YASH PLATINA
By MD REALTORS & DEVELOPERS LLP
RG-MH-27893 · RERA P99000026746 · Last updated on MahaRERA portal: 25 Jan 2025
Source: official MahaRERA filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.
See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
YASH PLATINA is a Residential / Group Housing project by MD REALTORS & DEVELOPERS LLP in Palghar, Maharashtra, registered with MahaRERA as P99000026746 on 21 Oct 2020. The registration is recorded completed; possession was promised by 30 Sep 2025.
At a glance
Project
- NameYASH PLATINA
- TypeResidential / Group Housing
- Location
- OFF D MART ROAD
- NEAR PENINSNULA PARK VIRAR WEST
- Vasai-Virar City (M Corp)
- Vasai
- Palghar
- 401303
- Pincode401303
- MapView location on Google Maps (as filed on RERA)
- RERA no.P99000026746
- ReraGenie IDRG-MH-27893
Builder
- NameMD REALTORS & DEVELOPERS LLP
- Entity typePartnership
- PartnersPANKAJ SHANTILAL PARIKH, CHETAN SHANTILAL PARIKH, VINOD SHANTILAL PARIKH
- Other registrations1 more →
- Completed1 of 2
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on21 Oct 2020
- Promised completion30 Sep 2025
- Revised completionNone
- Buildings3 building records
- Documents filed65 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| YASH PLATINA WING-A | NA | 23 | 0 | 0 | 0 | 0 |
| YASH PLATINA WING-B | NA | 23 | 0 | 0 | 0 | 0 |
| YASH PLATINA WING-C | NA | 23 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building3
As on 25 Jan 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
9 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Stilt Floor, at 50%.
YASH PLATINA WING-A32%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 50% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
YASH PLATINA WING-B32%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 50% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
YASH PLATINA WING-C32%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 50% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 25 Jan 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 10% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 10% |
| Storm Water Drains | Yes | 10% |
| Landscaping & Tree Planting | Yes | 50% |
| Street Lighting | Yes | 10% |
| Community Buildings | Yes | 50% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 10% |
| Solid Waste Management And Disposal | Yes | 10% |
| Water conservation /Rain water harvesting | Yes | 10% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 10% |
| Electrical meter room, sub-station, receiving station | Yes | 50% |
| Aggregate area of recreational Open Space | Yes | 77% |
| Open Parking | Yes | 10% |
Land and ownership1
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| RAJ ENTERPRISES | Vasai-Virar City (M Corp) | Palghar |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | SANJAY NARANG |
| Engineer | PARESH UNNARKAR |
| Chartered Accountant | AKBINDER KAUR SAINI |
| Chartered Accountant | SANJAY BANSAL |
| Chartered Accountant | BHARAT DHONDE |
| Partner | Role in project |
|---|---|
| MD REALTORS & DEVELOPERS LLP | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 9 Oct 2020 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 9 Apr 2021 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 9 Apr 2021 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 9 Apr 2021Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 2 Apr 2024
Documents filed65
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Architect’s Certificate on Completion of Project (Form 4)File: Yash Platina_Form-4_compressed.pdf | 25 Jan 2025 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Yash Platina OC_16-02-2024_compressed.pdf | 2 Apr 2024 |
| Details of encumbrancesFile: Self Declaration of Promoter of encumbrances_Yash Platina_31-01-24.pdf | 31 Jan 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form-2A_Yash Platina_31-03-23_compressed.pdf | 5 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3_YP_31-12-23_signed by Promoter.pdf | 5 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1_30-09-23_Yash Platina_signed by MD.pdf | 17 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2_30-09-23_Yash Platina.pdf | 17 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3-Yash Platina_30-09-23_compressed-signed.pdf | 12 Oct 2023 |
| Details of encumbrancesFile: Self Declaration of Promoter of encumbrances_Yash Platina_compressed-signed.pdf | 23 May 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3_Yash Platina_31-03-23_signed by promoter.pdf | 11 Apr 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form-5_Yash Platina_FY 2020-21.pdf | 10 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form-5_Yash Platina_FY 2021-22_signed by Promoter.pdf | 10 Feb 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1_31-12-2022_Yash Platina_signed by MD.pdf | 6 Feb 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form-2A_Yash Platina_31-03-22.pdf | 6 Feb 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Certified Yash Platina- Form 3-30-09-22_compressed-signed.pdf | 6 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: Yash Platina_Form5_FY 2017-18.pdf | 21 Jan 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Yash Platina_Form5_FY 2018-19.pdf | 21 Jan 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Yash Platina_Form5_FY 2019-20.pdf | 21 Jan 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1_30-06-2022_Yash Platina_compressed-signed by Promoter.pdf | 15 Jul 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2_Yash Platina_30-06-2022_compressed-signed by Promoter.pdf | 15 Jul 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Yash Platina-30-06-22-final CA Certified_compressed_signed by Promoter.pdf | 15 Jul 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1_31-12-2021_Yash Platina_compressed.pdf | 4 May 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1_31-03-2022_Yash Platina.pdf | 4 May 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2_31-12-2021_Yash Platina_compressed.pdf | 4 May 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2_31-03-2022_Yash Platina_compressed.pdf | 4 May 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3_Yash Platina-31-12-2021_compressed.pdf | 4 May 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form- 3_Yash Platina-31-03-22_compressed.pdf | 4 May 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2_Yash Platina_30-09-21_compressed.pdf | 23 Nov 2021 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1_Yash Platina_30-09-21_compressed.pdf | 20 Nov 2021 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Yash Platina_Form-3_30-09-21_compress.pdf | 2 Nov 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form-2A_Yash Platina_31-12-20_compressed.pdf | 19 Aug 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form-2A_Yash Platina_31-03-21_compressed.pdf | 19 Aug 2021 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2_Yash Platina_30-06-21_compressed.pdf | 17 Aug 2021 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3_Yash Platina_31-03-21_compressed.pdf | 15 May 2021 |
| Layout approvalFile: Layout Plan_26-03-2021.pdf | 9 Apr 2021 |
| Building plan approvalFile: 2nd-7th, 8th_9th-12th_14th-17th_19th-21st Floor Plan_26-03-2021.pdf | 9 Apr 2021 |
| Building plan approvalFile: 13th_18th Floor_26-03-2021.pdf | 9 Apr 2021 |
| Building plan approvalFile: Section Plan_26-03-2021.pdf | 9 Apr 2021 |
| Copy of Layout Approval (in case of layout)File: Layout Plan_26-03-2021.pdf | 9 Apr 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: 2nd-7th, 8th_9th-12th_14th-17th_19th-21st Floor Plan_26-03-2021.pdf | 9 Apr 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: 13th_18th Floor_26-03-2021.pdf | 9 Apr 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: Section Plan_26-03-2021.pdf | 9 Apr 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: 2nd-7th, 8th_9th-12th_14th-17th_19th-21st Floor Plan_26-03-2021.pdf | 9 Apr 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: Revised Development permission_Yash Platina_26-03-2021.pdf | 9 Apr 2021 |
| Layout approvalFile: Lay out Approval_compressed.pdf | 9 Oct 2020 |
| Building plan approvalFile: Approved Plan (2)_compressed.pdf | 9 Oct 2020 |
| Building plan approvalFile: Approved Plan (3)_compressed.pdf | 9 Oct 2020 |
| Building plan approvalFile: Approved Plan (4)_compressed.pdf | 9 Oct 2020 |
| Building plan approvalFile: Approved Plan (5)_compressed.pdf | 9 Oct 2020 |
| Copy of the legal title reportFile: Title Certificate 1_compressed.pdf | 9 Oct 2020 |
| Copy of the legal title reportFile: Title Certificate 2_compressed.pdf | 9 Oct 2020 |
| Details of encumbrancesFile: No Encumbrance Certificate.pdf | 9 Oct 2020 |
| Copy of Layout Approval (in case of layout)File: Lay out Approval_compressed.pdf | 9 Oct 2020 |
| Building Plan Approval / NA Order for plotted developmentFile: Approved Plan (2)_compressed.pdf | 9 Oct 2020 |
| Building Plan Approval / NA Order for plotted developmentFile: Approved Plan (3)_compressed.pdf | 9 Oct 2020 |
| Building Plan Approval / NA Order for plotted developmentFile: Approved Plan (4)_compressed.pdf | 9 Oct 2020 |
| Building Plan Approval / NA Order for plotted developmentFile: Approved Plan (5)_compressed.pdf | 9 Oct 2020 |
| Commencement Certificates / NA Order for plotted developmentFile: RDP_CC_compressed.pdf | 9 Oct 2020 |
| Proforma of Allotment letterFile: Draft of Allotment Letter.pdf | 9 Oct 2020 |
| Proforma of Allotment letterFile: Draft Agreement for Sale_compressed.pdf | 9 Oct 2020 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 _01-07-20.pdf | 7 Oct 2020 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_compressed.pdf | 2 Oct 2020 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_compressed.pdf | 2 Oct 2020 |
| Declaration in FORM BFile: FormB Promoters.pdf | 11 Sep 2020 |
| PAN CardFile: PAN MD Realtors .pdf | 10 Sep 2020 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Palghar
Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.
Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 65 filed documents as one ZIP, foldered, with a manifest
Keep YASH PLATINA on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near NEAR PENINSNULA PARK VIRAR WEST3,200+ in Palghar
Filed coordinates, straight-line distance. 187 registered projects within 2 km.
Mayfair Virar Gardens Cluster-VI
MAYFAIR HOUSING
MAYFAIR VIRAR GARDENS CLUSTER IV
MAYFAIR HOUSING
MAYFAIR VIRAR GARDENS BUILDING NO 17, 18, 19,
MAYFAIR HOUSING
Agarwal Infinity
Laxminarayan Prabhudayal Agarwal
GOKUL HARI ANANTA
Mehta Ventures
GOKUL NAKSHATRA II
JSB HOMEMAKERS PRIVATE LIMITED
See every Palghar project, with the district possession charts
Builder: MD REALTORS & DEVELOPERS LLP
MD REALTORS & DEVELOPERS LLP has 2 registrations on MahaRERA, including YASH PLATINA and PLATINUM PARK AVENUE D2. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.
Frequently asked questions
What are my rights if YASH PLATINA is delayed beyond 30 Sep 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of YASH PLATINA?
The registered promoter entity is MD REALTORS & DEVELOPERS LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in YASH PLATINA?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for YASH PLATINA?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at YASH PLATINA?
The professionals named in the filing: Architect: SANJAY NARANG; Engineer: PARESH UNNARKAR; Chartered Accountant: AKBINDER KAUR SAINI; Chartered Accountant: SANJAY BANSAL; Chartered Accountant: BHARAT DHONDE. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in YASH PLATINA?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback