Registered No litigation declared Others project

Yash Padma Phase II

By SAI SHRADDHA ENTERPRISES

RG-MH-07304 · RERA P99000055131 · Last updated on MahaRERA portal: 11 Jun 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 4 other registrations.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Dec 2030Possession promisedno revision filed
16 of 88Construction stages doneacross 8 buildings; furthest along: Internal walls, 90%
24 of 66Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 94 documents Report an error

Yash Padma Phase II is a Others project by SAI SHRADDHA ENTERPRISES in Palghar, Maharashtra, registered with MahaRERA as P99000055131 on 4 Mar 2024. Possession is promised by 31 Dec 2030. 42 of the 66 units on this registration are recorded sold or booked, and 16 of 88 construction stages are filed complete.

At a glance

Project

  • NameYash Padma Phase II
  • TypeOthers
  • Location
    • Boisar Tarapur Road
    • Boisar
    • Palghar
    • 401501
  • Pincode401501
  • RERA no.P99000055131
  • ReraGenie IDRG-MH-07304

Builder

  • NameSAI SHRADDHA ENTERPRISES
  • Entity typePartnership
  • GSTIN27ABWFS8130Q1Z2
  • PartnersMUKESH SHIVDAS SONAR, NIKET VINOD RANE, RAMCHANDRA GANPAT VICHARE, SHAILAJA RAMCHANDRA VICHARE, SHARDUL RAMCHANDRA VICHARE, DARPAN NARENDRA THAKUR, ANIL RAMCHANDRA GUPTA, ANKUSH PRALHAD KOTMIRE, DEVENDRA RAJNIKANT LADHANI, DAMODAR SADASHIV KARDILE, NEELIMA DAMODAR KARDILE, NICKY TEKCHAND JAIN
  • Other registrations4 more →
  • Completed1 of 5
  • No longer live1 lapsed, de-registered or revoked

Key dates

this monthRegisteredMar 2024PromisedDec 2030

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on4 Mar 2024
  • Promised completion31 Dec 2030
  • Revised completionNone
  • Buildings8 building records
  • Documents filed94 files

Current status

64%42 of 66 units booked
65.1%Work done, per cost certificate

Figures as on 11 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
IRIS Building no 3 Type CNA8727027
JASMINE Building no 02 Type ENA8726733
Bungalow No 01 Type C1NA32101
Bungalow No 02 Type C2NA42101
Bungalow No 03 Type C3NA32101
Bungalow No 04 Type C4NA32101
Bungalow No 05 Type F1NA22101
Bungalow No 06 Type F2NA22101

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building8

As on 11 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

16 of 88 construction stages are filed complete across 8 buildings. The stage furthest along is Internal walls, at 90%.

IRIS Building no 3 Type C45%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises35%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.10%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
JASMINE Building no 02 Type E65%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Bungalow No 01 Type C141%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Bungalow No 02 Type C218%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Bungalow No 03 Type C318%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Bungalow No 04 Type C40%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Bungalow No 05 Type F10%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Bungalow No 06 Type F20%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 11 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes30%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed79

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots79
Open Space79
BuildingOpen SpaceTotal
IRIS Building no 3 Type C3434
JASMINE Building no 02 Type E3333
Bungalow No 01 Type C122
Bungalow No 02 Type C222
Bungalow No 03 Type C322
Bungalow No 04 Type C422
Bungalow No 05 Type F122
Bungalow No 06 Type F222

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area11,243 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityCollector office Palghar
Permissible FSI5517.21
Proposed, not sanctioned5,517 sq m
Buildings approved8
Buildings sanctioned8

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchCRX2 4FP Gokul Twp Prathamesh Plaza Virar West 401303
Estimated costRs 17.70 cr
Cost incurredRs 11.52 cr
Work done65.1%
BuildingWingEstimatedIncurred
IRIS Building no 3 Type CNARs 6.50 crRs 4.23 cr
JASMINE Building no 02 Type ENARs 5.78 crRs 5.20 cr
-NARs 1.55 crRs 1.40 cr
Bungalow No 01 Type C1NARs 81.72 lakhRs 44.95 lakh
Bungalow No 02 Type C2NARs 81.72 lakhRs 12.26 lakh
Bungalow No 03 Type C3NARs 81.72 lakhRs 12.26 lakh
Bungalow No 04 Type C4NARs 81.72 lakh-
Bungalow No 05 Type F1NARs 29.68 lakh-
Bungalow No 06 Type F2NARs 29.68 lakh-

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectNishant Patil
EngineerYogesh Damaji Vaja
Chartered AccountantBharat Dhonde and Co.
Chartered AccountantMohammad Memon
Chartered AccountantBharat Dhonde &Co
PartnerRole in project
SAI SHRADDHA ENTERPRISES-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 23 Dec 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 23 Dec 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 23 Dec 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 28 Feb 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2030

Documents filed94

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 94 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 5 (FY 2025-2026)File: RERA Form 5-YASH PADMA PHASE-II-2025-26.pdf11 Jun 2026
Form 5 (FY 2024-2025)File: Phase 2-Form 5 24-25.pdf19 May 2026
Withdrawal Update Form 1File: Form 1-2025 26 4th Quarter Phase II.pdf6 May 2026
Withdrawal Update Form 2File: Form 2-Phase II 22-04-26.pdf6 May 2026
Withdrawal Update Form 3File: FORM 3 MAR 2026 YASH PADMA PHASE II.pdf6 May 2026
Form 1File: Form 1 .pdf21 Mar 2026
Form 2File: Form 2.pdf21 Mar 2026
Form 3File: Form 3.pdf21 Mar 2026
Disclosure of Sold and Booked InventoryFile: Inventory-Yash Padma Phase-II-31-03-2025.pdf21 Mar 2026
Withdrawal Update Form 1File: Form 1 Dec 25.pdf21 Mar 2026
Withdrawal Update Form 2File: Form 2 Dec25.pdf21 Mar 2026
Withdrawal Update Form 3File: Form 3 Dec25.pdf21 Mar 2026
Withdrawal Update Form 1File: Form 1 .pdf20 Mar 2026
Withdrawal Update Form 1File: Form 1.pdf20 Mar 2026
Withdrawal Update Form 1File: Form 1.pdf20 Mar 2026
Withdrawal Update Form 2File: Form 2.pdf20 Mar 2026
Withdrawal Update Form 2File: Form 2.pdf20 Mar 2026
Withdrawal Update Form 2File: Form 02.pdf20 Mar 2026
Withdrawal Update Form 3File: Form 3.pdf20 Mar 2026
Withdrawal Update Form 3File: Form 3.pdf20 Mar 2026
Withdrawal Update Form 3File: Form 3 (1).pdf20 Mar 2026
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 (2023-24) (F).pdf28 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Sept-2024.pdf22 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Dec-2024.pdf22 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - 30-06-24.pdf22 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - 30-09-24.pdf22 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - 31-12-24.pdf22 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 June-2024 (F).pdf22 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Sept-2024 (F).pdf22 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Dec-2024 (F).pdf22 Feb 2025
Disclosure of sold/ booked inventoryFile: disclosure sold unsold.pdf22 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Phase 2 - 10-07-2024 - 31-03-2024.pdf20 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Phase 2 - 10-07-2024 - 30-06-2024.pdf20 Aug 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A - Phase II - 07-08-2024.pdf20 Aug 2024
Proforma of Agreement for saleFile: Agreement Draft Yash Padma Phase-II Rera.pdf10 Apr 2024
Proforma of Agreement for saleFile: First Sale Agreement - Boisar - 101-A1, A2, 102-B2, 155-Sai Shraddha -Phase-II (1).pdf15 Mar 2024
Commencement Certificates / NA Order for plotted developmentFile: Layout.pdf28 Feb 2024
Declaration about Commencement CertificateFile: CC Declaration.pdf28 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Architech.pdf28 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf28 Feb 2024
Other - TechnicalFile: Layout.pdf28 Feb 2024
Other - TechnicalFile: Sanction FSI Calculation.pdf28 Feb 2024
Other - TechnicalFile: Building Plans.pdf28 Feb 2024
Other - TechnicalFile: Annexure-A as per Order 50.pdf28 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 FINAL_11zon.pdf20 Feb 2024
Other - LegalFile: Conveyance Ram Vichare To Sai Shradda.pdf13 Feb 2024
Other - LegalFile: Conveyance Chotu Dhodi To DT.pdf13 Feb 2024
Proforma of Agreement for saleFile: Model Form of Agreement.pdf30 Jan 2024
Deviation Report with respect to model copy of AgreementFile: Deviation Report-Agreement for sale.pdf30 Jan 2024
Commencement Certificates / NA Order for plotted developmentFile: Email Screenshot.pdf16 Jan 2024
Other - TechnicalFile: Additional Floor Declaration.pdf16 Jan 2024
Other - TechnicalFile: Occupancy Certificate - Type-D.pdf16 Jan 2024
Other - TechnicalFile: Form 4 Yash Padma Phase-I.pdf16 Jan 2024
Details of encumbrances concerned to FinanceFile: Encumbrance Delaration - Legal.pdf25 Dec 2023
Details of encumbrances concerned to LegalFile: Encumbrance Delaration - Legal.pdf25 Dec 2023
Commencement Certificates / NA Order for plotted developmentFile: CC confirmation.pdf25 Dec 2023
Disclosure of sold/ booked inventoryFile: Disclosure of Sold -Book Inventry.pdf25 Dec 2023
Building plan approvalFile: TYPE-C.pdf23 Dec 2023
Building plan approvalFile: TYPE-C1 to C4.pdf23 Dec 2023
Building plan approvalFile: TYPE-E.pdf23 Dec 2023
Building plan approvalFile: TYPE-F1.pdf23 Dec 2023
Building plan approvalFile: TYPE-F2.pdf23 Dec 2023
Layout approvalFile: Layout.pdf23 Dec 2023
PAN CardFile: Sai Shardha Enterprises(Pancard).pdf23 Dec 2023
Copy of the legal title reportFile: TITLE SEARCH REPORT 23-11-2023.pdf23 Dec 2023
Details of encumbrances concerned to FinanceFile: Encumbrance Delaration - Finance Related.pdf23 Dec 2023
Details of encumbrances concerned to LegalFile: Encumbrance Delaration - Finance Related.pdf23 Dec 2023
Copy of Layout Approval (in case of layout)File: Layout.pdf23 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: TYPE-C.pdf23 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: TYPE-C1 to C4.pdf23 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: TYPE-E.pdf23 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: TYPE-F1.pdf23 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: TYPE-F2.pdf23 Dec 2023
Commencement Certificates / NA Order for plotted developmentFile: Revised CC 06-10-23 Com.pdf23 Dec 2023
Declaration in FORM BFile: Form -B.pdf23 Dec 2023
CERSAI detailsFile: CERSAI sai shraddha (Res).pdf23 Dec 2023
CERSAI detailsFile: CERSAI sai sharaddha (Oth).pdf23 Dec 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Anil Gupta.pdf23 Dec 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Damodar Kardile.pdf23 Dec 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Darpan Thakur.pdf23 Dec 2023

How this compares with Palghar

64%of this project is bookeddistrict median 25%
31%of Palghar projects moved their completion datethis one has not
26%of Palghar registrations have lapsed or been cancelledthis one is on the register

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Yash Padma Phase II on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Boisar3,200+ in Palghar

Builder: SAI SHRADDHA ENTERPRISES

SAI SHRADDHA ENTERPRISES has 5 registrations on MahaRERA, including YASH PADMA and SAI KRUPA. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if Yash Padma Phase II is delayed beyond 31 Dec 2030?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Yash Padma Phase II?

The registered promoter entity is SAI SHRADDHA ENTERPRISES, a partnership as per the filing. Its GSTIN 27ABWFS8130Q1Z2 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Yash Padma Phase II?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Yash Padma Phase II?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Yash Padma Phase II?

The professionals named in the filing: Architect: Nishant Patil; Engineer: Yogesh Damaji Vaja; Chartered Accountant: Bharat Dhonde and Co.; Chartered Accountant: Mohammad Memon; Chartered Accountant: Bharat Dhonde &Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Yash Padma Phase II?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Yash Padma Phase II. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Yash Padma Phase II to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.