Home / Browse projects / Sangli, Maharashtra / YASHODA PARK
YASHODA PARK
RG-MH-09487 · RERA P53100001110 · Last updated on MahaRERA portal: 3 May 2025
Source: official MahaRERA filing
Red flags
- Completion date moved by 23 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Sangli registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
YASHODA PARK is a Residential / Group Housing project by VARAD BHAGWANT DEVELOPERS in Sangli, Maharashtra, registered with MahaRERA as P53100001110 on 26 Jul 2017. The registration is recorded completed; possession was promised by 31 Dec 2023. The completion date has moved by 23 months from the original filing.
At a glance
Project
- NameYASHODA PARK
- TypeResidential / Group Housing
- Location
- Sangli Miraj Kupwad (M Corp.)
- Miraj
- Sangli
- 416416
- Pincode416416
- MapView location on Google Maps (as filed on RERA)
- RERA no.P53100001110
- ReraGenie IDRG-MH-09487
Builder
- NameVARAD BHAGWANT DEVELOPERS
- Entity typePartnership
- PartnersPRAMOD DATTATRAY SHINDE, PRAKASH DATTATRAYA SHINDE, AJINKYA PRAKASH SHINDE, ARUNA PRAMOD SHINDE, NIRAJ VIJAY NAWANDHAR, ABHIJIT HINDURAO PATIL
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on26 Jul 2017
- Promised completion31 Dec 2023
- Revised completionRevised to 31 Dec 2023 (originally 7 Jan 2022)
- Buildings4 building records
- Documents filed50 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| WING-A | NA | 2 | 0 | 0 | 0 | 0 |
| WING-B | NA | 2 | 0 | 0 | 0 | 0 |
| WING-C | NA | 2 | 0 | 0 | 0 | 0 |
| WING-D | NA | 8 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building4
As on 3 May 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
24 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Podiums (if any), at 0%.
WING-A73%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
WING-B73%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
WING-C73%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
WING-D0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 3 May 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 0% |
Parking filed25
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| WING-A | 15 | 0 | 15 |
| WING-D | 0 | 10 | 10 |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | AMBARNATH MANOHAR SHINDE |
| Engineer | NANDKUMAR KRISHNARAO PATIL |
| Chartered Accountant | V M NAWANDHAR |
| Partner | Role in project |
|---|---|
| VARAD BHAGWANT DEVELOPERS | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterDue to the floods of 2019 and 2021 and the epidemic of Kovid 19 in 2020, some construction work in this project is incomplete. Sangli district is in the permanent red zone due to the Kovid 19 epidemic and the laborers are coming from the surrounding villages and the neighboring state of Karnataka. But in Kovid 19, district ban and state ban children could not come. So the project remains unfinished. However, the above matters should be carefully considered and the term should be extended.
Litigation declared1
| Case | Court | Status |
|---|---|---|
| 57/2017 | SANGLI COURT | SUIT PENDING |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 20 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 20 Jul 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 19 Jul 2021 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 20 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 23 Feb 2023
Documents filed50
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 2023-24.pdf | 3 May 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 2A 21-22.pdf | 1 May 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 2A 22-23.pdf | 1 May 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 2A 23-24.pdf | 1 May 2025 |
| Architect’s Certificate on Completion of Project (Form 4)File: FORM 4.pdf | 21 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 YASHODA .pdf | 3 Oct 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1.pdf | 23 Feb 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 N.pdf | 23 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5.pdf | 23 Feb 2023 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: COMPLETION.pdf | 23 Feb 2023 |
| CERSAI detailsFile: cersai declaration.pdf | 10 Mar 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A c.pdf | 29 Jan 2022 |
| CERSAI detailsFile: CERSAI DECLARATION.pdf | 29 Jan 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: FORM 5 a.pdf | 29 Jan 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM 5 b.pdf | 29 Jan 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5 c.pdf | 29 Jan 2022 |
| Declaration about Commencement CertificateFile: commencemnt certificate.pdf | 3 Jan 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: architects certificate.pdf | 3 Jan 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: engineers certificate.pdf | 3 Jan 2022 |
| Disclosure of sold/ booked inventoryFile: disclosure of sold booked inventor.pdf | 3 Jan 2022 |
| Certificates of CA (Form 3)File: C A CERTIFICATE.pdf | 3 Jan 2022 |
| Building plan approvalFile: BUILDING A.pdf | 19 Jul 2021 |
| Building plan approvalFile: BUILDING B.pdf | 19 Jul 2021 |
| Building plan approvalFile: BUILDING C .pdf | 19 Jul 2021 |
| Building plan approvalFile: BUILDING D .pdf | 19 Jul 2021 |
| Building Plan Approval (IOD)File: BUILDING A.pdf | 19 Jul 2021 |
| Building Plan Approval (IOD)File: BUILDING B.pdf | 19 Jul 2021 |
| Building Plan Approval (IOD)File: BUILDING C .pdf | 19 Jul 2021 |
| Building Plan Approval (IOD)File: BUILDING D .pdf | 19 Jul 2021 |
| Form 2AFile: FORM 2A.pdf | 24 Apr 2019 |
| Certificates of CA (Form 5)File: FORM 5.pdf | 23 Feb 2019 |
| Building plan approvalFile: BUILDING A.pdf | 20 Jul 2017 |
| Building plan approvalFile: BUILDING B.pdf | 20 Jul 2017 |
| Building plan approvalFile: BUILDING C.pdf | 20 Jul 2017 |
| Building plan approvalFile: BUILDING D.pdf | 20 Jul 2017 |
| Layout approvalFile: lay out.pdf | 20 Jul 2017 |
| PAN CardFile: PAN CARD.pdf | 20 Jul 2017 |
| Copy of the legal title reportFile: SERACH REPORT.pdf | 20 Jul 2017 |
| Details of encumbrancesFile: ENCUMBRANCES.pdf | 20 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: lay out.pdf | 20 Jul 2017 |
| Building Plan Approval (IOD)File: BUILDING A.pdf | 20 Jul 2017 |
| Building Plan Approval (IOD)File: BUILDING B.pdf | 20 Jul 2017 |
| Building Plan Approval (IOD)File: BUILDING C.pdf | 20 Jul 2017 |
| Building Plan Approval (IOD)File: BUILDING D.pdf | 20 Jul 2017 |
| Commencement Certificates / NA Order for plotted developmentFile: PERMMISSION.pdf | 20 Jul 2017 |
| Declaration in FORM BFile: FORM B.pdf | 20 Jul 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT.pdf | 20 Jul 2017 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER.pdf | 20 Jul 2017 |
| Certificates of CA (Form 3)File: C A CERTIFICATE.pdf | 20 Jul 2017 |
| Proforma of Allotment letterFile: AG TO SALE AND ALLOTMENT.pdf | 20 Jul 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Sangli
Computed across the 790+ Sangli projects on ReraGenie, from their own filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 50 filed documents as one ZIP, foldered, with a manifest
Keep YASHODA PARK on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Sangli Miraj Kupwad (M Corp.)790+ in Sangli
Filed coordinates, straight-line distance. 20 registered projects within 2 km.
SIDDHI VASTU Puram
SIDDHIVINAYAK PLATINUM
SEVEN HILLS
SHRI HARIPRIYA BUILDERS AND DEVELOPERS LLP
EVARA ESTATE
DSDB REALTY LLP
VISION CITY
VISION GROUP
NAKSHTRA
SHIV-NAKSHTRA DEVELOPERS LLP
SAHYADRISIDDHI
SAHYADRIDEVELOPERS
See every Sangli project, with the district possession charts
Builder: VARAD BHAGWANT DEVELOPERS
VARAD BHAGWANT DEVELOPERS has 1 registration on MahaRERA, including YASHODA PARK. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Sangli district page.
Frequently asked questions
What are my rights if YASHODA PARK is delayed beyond 31 Dec 2023?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of YASHODA PARK?
The registered promoter entity is VARAD BHAGWANT DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in YASHODA PARK?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for YASHODA PARK?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at YASHODA PARK?
The professionals named in the filing: Architect: AMBARNATH MANOHAR SHINDE; Engineer: NANDKUMAR KRISHNARAO PATIL; Chartered Accountant: V M NAWANDHAR. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in YASHODA PARK?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback