Home / Browse projects / Nashik, Maharashtra / Nayantara Presidency Phase 4

Registered No litigation declared Residential / Group Housing project

Nayantara Presidency Phase 4

By Pancharatna Builcon Pvt. Ltd

RG-MH-00460 · RERA P51600000098 · Last updated on MahaRERA portal: 11 Jul 2026

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA
  • Completion date moved by 48 months
  • 1 extension taken
  • Rs 50.00 crore secured on the land, in favour of SWAMIH Investment Fund I
  • The charge is held by SWAMIH Investment Fund I, a distressed-debt buyer or stressed-asset fund rather than an originating lender

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.
Mar 2028Possession promisedmoved 48 months from the original
6 of 11Construction stages donefurthest along: Internal walls, 65%
103 of 112Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 244 documents Report an error

Nayantara Presidency Phase 4 is a Residential / Group Housing project by Pancharatna Builcon Pvt. Ltd in Nashik, Maharashtra, registered with MahaRERA as P51600000098 on 30 Jun 2017. Possession is promised by 30 Mar 2028. The completion date has moved by 48 months from the original filing. 9 of the 112 units on this registration are recorded sold or booked, and 6 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameNayantara Presidency Phase 4
  • TypeResidential / Group Housing
  • Location
    • Mumbai Agra highway
    • Rajiv nagar
    • Nashik (M Corp.)
    • Nashik
    • 422002
  • Pincode422002
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51600000098
  • ReraGenie IDRG-MH-00460

Builder

  • NamePancharatna Builcon Pvt. Ltd
  • Entity typeCompany
  • Managing DirectorAbhay Kantilal Tated
  • Other registrations3 more →
  • Completed2 of 4
  • Declared earlier projects1 →

Key dates

this monthRegisteredJun 2017First promiseMar 2024Revised toMar 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on30 Jun 2017
  • Promised completion30 Mar 2028
  • Revised completionRevised to 30 Mar 2028 (originally 30 Mar 2024)
  • Buildings1 building record
  • Documents filed244 files

Current status

8%9 of 112 units booked
56.7%Work done, per cost certificate

Figures as on 11 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A-AzaleaNA16141120112

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 11 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 65%.

A-Azalea: 70% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises65%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks15%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.60%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.25%

Progress on shared amenities15

As on 11 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes20%
Water SupplyYes10%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes10%
Storm Water DrainsYes50%
Landscaping & Tree PlantingYes50%
Street LightingYes50%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes50%
Electrical meter room, sub-station, receiving stationYes50%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed218

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots218
Closed/Covered218

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area28,300 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofSWAMIH Investment Fund I
Secured amountRs 50.00 crore
CERSAI search filedYes
Declared on13 Oct 2025

Approvals and building plan

Permissible FSI5403.66
Proposed, not sanctioned5,404 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPlot no-P/24,NR Sakal Circle, MIDC Satpur, 422007
Estimated costRs 20.93 cr
Cost incurredRs 11.87 cr
Work done56.7%
BuildingWingEstimatedIncurred
A-AzaleaNARs 12.84 crRs 6.50 cr
-NARs 8.10 crRs 5.37 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDinesh Bhamre
EngineerBharat R Bhavar
Chartered AccountantG P W & Associates
Chartered AccountantVikas Bajirao Pagar
Chartered AccountantAASHIKA CHOPDA AND ASSOCIATES
Chartered AccountantJanorkar & Associates
PartnerRole in project
Pancharatna Builcon Pvt. Ltd-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51600019336Mar 2024 → Mar 2028

Reason as filed by the promoterDear Sir/Madam, I am writing to request an extension of my registration under the Maharashtra Real Estate Regulatory Authority (MahaRERA). My registration details are as follows: Project Name: Nayantara Presidency - Phase4 (A wing & Podium). MahaRERA Registration NumberP51600000098 Due to unforeseen circumstances, I require additional time to complete the project in compliance with the regulations set forth by MahaRERA. The reasons for the extension request include short fall of flat bookings & storage of material on site. I assure you that despite the challenges faced, I am committed to compl

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
SM12500086Ram GPancharatna Builcon Pvt. Ltd11/08/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 22 Jun 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 27 May 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 13 Mar 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 16 Jan 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Mar 2028

Documents filed244

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 244 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: ARCHITECTS CERTIFICATE-PHASE 4.pdf11 Jul 2026
Withdrawal Update Form 2File: ENGINEER CERTIFICATE-PHASE 4.pdf11 Jul 2026
Withdrawal Update Form 3File: FORM 3 PHASE 4.pdf11 Jul 2026
Form 5 (FY 2025-2026)File: FORM-PH 4.pdf8 Jun 2026
Layout approvalFile: Highlighted Layout Phase - 4.pdf27 May 2026
Form 2A (FY 2025-2026)File: CERTIFICATE FOR QUALITY ASSURANCE PH4.pdf15 Apr 2026
Withdrawal Update Form 1File: ARCHITECTS CERTIFICATE PH4.pdf14 Apr 2026
Withdrawal Update Form 2File: ENGINEERS CERTIFICATE PH4.pdf14 Apr 2026
Withdrawal Update Form 3File: CA CERTIFICATE PH4.pdf14 Apr 2026
Layout approvalFile: s2 Area Statement.pdf13 Mar 2026
Layout approvalFile: s3_Terrace Balcony Staircase Passage Area.pdf13 Mar 2026
Building plan approvalFile: S4_Basement Floor Plan.pdf13 Mar 2026
Building plan approvalFile: S5_Ground Floor Plan.pdf13 Mar 2026
Building plan approvalFile: S6_1st Floor Plan.pdf13 Mar 2026
Building plan approvalFile: S7_2nd Floor Plan.pdf13 Mar 2026
Building plan approvalFile: S8_4th Floor Plan.pdf13 Mar 2026
Building plan approvalFile: S9_3rd 5th Floor Plan.pdf13 Mar 2026
Building plan approvalFile: S10_6 10 12th Floor Plan.pdf13 Mar 2026
Building plan approvalFile: S11_7 9 11th Floor Plan.pdf13 Mar 2026
Building plan approvalFile: S12_8th Floor Plan.pdf13 Mar 2026
Building plan approvalFile: S13_13th Floor Plan.pdf13 Mar 2026
Building plan approvalFile: S14_14th Floor Plan.pdf13 Mar 2026
Building plan approvalFile: S15_Terrace Floor Plan.pdf13 Mar 2026
Building plan approvalFile: S16_Section Plan.pdf13 Mar 2026
Building plan approvalFile: S17_Elevation North side.pdf13 Mar 2026
Building plan approvalFile: S18_Elevation Ground Floor plan.pdf13 Mar 2026
Building plan approvalFile: S19_Section First Floor Plan.pdf13 Mar 2026
Withdrawal Update Form 1File: ARCHITECT PHASE-4.pdf13 Mar 2026
Withdrawal Update Form 2File: ENGINEER PHASE-IV.pdf13 Mar 2026
Withdrawal Update Form 3File: Revised Form 3- Phase 4.pdf13 Mar 2026
Withdrawal Update Form 1File: ARCHITECT PHASE-4.pdf10 Jan 2026
Withdrawal Update Form 2File: ENGINEER PHASE-IV.pdf10 Jan 2026
Withdrawal Update Form 3File: CA Certificate_PH-4.pdf10 Jan 2026
Form 5 (FY 2024-2025)File: PHASE 4-FORM-5.pdf27 Dec 2025
Building plan approvalFile: S4 (2)_compressed.pdf28 Nov 2025
Building plan approvalFile: S5_compressed.pdf28 Nov 2025
Building plan approvalFile: S6_compressed.pdf28 Nov 2025
Building plan approvalFile: S7_compressed.pdf28 Nov 2025
Building plan approvalFile: S8_compressed.pdf28 Nov 2025
Building plan approvalFile: S9_compressed.pdf28 Nov 2025
Building plan approvalFile: S10_compressed.pdf28 Nov 2025
Building plan approvalFile: S11_compressed.pdf28 Nov 2025
Building plan approvalFile: S12_compressed.pdf28 Nov 2025
Building plan approvalFile: S13_compressed.pdf28 Nov 2025
Building plan approvalFile: S14_compressed.pdf28 Nov 2025
Building plan approvalFile: S15_compressed.pdf28 Nov 2025
Building plan approvalFile: S16_compressed.pdf28 Nov 2025
Building plan approvalFile: S17_compressed.pdf28 Nov 2025
Building plan approvalFile: S18_compressed.pdf28 Nov 2025
Building plan approvalFile: S19_compressed.pdf28 Nov 2025
Layout approvalFile: s1 (2)_compressed.pdf28 Nov 2025
Layout approvalFile: s2 (2)_compressed.pdf28 Nov 2025
Layout approvalFile: s3 (2)_compressed.pdf28 Nov 2025
Withdrawal Update Form 1File: ARCHITECTu0027S CERTIFICATE-PHASE-4.pdf28 Nov 2025
Withdrawal Update Form 2File: ENGINEERu0027S CERTIFICATE-098 NOV.pdf28 Nov 2025
Withdrawal Update Form 3File: FORM3 PHASE-IV.pdf28 Nov 2025
Form 1File: Architect Certificate_PBPL_Phase-IV.pdf14 Aug 2025
Form 3File: CA Certificate-PH-IV.pdf14 Aug 2025
Form 2File: ENGINEER'S CERTIFICATE-PH-IV-098.pdf14 Aug 2025
Disclosure of Sold and Booked InventoryFile: PBPL-Sold & Unsold-Phase-4.pdf14 Aug 2025
Form 1File: Architect Certificate_PBPL_Phase-IV.pdf14 Aug 2025
Form 2File: ENGINEER'S CERTIFICATE-PH-IV-098.pdf14 Aug 2025
Form 3File: CA Certificate-PH-IV.pdf14 Aug 2025
Disclosure of Sold and Booked InventoryFile: PBPL-Sold & Unsold-Phase-4.pdf14 Aug 2025
Certificates of CA (Form 3)File: CA CERTIFICATE-Phase 4.pdf20 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT'S CERTIFICATE-098-PH-IV.pdf18 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER'S CERTIFICATE-098-PH-IV.pdf18 Apr 2025
Disclosure of sold/ booked inventoryFile: INFORMATION OF SOLD-098-PH-IV.pdf18 Apr 2025
Certificates of CA (Form 3)File: PBPL- CA CERTIFICATE-098-PH-4.pdf21 Jan 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: PBPL- ARCHITECT'S CERTIFICATE-098-PH-4.pdf20 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: PBPL- ENGINEER'S CERTIFICATE-098-PH-4.pdf20 Jan 2025
Disclosure of sold/ booked inventoryFile: PBPL- SOLD AND UNSOLD -098-PH-4.pdf20 Jan 2025
Certificates of CA (Form 3)File: FORM NO-3-CERTIFICATE-PBPL-PH-4.pdf14 Nov 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER'S CERTIFICATE-PH-IV-PBPL.pdf11 Nov 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: PBPL-Architech Certificate-098.pdf19 Jul 2024
Certificates of CA (Form 3)File: PBPL-CA Certificate-098.pdf19 Jul 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: PBPL-CA Annual Report Annexure-F-Form-5-098.pdf19 Jul 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER'S CERTIFICATE-098.pdf18 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: ENGINEER'S CERTIFICATE FOR QUALITY ASSURANCE-098.pdf18 Jul 2024
Disclosure of sold/ booked inventoryFile: INFORMATION OF SOLD AND UNSOLD-098.pdf18 Jul 2024

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationRegisteredStatusPromisedDelivered
Anmol Nayantara City Two phase 2P51600000215Karmayogi nagar, NashikJul 2017Certificate SignedJul 2024Registered original: Jun 2021Jun 2022

How this compares with Nashik

8%of this project is bookeddistrict median 17%
10%of Nashik projects moved their completion datethis one moved by 48 months
19%of Nashik registrations have lapsed or been cancelledthis one is on the register

Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.

Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Nayantara Presidency Phase 4 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Rajiv nagar4,100+ in Nashik

2 kmNayantara Presidency PhaCompleted 109Lapsed / revoked 26Other 73Dot size: filed unitsN

Filed coordinates, straight-line distance. 208 registered projects within 2 km.

Builder: Pancharatna Builcon Pvt. Ltd

Pancharatna Builcon Pvt. Ltd has 4 registrations on MahaRERA, including Nayantara Presidency Phase 1 and Nayantara Presidency Phase 2. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Nashik district page.

Frequently asked questions

What are my rights if Nayantara Presidency Phase 4 is delayed beyond 30 Mar 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Nayantara Presidency Phase 4?

The registered promoter entity is Pancharatna Builcon Pvt. Ltd, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Nayantara Presidency Phase 4?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Nayantara Presidency Phase 4?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Nayantara Presidency Phase 4?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Nayantara Presidency Phase 4?

The professionals named in the filing: Architect: Dinesh Bhamre; Engineer: Bharat R Bhavar; Chartered Accountant: G P W & Associates; Chartered Accountant: Vikas Bajirao Pagar; Chartered Accountant: AASHIKA CHOPDA AND ASSOCIATES; Chartered Accountant: Janorkar & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Nayantara Presidency Phase 4?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Nayantara Presidency Phase 4. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Nayantara Presidency Phase 4 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.