Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration.
See what the report covers Free either way: or have every new Chandrapur registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
YASHODHAN VEHAR PART - 1 is a Residential / Group Housing project by PM INFRAVENTURES in Chandrapur, Maharashtra, registered with MahaRERA as P50900026926 on 3 Nov 2020. The registration is recorded completed; possession was promised by 30 Jun 2025.
At a glance
Project
- NameYASHODHAN VEHAR PART - 1
- TypeResidential / Group Housing
- Location
- NANDA FATA
- Nanda (CT)
- Korpana
- Chandrapur
- 442917
- Pincode442917
- RERA no.P50900026926
- ReraGenie IDRG-MH-03493
Builder
- NamePM INFRAVENTURES
- Entity typeOthers
- Named personPURNIMA SRIVASTAVA
- Other registrations1 more →
- Completed1 of 2
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on3 Nov 2020
- Promised completion30 Jun 2025
- Revised completionNone
- Buildings6 building records
- Documents filed76 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| B-40 | NA | 3 | 0 | 0 | 0 | 0 |
| B-41 | NA | 3 | 0 | 0 | 0 | 0 |
| B-42 | NA | 3 | 0 | 0 | 0 | 0 |
| B-43 | NA | 3 | 0 | 0 | 0 | 0 |
| B-44 | NA | 3 | 0 | 0 | 0 | 0 |
| B-45 | NA | 3 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building6
As on 22 Feb 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
44 of 66 construction stages are filed complete across 6 buildings. The stage furthest along is Internal walls, at 65%.
B-4073%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
B-4173%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
B-4273%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
B-4344%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 65% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 20% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
B-4473%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
B-4573%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 22 Feb 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 80% |
| Water Supply | Yes | 65% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 84% |
| Storm Water Drains | Yes | 55% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 33% |
| Community Buildings | Yes | 0% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 69% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 10% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 5% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed192
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Open Space | Total |
|---|---|---|
| B-40 | 32 | 32 |
| B-41 | 32 | 32 |
| B-42 | 32 | 32 |
| B-43 | 32 | 32 |
| B-44 | 32 | 32 |
| B-45 | 32 | 32 |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | AAJ ENGINEERS AND CONSULTANTS Pvt. Ltd. |
| Engineer | VINAY PASHINE |
| Chartered Accountant | SURESH TANEJA |
| Chartered Accountant | Hussain Shakir & Co |
| Partner | Role in project |
|---|---|
| PM INFRAVENTURES | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 30 Oct 2020 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 30 Oct 2020 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 30 Oct 2020 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 30 Oct 2020Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 14 Mar 2024
Documents filed76
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Oct to Dec 23- Phase 1- Architects Certificate (1).pdf | 22 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Phase 1- Form 1- Architects Certificate- Jan to Mar 24.pdf | 22 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Apr to Jun 24- Phase 1- Architects Certificate.pdf | 22 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: July to Sep 24- Phase 1- Architects Certificate.pdf | 22 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Oct to Dec 24- Phase 1- Architects Certificate.pdf | 22 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: July to Sept 23- Phase 1- Architects Certificate.pdf | 22 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 1 Form 3 phase 1 September 23.pdf | 22 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 2 Form 3 phase 1 Dec-23.pdf | 22 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3 Form 3 phase 1 March-24.pdf | 22 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 4 Form 3 phase 1 June-24.pdf | 22 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 4 Form 3 phase 1 Sept-24.pdf | 22 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Dec-24a.pdf | 22 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 1 30 09 23 144.pdf | 22 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 6 31 12 24 144.pdf | 22 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 5 30 09 24 144 1.pdf | 22 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 4 30 06 24 144.pdf | 22 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 3 31 03 24 144.pdf | 22 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 31 12 23 144.pdf | 22 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: Discloser Sold Booked Inventory144 Upto Sept 23 l.pdf | 22 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: Discloser Sold Booked Inventory 144 - Upto Dec 23.pdf | 22 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: Discloser Sold Booked Inventory 144 - Upto March 24.pdf | 22 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: Discloser Sold Booked Inventory 144 - Upto June 24.pdf | 22 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: Discloser Sold Booked Inventory 144 - Upto Sept 24.pdf | 22 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: Discloser Sold Booked Inventory 144 - Upto Dec 24.pdf | 22 Feb 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Phase FORM 5.pdf | 22 Feb 2025 |
| Proforma of Agreement for saleFile: Agreement to sale draft_compressed.pdf | 14 Mar 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC.pdf | 14 Mar 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM - V CA CERT FY 22-23 PH-I.pdf | 17 Feb 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 6926 March 23_compressed.pdf | 7 Feb 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 6926 June 23_compressed.pdf | 7 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ph-1 engg cert jan-mar23 .pdf | 13 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ph-1 engg cert apr-june23.pdf | 13 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Phase 1- Form 2- Engineers Certificate- July 22 to Sept 22.pdf | 1 May 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Phase 1- Form 2- Engineers Certificate- Sept 22 to Dec 22.pdf | 1 May 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate July 2022.pdf | 1 May 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: PHASE - I Q2_opt_compressed.pdf | 26 Apr 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: PHASE - I Q3_opt_compressed.pdf | 26 Apr 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Annual Audit Report of Statutory CA (Form 5) (FY 2021-22).pdf | 24 Apr 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Form Ph-1 Sep 2022_opt.pdf | 20 Feb 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Form Ph-1 Dec 2022_opt.pdf | 20 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 2021.pdf | 28 Jan 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 2022.pdf | 28 Jan 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ANNEXTURE A FORM 2_compressed.pdf | 9 Oct 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certi.pdf | 9 Oct 2022 |
| Disclosure of sold/ booked inventoryFile: Discloser Sold Booked Inventory 906 upto Apr22-June22.pdf | 9 Oct 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CERTIFICATE PHASE II (1)_compressed.pdf | 9 Oct 2022 |
| Disclosure of sold/ booked inventoryFile: Discloser Sold Booked Inventory 144 upto Apr22-June22.pdf | 28 Aug 2022 |
| Disclosure of sold/ booked inventoryFile: Disclosure Inventory Mar-22.pdf | 16 Apr 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE DEC-2021.pdf | 16 Apr 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE MARCH-22.pdf | 16 Apr 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate Dec21.pdf | 7 Apr 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate Dec21.pdf | 7 Apr 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate Dec21.pdf | 7 Apr 2022 |
| Disclosure of sold/ booked inventoryFile: Disclosure RS.pdf | 15 Jul 2021 |
| Layout approvalFile: Mhada Approved Layout Plan.pdf | 30 Oct 2020 |
| Building plan approvalFile: Building Approval Letter from MHADA.pdf | 30 Oct 2020 |
| Building plan approvalFile: Mhada Approved Building Layout Plan.pdf | 30 Oct 2020 |
| PAN CardFile: PAN -PMI.pdf | 30 Oct 2020 |
| Copy of the legal title reportFile: Title Verification Kh 35-1.pdf | 30 Oct 2020 |
| Copy of the legal title reportFile: Title Verification Kh 35 - 3.pdf | 30 Oct 2020 |
| Copy of the legal title reportFile: Title Verification Kh 55.pdf | 30 Oct 2020 |
| Copy of the legal title reportFile: Title Verification Kh 56.pdf | 30 Oct 2020 |
| Copy of the legal title reportFile: Title Verification Kh 57.pdf | 30 Oct 2020 |
| Details of encumbrancesFile: No Encumbrances Certificate.pdf | 30 Oct 2020 |
| Copy of Layout Approval (in case of layout)File: Mhada Approved Layout Plan.pdf | 30 Oct 2020 |
| Building Plan Approval / NA Order for plotted developmentFile: Building Approval Letter from MHADA.pdf | 30 Oct 2020 |
| Building Plan Approval / NA Order for plotted developmentFile: Mhada Approved Building Layout Plan.pdf | 30 Oct 2020 |
| Commencement Certificates / NA Order for plotted developmentFile: Part Commencement Certificate.pdf | 30 Oct 2020 |
| Declaration in FORM BFile: Affidavit cum Declaration.pdf | 30 Oct 2020 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Architects Certificate.pdf | 30 Oct 2020 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3.pdf | 30 Oct 2020 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Annexure-A.pdf | 30 Oct 2020 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Unsold Inventory Valuation.pdf | 30 Oct 2020 |
| Proforma of Allotment letterFile: Allotment letter.pdf | 30 Oct 2020 |
| Proforma of Allotment letterFile: DEED OF DECLARATION.pdf | 30 Oct 2020 |
| OtherFile: Environmental Clearance-1.PDF | 30 Oct 2020 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Chandrapur
Computed across the 220+ Chandrapur projects on ReraGenie, from their own filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 1 other registration, which the RERA portal never shows together
- All 76 filed documents as one ZIP, foldered, with a manifest
Keep YASHODHAN VEHAR PART - 1 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near NANDA FATA220+ in Chandrapur
Yashodhan Vihar
PM INFRAVENTURES
Suvarnabhumi - A Project by SDPL
SANDEEP DWELLERS PVT. LTD.
GAURAV NAGARI 2
PMG Associates
Vaishno City
Tushar Santosh Kumar Agarwal
VAISHNO CITY
Tushar Santosh Kumar Agarwal
CHAWHAN ROYALS
MANGESH RATILAL CHAWHAN
See every Chandrapur project, with the district possession charts
Builder: PM INFRAVENTURES
PM INFRAVENTURES has 2 registrations on MahaRERA, including YASHODHAN VEHAR PART - 1 and Yashodhan Vihar. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Chandrapur district page.
Frequently asked questions
What are my rights if YASHODHAN VEHAR PART - 1 is delayed beyond 30 Jun 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of YASHODHAN VEHAR PART - 1?
The registered promoter entity is PM INFRAVENTURES, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in YASHODHAN VEHAR PART - 1?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for YASHODHAN VEHAR PART - 1?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at YASHODHAN VEHAR PART - 1?
The professionals named in the filing: Architect: AAJ ENGINEERS AND CONSULTANTS Pvt. Ltd.; Engineer: VINAY PASHINE; Chartered Accountant: SURESH TANEJA; Chartered Accountant: Hussain Shakir & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in YASHODHAN VEHAR PART - 1?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback