGESH APT JULY 25.pdf19 Jul 2025
Form 2File: yogesh apt engi cert july 2025_0001.pdf19 Jul 2025
Form 3File: yogesh apt ca cert july 2025 0001.pdf19 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Yogesh Q 1.pdf19 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Ar Certifcate - Yogesh Apt.pdf24 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate -Yogesh Apt_compressed.pdf24 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engi Certificate - Yogesh Apt.pdf24 Apr 2025
Disclosure of sold/ booked inventoryFile: sold_unsold_yogesh_4thQ-24-25.pdf24 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect yogesh_0001.pdf5 Feb 2025
Disclosure of sold/ booked inventoryFile: Sold unsold Yogesh 3rd Qtr 24 25.pdf27 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Certificate Yogesh Appt_0001.pdf21 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Yogesh Apt CA Certificate Jan 2025_0001_compressed.pdf20 Jan 2025
Disclosure of sold/ booked inventoryFile: sold_unsold_Yogesh.pdf9 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Ar certificate Yogesh Apt _0001.pdf6 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Yogesh Co-op 2023-24.pdf6 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RDPL CA Certificate Yogesh Apt_0001_compressed.pdf19 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RDPL Engi Certificate Yogesh Apt_0001.pdf19 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Yogesh_0001.pdf13 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineering Certificate Yogesh_0001_compressed.pdf13 Aug 2024
Disclosure of sold/ booked inventoryFile: Sold unsold - Yogesh Co 1st Q 24-25.pdf13 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE Yogesh_0001_compressed.pdf13 Aug 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A -YOGESH_0001.pdf20 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ArchiYogeshAptjan.pdf26 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: YCHS Eng.pdf26 Apr 2024
Disclosure of sold/ booked inventoryFile: SoldUnsoldMarYogesh.pdf26 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA yogeshAptJan.pdf26 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: arch jantomarch.pdf15 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: arch aprtojun.pdf15 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: arch jultosep.pdf15 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: arch octtodec.pdf15 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engi jantomarch.pdf15 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engi aprtojun.pdf15 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engi jultosep.pdf15 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engi octtodec.pdf15 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA jantomarch.pdf15 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: engi aprtojun.pdf15 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA jultosep.pdf15 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA octtodec.pdf15 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architectcertyogeshapt.pdf12 Mar 2024
Disclosure of sold/ booked inventoryFile: Sold unsold Yogesh.pdf10 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architectcertyogeshapt.pdf23 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engiCertificateyogeshapt.pdf20 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CACertificateYogeshAppt.pdf20 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form2.pdf16 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: form2a.pdf16 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form3.pdf16 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form5.pdf16 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf3 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Yogesh Q1 Form 1.pdf3 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_compressed.pdf3 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Yogesh Q1 Form 2.pdf3 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_ (1).pdf3 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_ (2).pdf3 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA (1).pdf19 Dec 2022
Copy of the legal title reportFile: Title Yogesh_0001.pdf30 Nov 2022
Copy of the legal title reportFile: search Report Yogesh CHS 1.pdf30 Nov 2022
Declaration about Commencement CertificateFile: Form D.pdf11 Nov 2022
Proforma of Allotment letterFile: Draft Agreement For Sale.pdf4 Oct 2022
Proforma of Agreement for saleFile: Draft Agreement For Sale.pdf4 Oct 2022
CERSAI detailsFile: CERSAI details.pdf23 Sep 2022
Deviation Report with respect to model copy of AgreementFile: Divetion Reprot For AFS.pdf23 Sep 2022
Details of encumbrances concerned to FinanceFile: Details of encumbrances concerned to Finance-Yogesh Co-operative Housing Society.pdf1 Sep 2022
Details of encumbrances concerned to LegalFile: Details of encumbrances concerned to Legal-Yogesh Co-operative Housing Society.pdf1 Sep 2022
Declaration in FORM BFile: Developers Declaration_0001_compressed.pdf1 Sep 2022
Proforma of Agreement for saleFile: Allotment Letter-Yogesh Co-operative Housing Society.pdf1 Sep 2022
Proforma of Allotment letterFile: Allotment Letter-Yogesh Co-operative Housing Society.pdf1 Sep 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Separate Bank Ac Declaration_0001.pdf1 Sep 2022
Deviation Report with respect to Allotment letterFile: Deviation of Allotment Letter-Yogesh Co-operative Housing Society.pdf1 Sep 2022
Layout approvalFile: Plan 01.pdf25 Aug 2022
Layout approvalFile: Plan 02.pdf25 Aug 2022
Layout approvalFile: Plan 03.pdf25 Aug 2022
Layout approvalFile: Plan 04.pdf25 Aug 2022
Layout approvalFile: Plan 05.pdf25 Aug 2022

How this compares with Nashik

70%of this project is bookeddistrict median 17%
10%of Nashik projects moved their completion datethis one has not
19%of Nashik registrations have lapsed or been cancelledthis one is completed

Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.

Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Yogesh Co-Operative Housing Society on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kulkarni Garden4,100+ in Nashik

2 kmYogesh Co-Operative HousCompleted 136Lapsed / revoked 35Other 88Dot size: filed unitsN

Filed coordinates, straight-line distance. 259 registered projects within 2 km.

Builder: Ravindra Developers Private Limited

Ravindra Developers Private Limited has 3 registrations on MahaRERA, including Aura Sky Tower and Yogesh Co-Operative Housing Society. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Nashik district page.

Frequently asked questions

What are my rights if Yogesh Co-Operative Housing Society is delayed beyond 31 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Yogesh Co-Operative Housing Society?

The registered promoter entity is Ravindra Developers Private Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Yogesh Co-Operative Housing Society?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Yogesh Co-Operative Housing Society?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Yogesh Co-Operative Housing Society?

The professionals named in the filing: Architect: Ar. Sagar A. Kabre; Engineer: Er. Sachin Bagul; Chartered Accountant: Rohan S Patil. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Yogesh Co-Operative Housing Society?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Yogesh Co-Operative Housing Society. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Yogesh Co-Operative Housing Society to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.