Home / Browse projects / Sangli, Maharashtra / EVARA ESTATE
EVARA ESTATE
RG-MH-05681 · RERA P53100076645 · Last updated on MahaRERA portal: 27 May 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.
See what the report covers Free either way: or have every new Sangli registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
EVARA ESTATE is a Residential / Group Housing project by DSDB REALTY LLP in Sangli, Maharashtra, registered with MahaRERA as P53100076645 on 18 Jun 2024. Possession is promised by 31 Dec 2030. 35 of the 164 units on this registration are recorded sold or booked, and 8 of 44 construction stages are filed complete.
At a glance
Project
- NameEVARA ESTATE
- TypeResidential / Group Housing
- Location
- 100FT ROAD BEHIND SAROWAR HOTEL
- VISHRAMBAG
- Sangli Miraj Kupwad (M Corp.)
- Miraj
- Sangli
- 416416
- Pincode416416
- MapView location on Google Maps (as filed on RERA)
- RERA no.P53100076645
- ReraGenie IDRG-MH-05681
Builder
- NameDSDB REALTY LLP
- Entity typePartnership
- PartnerDANDEKAR BROTHERS LLP POA ABHIJIT SHANKAR PATKI
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on18 Jun 2024
- Promised completion31 Dec 2030
- Revised completionNone
- Buildings4 building records
- Documents filed104 files
Current status
Figures as on 27 May 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| BUILDING A | NA | 17 | 16 | 52 | 7 | 59 |
| BUILDING B | NA | 16 | 15 | 50 | 0 | 50 |
| BUILDING C | NA | 16 | 15 | 52 | 0 | 52 |
| BUILDING D | NA | 3 | 3 | 3 | 0 | 3 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building4
As on 27 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
8 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Slabs of Super Structure, at 53%.
BUILDING A42%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 53% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 5% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
BUILDING B39%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 24% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
BUILDING C0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
BUILDING D0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 27 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 0% |
Parking filed294
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| BUILDING A | 105 | 105 |
| BUILDING B | 90 | 90 |
| BUILDING C | 94 | 94 |
| BUILDING D | 5 | 5 |
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| BUILDING A | NA | Rs 28.30 cr | Rs 11.20 cr |
| BUILDING B | NA | Rs 28.30 cr | Rs 5.09 cr |
| BUILDING C | NA | Rs 28.30 cr | - |
| BUILDING D | NA | Rs 3.80 cr | - |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | SAMBHAJI PATIL |
| Engineer | namdev pandurang chavan |
| Engineer | SANTOSH MAHADEV LATAWADE |
| Chartered Accountant | amit anil shende |
| Chartered Accountant | MAHESH V THANEDAR |
| Partner | Role in project |
|---|---|
| DSDB REALTY LLP | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 3 May 2024 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 19 Apr 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 20 Apr 2026 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 19 Apr 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2030
Documents filed104
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 104 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 2A (FY 2024-2025)File: Form 2A 24-25 ..pdf | 27 May 2026 |
| Withdrawal Update Form 1File: FORM-1 31-03-2026 .pdf | 26 May 2026 |
| Withdrawal Update Form 2File: FORM-2 31-03-2026 .pdf | 26 May 2026 |
| Withdrawal Update Form 3File: FORM-3 31-03-2026 .pdf | 26 May 2026 |
| Building plan approvalFile: GROUND FLOOR PARKING SHEET 1-22_compressed.pdf | 20 Apr 2026 |
| Building plan approvalFile: PARKING PLAN SHEET 2-22_compressed.pdf | 20 Apr 2026 |
| Building plan approvalFile: FIRST FLOOR BLDG A 3-22.pdf | 20 Apr 2026 |
| Building plan approvalFile: SECOND THIRD FLOOR BLDG A 4-22.pdf | 20 Apr 2026 |
| Building plan approvalFile: TYP 4 5 7 8 9 10 12 6 TO 11 FLOOR BLDG A 5-22.pdf | 20 Apr 2026 |
| Building plan approvalFile: TYP 13 14 FLOOR BLDG A 6-22.pdf | 20 Apr 2026 |
| Building plan approvalFile: TYP 15 AND TERRACE FLOOR BLDG A 7-22.pdf | 20 Apr 2026 |
| Building plan approvalFile: EAST SIDE ELEVATION SECTION B B BLDG A 8-22_compressed.pdf | 20 Apr 2026 |
| Building plan approvalFile: FIRST FLOOR BLDG B 9-22.pdf | 20 Apr 2026 |
| Building plan approvalFile: SECOND FLOOR BLDG B 10-22.pdf | 20 Apr 2026 |
| Building plan approvalFile: TYP 4 5 7 8 9 10 12 6 11 FLOOR BLDG B 11-22_compressed.pdf | 20 Apr 2026 |
| Building plan approvalFile: TYP 13 14 FLOOR PLAN BLDG B 12-22_compressed.pdf | 20 Apr 2026 |
| Building plan approvalFile: TYP 15 TERRACE FLOOR PLAN BLDG B 13-22.pdf | 20 Apr 2026 |
| Building plan approvalFile: EAST SIDE ELEVATION SECTION B B BLDG B 14-22_compressed.pdf | 20 Apr 2026 |
| Building plan approvalFile: FIRST FLOOR PLAN BLDG C 15-22.pdf | 20 Apr 2026 |
| Building plan approvalFile: SECOND FLOOR PLAN BLDG C 16-22.pdf | 20 Apr 2026 |
| Building plan approvalFile: TYP 4 5 7 8 9 10 12 6 11 FLOOR PLAN BLDG C 17-22.pdf | 20 Apr 2026 |
| Building plan approvalFile: TYP 13 14 FLOOR PLAN BLDG C 18-22.pdf | 20 Apr 2026 |
| Building plan approvalFile: TYP 15 TERRCAE FLOOR PLAN BLDG C 19-22.pdf | 20 Apr 2026 |
| Building plan approvalFile: EAST SIDE ELEVATION SECTION B B BLDG C 20-22_compressed.pdf | 20 Apr 2026 |
| Building plan approvalFile: BUILDING D BUNGALOW 21-22_compressed.pdf | 20 Apr 2026 |
| Building plan approvalFile: CLUB HOUSE DRG 22-22.pdf | 20 Apr 2026 |
| Withdrawal Update Form 1File: FORM 1_31122025_EVARA.pdf | 18 Mar 2026 |
| Withdrawal Update Form 2File: FORM 2_31122025_EVARA.pdf | 18 Mar 2026 |
| Withdrawal Update Form 3File: Withdrawal Application Form3 _FINAL.pdf | 18 Mar 2026 |
| Form 5 (FY 2024-2025)File: Form 5_EVARA_24-25.pdf | 18 Mar 2026 |
| Withdrawal Update Form 1File: form-1 qtr ending sep 25 signed.pdf | 13 Nov 2025 |
| Withdrawal Update Form 2File: form-2 qtr ending sep25.pdf | 13 Nov 2025 |
| Withdrawal Update Form 3File: Withdrawal Application Form3 _with sign.pdf | 13 Nov 2025 |
| Withdrawal Update Form 1File: form-1 30062025 SIGNED for upload.pdf | 31 Aug 2025 |
| Withdrawal Update Form 1File: form-1 30062025 SIGNED for upload.pdf | 31 Aug 2025 |
| Withdrawal Update Form 2File: form-2 engineer certificate 07-07-25 SIGNED.pdf | 31 Aug 2025 |
| Withdrawal Update Form 2File: form-2 engineer certificate 07-07-25 SIGNED.pdf | 31 Aug 2025 |
| Withdrawal Update Form 3File: Form3_Evara_30062025 FOR UPLOADED.pdf | 31 Aug 2025 |
| Withdrawal Update Form 3File: Form3_Evara_30062025 FOR UPLOADED.pdf | 31 Aug 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3.pdf | 2 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architects certificates form-1 mar 25.pdf | 15 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engineer certificate qtr ending mar 25_.pdf | 15 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: sold unsold qtr ending mar 25 _.pdf | 15 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA form 3 - 31122024.pdf | 20 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form-1 31-12-24.pdf | 13 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engineer certificate 31-12-24.pdf | 13 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM -3 JUNE.pdf | 12 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM -3 SEPTEMBER.pdf | 12 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: INFORNMETION OF SOLD-BOOKED INVENTORY 30-9-24.pdf | 12 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM -1 01-07-24.pdf | 6 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 01-10-24.pdf | 6 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM -2 05-07-24.pdf | 6 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 05-10-24.pdf | 6 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: INFORNMETION OF SOLD-BOOKED INVENTORY 30-6-24.pdf | 6 Dec 2024 |
| Building plan approvalFile: MAIL TO RERA CC VERIFICATION.pdf | 10 Jun 2024 |
