YASHWANT SQUARE
RG-MH-22486 · RERA P52700031459 · Last updated on MahaRERA portal: 21 Aug 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Completion date moved by 24 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Satara registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
YASHWANT SQUARE is a Residential / Group Housing project by RAHULDEV PROMOTERS SATARA in Satara, Maharashtra, registered with MahaRERA as P52700031459 on 23 Oct 2021. Possession is promised by 31 Dec 2027. The completion date has moved by 24 months from the original filing. 41 of the 52 units on this registration are recorded sold or booked, and 4 of 22 construction stages are filed complete.
At a glance
Project
- NameYASHWANT SQUARE
- TypeResidential / Group Housing
- Location
- -
- Karanje Tarf Satara (CT)
- Satara
- 415001
- Pincode415001
- RERA no.P52700031459
- ReraGenie IDRG-MH-22486
Builder
- NameRAHULDEV PROMOTERS SATARA
- Entity typePartnership
- PartnersSHRIKANT BHAGWAN MOHITE, MADHUKAR BAPU MOHITE
- Other registrations2 more →
- No longer live1 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on23 Oct 2021
- Promised completion31 Dec 2027
- Revised completionRevised to 31 Dec 2027 (originally 31 Dec 2025)
- Buildings2 building records
- Documents filed54 files
Current status
Figures as on 21 Aug 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| YASHWANT SQUARE C WING | NA | 8 | 7 | 26 | 0 | 26 |
| YASHWANT SQUARE D WING | NA | 8 | 7 | 26 | 0 | 26 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 21 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
4 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 70%.
YASHWANT SQUARE C WING25%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 70% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 10% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
YASHWANT SQUARE D WING25%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 60% |
| Slabs of Super Structure | 10% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 21 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | No | Not applicable |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | No | Not applicable |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed66
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| YASHWANT SQUARE C WING | 8 | 25 | 33 |
| YASHWANT SQUARE D WING | 8 | 25 | 33 |
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| YASHWANT SQUARE C WING | NA | Rs 5.85 cr | Rs 4.53 cr |
| YASHWANT SQUARE D WING | NA | Rs 5.85 cr | Rs 4.53 cr |
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | SUMIT BAGADE BAGADE |
| Engineer | NIKHIL MALI MALI |
| Chartered Accountant | RUPALI GAWADE GAWADE |
| Chartered Accountant | Ganesh Khalavkar And Associates |
| Chartered Accountant | R H Pothiwal & Associates |
| Chartered Accountant | Sachin K. Mishra & Co |
| Partner | Role in project |
|---|---|
| RAHULDEV PROMOTERS SATARA | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterThere were liquidity issues and delays in funding. Labour and material shortages, along with disruptions in supply chains and workforce availability, are impacting construction timelines.
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 9 Oct 2021 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 17 Mar 2026 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 17 Mar 2026 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 6 Oct 2021Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2027
Documents filed54
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1_Jun 26.pdf | 21 Aug 2026 |
| Withdrawal Update Form 2File: Form 2_Jun 26.pdf | 21 Aug 2026 |
| Withdrawal Update Form 3File: Form 3_Jun 26.pdf | 21 Aug 2026 |
| Withdrawal Update Form 1File: Architect Certificate - March 26.pdf | 23 Apr 2026 |
| Withdrawal Update Form 2File: Engineer Certificate - March 26.pdf | 23 Apr 2026 |
| Withdrawal Update Form 3File: CA Certificate_March 26.pdf | 23 Apr 2026 |
| Layout approvalFile: Layout Approval Plan.pdf | 17 Mar 2026 |
| Building plan approvalFile: Revised Sanctioned Plan.pdf | 17 Mar 2026 |
| Form 1File: Architect Certificate - Rahuldev Builders March 22.pdf | 4 Mar 2026 |
| Form 2File: ENGINEERS CERTIFICATE Mar 22.pdf | 4 Mar 2026 |
| Form 3File: CA-CERTIFICATE Mar 22.pdf | 4 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Booked Inventory - Mar 22.pdf | 4 Mar 2026 |
| Form 1File: Architect Certificate - Rahuldev Builders March 23.pdf | 4 Mar 2026 |
| Form 2File: ENGINEERS CERTIFICATE Mar 23.pdf | 4 Mar 2026 |
| Form 3File: CA-CERTIFICATE Mar 23.pdf | 4 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Booked Inventory - Mar 23.pdf | 4 Mar 2026 |
| Form 1File: Architect Certificate - Rahuldev Builders March 24.pdf | 4 Mar 2026 |
| Form 2File: ENGINEERS CERTIFICATE Mar 24.pdf | 4 Mar 2026 |
| Form 3File: CA-CERTIFICATE Mar 24.pdf | 4 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Booked Inventory - Mar 24.pdf | 4 Mar 2026 |
| Form 1File: Architect Certificate - Rahuldev Builders March 25.pdf | 4 Mar 2026 |
| Form 2File: ENGINEERS CERTIFICATE Mar 25.pdf | 4 Mar 2026 |
| Form 3File: CA-CERTIFICATE Mar 25.pdf | 4 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Booked Inventory - Mar 25.pdf | 4 Mar 2026 |
| Withdrawal Update Form 1File: Architect Certificate - Rahuldev Builders Jun 25.pdf | 4 Mar 2026 |
| Withdrawal Update Form 1File: Architect Certificate - Rahuldev Builders Sep 25.pdf | 4 Mar 2026 |
| Withdrawal Update Form 1File: Architect Certificate - Rahuldev Builders Dec 25.pdf | 4 Mar 2026 |
| Withdrawal Update Form 2File: ENGINEERS CERTIFICATE Jun 25.pdf | 4 Mar 2026 |
| Withdrawal Update Form 2File: ENGINEERS CERTIFICATE Sep 25.pdf | 4 Mar 2026 |
| Withdrawal Update Form 2File: ENGINEERS CERTIFICATE Dec 25.pdf | 4 Mar 2026 |
| Withdrawal Update Form 3File: CA-CERTIFICATE Jun 25.pdf | 4 Mar 2026 |
| Withdrawal Update Form 3File: CA-CERTIFICATE Sep 25.pdf | 4 Mar 2026 |
| Withdrawal Update Form 3File: CA-CERTIFICATE Dec 25.pdf | 4 Mar 2026 |
| Form 2A (FY 2021-2022)File: Form 2A - 21-2022.pdf | 4 Mar 2026 |
| Form 2A (FY 2022-2023)File: Form 2A - 22-2023.pdf | 4 Mar 2026 |
| Form 2A (FY 2023-2024)File: Form 2A - 23-2024.pdf | 4 Mar 2026 |
| Form 2A (FY 2024-2025)File: Form 2A - 24-2025.pdf | 4 Mar 2026 |
| Form 5 (FY 2021-2022)File: CA-RERA AUDIT REPORT 2021-22.pdf | 3 Mar 2026 |
| Form 5 (FY 2022-2023)File: CA-RERA AUDIT REPORT 2022-23.pdf | 3 Mar 2026 |
| Form 5 (FY 2023-2024)File: CA-RERA AUDIT REPORT 2023-24.pdf | 3 Mar 2026 |
| Form 5 (FY 2024-2025)File: CA-RERA AUDIT REPORT 2024-25.pdf | 3 Mar 2026 |
| Copy of the legal title reportFile: SCAN_20211008_203404750.pdf | 9 Oct 2021 |
| Layout approvalFile: plan.pdf | 6 Oct 2021 |
| Building plan approvalFile: plan.pdf | 6 Oct 2021 |
| PAN CardFile: pan.pdf | 6 Oct 2021 |
| Details of encumbrancesFile: non incumbrances.pdf | 6 Oct 2021 |
| Copy of Layout Approval (in case of layout)File: plan.pdf | 6 Oct 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: plan.pdf | 6 Oct 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: building permission.pdf | 6 Oct 2021 |
| Declaration about Commencement CertificateFile: declartion commencement.pdf | 6 Oct 2021 |
| Declaration in FORM BFile: b form.pdf | 6 Oct 2021 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: c a certificate.pdf | 6 Oct 2021 |
| Proforma of Allotment letterFile: booking letter.pdf | 6 Oct 2021 |
| Proforma of Allotment letterFile: yashwant square.pdf | 6 Oct 2021 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Satara
Computed across the 1,100+ Satara projects on ReraGenie, from their own filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 2 other registrations, which the RERA portal never shows together
- All 54 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep YASHWANT SQUARE on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near -1,100+ in Satara
PRADHAN MANTRI AWAS YOJANA SATARA PHASE I
SATARA MUNICIPAL COUNCIL SATARA
LANDMARK TOWERS
KANGRALKAR INFRASTRUCTURE
Bhuvi Commercia
LAXMI NARAYAN INDUSTRIES
SAMARVEER SKYLINE
SHRI MANGALMURTI BUILDERS
Mathura
Balkrishna Pandurang Jadhav
BAJIRAO EMPIRE
SHREE SHESHACHAL DEVELOPERS
See every Satara project, with the district possession charts
Builder: RAHULDEV PROMOTERS SATARA
RAHULDEV PROMOTERS SATARA has 3 registrations on MahaRERA, including SHREE GANESH PARK and YASHWANT SQUARE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Satara district page.
Frequently asked questions
What are my rights if YASHWANT SQUARE is delayed beyond 31 Dec 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of YASHWANT SQUARE?
The registered promoter entity is RAHULDEV PROMOTERS SATARA, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in YASHWANT SQUARE?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for YASHWANT SQUARE?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at YASHWANT SQUARE?
The professionals named in the filing: Architect: SUMIT BAGADE BAGADE; Engineer: NIKHIL MALI MALI; Chartered Accountant: RUPALI GAWADE GAWADE; Chartered Accountant: Ganesh Khalavkar And Associates; Chartered Accountant: R H Pothiwal & Associates; Chartered Accountant: Sachin K. Mishra & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in YASHWANT SQUARE?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback