ReraGenieLog inGet a buyer report

Home / Browse projects / Raigarh, Maharashtra / YASHO NANDANVAN CO-OPERATIVE HOUSING SOCIETY LTD.

Registered No litigation declared Residential / Group Housing project

YASHO NANDANVAN CO-OPERATIVE HOUSING SOCIETY LTD.

By KEDAR BUILDCON PRIVATE LIMITED

RG-MH-05819 · RERA P52000051284 · Last updated on MahaRERA portal: 26 May 2026

Source: official MahaRERA filing

Red flags

  • Possession 1 months past the filed date
  • Completion date moved by 6 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Sep 2026Possession promised1 month past this date
9 of 11Construction stages donefurthest along: Basement (if any), 0%
16 of 24Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 74 documents Report an error

YASHO NANDANVAN CO-OPERATIVE HOUSING SOCIETY LTD. is a Residential / Group Housing project by KEDAR BUILDCON PRIVATE LIMITED in Raigarh, Maharashtra, registered with MahaRERA as P52000051284 on 8 Jun 2023. Possession was promised by 30 Sep 2026 and is now 1 months past that date. The completion date has moved by 6 months from the original filing. 8 of the 24 units on this registration are recorded sold or booked, and 9 of 11 construction stages are filed complete.

At a glance

Project

  • NameYASHO NANDANVAN CO-OPERATIVE HOUSING SOCIETY LTD.
  • TypeResidential / Group Housing
  • Location
    • PANVEL
    • OLD PANVEL
    • Navi Mumbai Panvel Rigardh (CT)
    • Raigarh
    • 410206
  • Pincode410206
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000051284
  • ReraGenie IDRG-MH-05819

Builder

  • NameKEDAR BUILDCON PRIVATE LIMITED
  • Entity typeCompany
  • DirectorsPIYUSH DHIRAJLAL DOSHI, VISHAL PIYUSH DOSHI, MITESH PIYUSH DOSHI
  • Other registrations1 more →
  • Past their filed date1

Key dates

1 months past promisethis monthRegisteredJun 2023First promiseMar 2026Revised toSep 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on8 Jun 2023
  • Promised completion30 Sep 2026
  • Revised completionRevised to 30 Sep 2026 (originally 31 Mar 2026)
  • Buildings1 building record
  • Documents filed74 files

Current status

33%8 of 24 units booked
100.0%Work done, per cost certificate

Figures as on 26 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
YASHO NANDANVAN CO-OPERATIVE HOUSING SOCIETY LTDNA7718624

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 26 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 0%.

YASHO NANDANVAN CO-OPERATIVE HOUSING SOCIETY LTD: 82% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 26 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes100%

Parking filed30

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots30
Closed/Covered17
Open Space13

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area646 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
YASHO NANDANVAN CO-OPERATIVE HOUSING SOCIETY LTD.Navi Mumbai Panvel Rigardh (CT)Raigarh

Approvals and building plan

Sanctioning authorityPANVEL MUNICIPAL CORPORATION
Permissible FSI2384.21
Proposed, not sanctioned1,884 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch228/4 KARNALA ROYAL ,OLD PANVEL,PANVEL,NAVI MUMBAI-410206
Estimated costRs 5.45 cr
Cost incurredRs 5.45 cr
Work done100.0%
BuildingWingEstimatedIncurred
YASHO NANDANVAN CO-OPERATIVE HOUSING SOCIETY LTDNARs 4.91 crRs 4.91 cr
-NARs 54.50 lakhRs 54.50 lakh

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectNAGARKAR AND ASSOCIATES
ArchitectDEVISE DESIGN
EngineerRAHUL SAHSTE AND ASSOCIATES
Chartered AccountantMSNK AND ASSOCIATES
Chartered AccountantPAWAN & ASSOCIATES
PartnerRole in project
KEDAR BUILDCON PRIVATE LIMITED-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA26052621098Mar 2026 → Sep 2026

Reason as filed by the promoter1. While registering the project with MahaRERA,we had underestimated the project completion time which proved to be less for such a project. 2. But now the works is completed and OC is obtained on 14-05-2026. 3. Hence,we request you to consider our request & justification & grant extension to our said project so that we can file completion update.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 8 May 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 8 May 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 8 May 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 8 May 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed74

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2024-2025)File: From 2A(Fy 2024-25).pdf26 May 2026
Form 5 (FY 2024-2025)File: FROM 5(Fy 2024-25).pdf26 May 2026
Withdrawal Update Form 1File: From 01 Yashonandanvan CHS.pdf15 May 2026
Withdrawal Update Form 2File: From 02 ashonandanvan CHS.pdf15 May 2026
Withdrawal Update Form 3File: From 03 March 26_compressed.pdf15 May 2026
Withdrawal Update Form 1File: FORM1.pdf25 Mar 2026
Withdrawal Update Form 1File: FORM1.pdf25 Mar 2026
Withdrawal Update Form 1File: FORM1.pdf25 Mar 2026
Withdrawal Update Form 2File: Form-2 Yashonandanvan.pdf25 Mar 2026
Withdrawal Update Form 2File: Form-2 Yashonandanvan.pdf25 Mar 2026
Withdrawal Update Form 2File: F2 Q3- Engineer Certificate - Yashonandanvan (1).pdf25 Mar 2026
Withdrawal Update Form 3File: F-3 Q3 CA Certificate - Yashonandanvan_compressed.pdf25 Mar 2026
Withdrawal Update Form 3File: F-3 Q3 CA Certificate - Yashonandanvan_compressed.pdf25 Mar 2026
Withdrawal Update Form 3File: F-3 Q3 CA Certificate - Yashonandanvan_compressed.pdf25 Mar 2026
Withdrawal Update Form 1File: Form-1 Yasho Nandanvan.pdf26 Oct 2025
Withdrawal Update Form 2File: Form-2 Yashonandanvan.pdf26 Oct 2025
Withdrawal Update Form 3File: Form 3 Yashonandanvan.pdf26 Oct 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: F-1 Yashonandanvan Q4 24-25.pdf28 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: F-3 Yashonandanvan Q4 24-25_compressed.pdf28 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: F-2 Yashonandanvan Q4 24-25.pdf28 Apr 2025
Disclosure of sold/ booked inventoryFile: Nandnavan Q4 sold unsold sign copy.pdf28 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: nandanvan form no 1 Q3.pdf31 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form - 3 Yashonandanvan_compressed.pdf28 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Yahonandanvan CHS.pdf28 Jan 2025
Disclosure of sold/ booked inventoryFile: Yashonandanvan - Discolsure of Sold,Booked Inventory.pdf28 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: F1-Yashonandanvan(Architect Certificate) Q2.pdf17 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: F3- Yashonandanvan CA Certificate -Q2.pdf17 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: F2 -YashoNandanvan Engineer Certificate Q2.pdf17 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Yashonandanvan Form no1 Q1 (24-25).pdf23 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2.pdf20 Jul 2024
Disclosure of sold/ booked inventoryFile: Yashonandanvan Disclosure of sold,unsold june 24.pdf20 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3Q1 Yashonandanvan(24-25)_compressed.pdf20 Jul 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: form-05 yashonandanvan 23-24.pdf20 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 7TH SLABYashonandanvan.pdf18 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form No-2Yasho Nandanvan Society.pdf18 May 2024
Disclosure of sold/ booked inventoryFile: YAHONANDANVAN SOCIETY Sold Unsold.pdf18 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form No-3 Yasho Nandanvan Society.pdf18 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: yashonandanvan form 3 sep 2023.pdf16 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: yashonandanvan form 3 dec 2023.pdf16 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q2 FORM-1(1).pdf12 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q2 (Yashonandanvan CHS)Form-1(2).pdf12 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q3(Yashonandanvan CHS)Form-1(3).pdf12 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q3 (Yashonandanvan CHS)Form-1(4).pdf12 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: YASHONANDANVAN Q-2 fORM-2.pdf12 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: YASHONANDANVAN Q-3 fORM-2.pdf12 Feb 2024
Disclosure of sold/ booked inventoryFile: YASHONANDANVAN Q-2-SOLD UNSOLD.pdf12 Feb 2024
Disclosure of sold/ booked inventoryFile: YASHONANDANVAN Q-3 SOLD UNSOLD.pdf12 Feb 2024
Proforma of Agreement for saleFile: AFS_YASHONANDANVAN CHS 03062023.pdf3 Jun 2023
Other - LegalFile: Yasho Nandanvan power of attorney NEW-1-11.pdf3 Jun 2023
Other - LegalFile: Yasho Nandanvan power of attorney NEW-12-22.pdf3 Jun 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Yashonandanvan Version V_compressed.pdf12 May 2023
Layout approvalFile: PASSING PLAN.pdf8 May 2023
Building plan approvalFile: PASSING PLAN.pdf8 May 2023
PAN CardFile: 1 PAN Card (3).pdf8 May 2023
Copy of the legal title reportFile: ilovepdf_merged (6)_compressed.pdf8 May 2023
Details of encumbrances concerned to FinanceFile: Declaration Finance encumbrances (3).pdf8 May 2023
Details of encumbrances concerned to FinanceFile: Declaration legal encumbrances.pdf8 May 2023
Details of encumbrances concerned to LegalFile: Declaration Finance encumbrances (3).pdf8 May 2023
Details of encumbrances concerned to LegalFile: Declaration legal encumbrances.pdf8 May 2023
Copy of Layout Approval (in case of layout)File: PASSING PLAN.pdf8 May 2023
Building Plan Approval / NA Order for plotted developmentFile: PASSING PLAN.pdf8 May 2023
Commencement Certificates / NA Order for plotted developmentFile: Nandanvan CC.pdf8 May 2023
Declaration about Commencement CertificateFile: Declaration CC (1).pdf8 May 2023
Declaration in FORM BFile: Developer Declaration (on stamp paper) (1).pdf8 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1Yasho-Nandanvan-Architect Certificate.pdf8 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 Yasho-Nandanvan Engineer Certificate.pdf8 May 2023
CERSAI detailsFile: Declaration Cersai (2).pdf8 May 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: disclosure of interest in other rera estate organizations - MD SIR.pdf8 May 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: disclosure of interest in other rera estate organizations - PD SIR.pdf8 May 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: disclosure of interest in other rera estate organizations - VD SIr.pdf8 May 2023
Proforma of Allotment letterFile: MODEL Draft Allotment letter as per rera -Printed_compressed.pdf8 May 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: RERA Bank Ac declaration.pdf8 May 2023
Deviation Report with respect to Allotment letterFile: Declaration allotment deviation report.pdf8 May 2023
Deviation Report with respect to model copy of AgreementFile: Declaration agreement deviation report.pdf8 May 2023

How this compares with Raigarh

33%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one moved by 6 months
26%of Raigarh registrations have lapsed or been cancelledthis one is on the register

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep YASHO NANDANVAN CO-OPERATIVE HOUSING SOCIETY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near OLD PANVEL5,900+ in Raigarh

2 kmYASHO NANDANVAN CO-OPERACompleted 212Lapsed / revoked 57Other 133Dot size: filed unitsN

Filed coordinates, straight-line distance. 402 registered projects within 2 km.

Builder: KEDAR BUILDCON PRIVATE LIMITED

KEDAR BUILDCON PRIVATE LIMITED has 2 registrations on MahaRERA, including NAVANKUR CO-OPERATIVE HOUSING SOCIETY LTD. and YASHO NANDANVAN CO-OPERATIVE HOUSING SOCIETY LTD.. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if YASHO NANDANVAN CO-OPERATIVE HOUSING SOCIETY LTD. is delayed beyond 30 Sep 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of YASHO NANDANVAN CO-OPERATIVE HOUSING SOCIETY LTD.?

The registered promoter entity is KEDAR BUILDCON PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in YASHO NANDANVAN CO-OPERATIVE HOUSING SOCIETY LTD.?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for YASHO NANDANVAN CO-OPERATIVE HOUSING SOCIETY LTD.?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at YASHO NANDANVAN CO-OPERATIVE HOUSING SOCIETY LTD.?

The professionals named in the filing: Architect: NAGARKAR AND ASSOCIATES; Architect: DEVISE DESIGN; Engineer: RAHUL SAHSTE AND ASSOCIATES; Chartered Accountant: MSNK AND ASSOCIATES; Chartered Accountant: PAWAN & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in YASHO NANDANVAN CO-OPERATIVE HOUSING SOCIETY LTD.?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About YASHO NANDANVAN CO-OPERATIVE HOUSING SOCIETY LTD.. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save YASHO NANDANVAN CO-OPERATIVE HOUSING SOCIETY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.