| Building plan approvalFile: TYP 4 5 7 8 9 10 12 6 11 13 14 15 TERRACE FLOOR BLDG B SHEET 11 12 AND 13.pdf | 10 Jun 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: TYP 4 5 7 8 9 10 12 6 11 13 14 15 TERRACE FLOOR BLDG B SHEET 11 12 AND 13.pdf | 10 Jun 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: MAIL TO RERA CC VERIFICATION.pdf | 10 Jun 2024 |
| Building plan approvalFile: TYP 15 TERRCAE FLOOR PLAN BLDG C 19-22 AND 20_22compressed.pdf | 7 Jun 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: TYP 15 TERRCAE FLOOR PLAN BLDG C 19-22 AND 20_22compressed.pdf | 7 Jun 2024 |
| Other - LegalFile: self declaration for cub house.pdf | 4 Jun 2024 |
| Other - LegalFile: MAIL TO RERA CC VERIFICATION.pdf | 30 May 2024 |
| Building plan approvalFile: FIRST SECOND TYP 4 5 7 8 9 10 12 6 11 FLOOR PLAN BLDG C SHEET15 16 AND 17.pdf | 28 May 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: FIRST SECOND TYP 4 5 7 8 9 10 12 6 11 FLOOR PLAN BLDG C SHEET15 16 AND 17.pdf | 28 May 2024 |
| Copy of the legal title reportFile: SEARCH REPORT FINAL.pdf | 3 May 2024 |
| Declaration about Commencement CertificateFile: DECLARATION ABOUT COMM CERTIFICATE DSDB1.pdf | 3 May 2024 |
| Other - LegalFile: CERTIFIED TRUE COPY OF THE CIRCULAR RESOLUTION PASSED BY DESIGNED PARTNERS.pdf | 3 May 2024 |
| Other - TechnicalFile: DECLARATION CUM UNDERTAKING ORDER 50.pdf | 3 May 2024 |
| Layout approvalFile: LAYOUT PLAN.pdf | 19 Apr 2024 |
| Building plan approvalFile: GROUND AND PARKING SHEET 1 AND 2.pdf | 19 Apr 2024 |
| Building plan approvalFile: first and second bld A sheet 3 and 4.pdf | 19 Apr 2024 |
| Building plan approvalFile: TYP 4 5 7 8 9 10 12 6 TO 11 FLOOR and typ 13 14 BLDG A sheet 5 and 6.pdf | 19 Apr 2024 |
| Building plan approvalFile: TYP 15 AND TERRACE FLOOR ELEVATION SECTION BLDG A SHEET 7 AND 8.pdf | 19 Apr 2024 |
| Building plan approvalFile: FIRST AND SECOND FLOOR BLDG B SHEET 9 AND 10.pdf | 19 Apr 2024 |
| Building plan approvalFile: EAST SIDE ELEVATION SECTION B B BLDG B 14-22_compressed.pdf | 19 Apr 2024 |
| Building plan approvalFile: GROUND FLOOR PARKING SHEET 1-22_ 18_22.pdf | 19 Apr 2024 |
| Building plan approvalFile: BUILDING D BUNGALOW AND CLUB HOUSE SHEET 21 AND 22.pdf | 19 Apr 2024 |
| Details of encumbrances concerned to FinanceFile: NON ENCUMBRANCE CERTIFICATE.pdf | 19 Apr 2024 |
| Details of encumbrances concerned to FinanceFile: NO ENCUMBRANCE CERTIFICATE - LEGAL.pdf | 19 Apr 2024 |
| Details of encumbrances concerned to LegalFile: NON ENCUMBRANCE CERTIFICATE.pdf | 19 Apr 2024 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Sangli
Computed across the 790+ Sangli projects on ReraGenie, from their own filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 104 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep EVARA ESTATE on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near VISHRAMBAG790+ in Sangli
Filed coordinates, straight-line distance. 203 registered projects within 2 km.
SIDDHI VASTU Puram
SIDDHIVINAYAK PLATINUM
SEVEN HILLS
SHRI HARIPRIYA BUILDERS AND DEVELOPERS LLP
VISION CITY
VISION GROUP
NAKSHTRA
SHIV-NAKSHTRA DEVELOPERS LLP
SAHYADRISIDDHI
SAHYADRIDEVELOPERS
IRISH ORISON
CHAITANYA CONSTRUCTIONS
See every Sangli project, with the district possession charts
Builder: DSDB REALTY LLP
DSDB REALTY LLP has 1 registration on MahaRERA, including EVARA ESTATE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Sangli district page.
Frequently asked questions
What are my rights if EVARA ESTATE is delayed beyond 31 Dec 2030?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of EVARA ESTATE?
The registered promoter entity is DSDB REALTY LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in EVARA ESTATE?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for EVARA ESTATE?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at EVARA ESTATE?
The professionals named in the filing: Architect: SAMBHAJI PATIL; Engineer: namdev pandurang chavan; Engineer: SANTOSH MAHADEV LATAWADE; Chartered Accountant: amit anil shende; Chartered Accountant: MAHESH V THANEDAR. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in EVARA ESTATE?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback