ReraGenieLog inGet a buyer report

Home / Browse projects / Nagpur, Maharashtra / WOODS RESIDENCY

Completed No litigation declared Plotted project

WOODS RESIDENCY

By SACHIN SURYABHAN MOON

RG-MH-03587 · RERA P50500030850 · Last updated on MahaRERA portal: 26 Sep 2025

Source: official MahaRERA filing

Red flags

  • Completion date moved by 18 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Jun 2024Possession promisedregistration recorded completed
16 of 37Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 79 documents Report an error

WOODS RESIDENCY is a Plotted project by SACHIN SURYABHAN MOON in Nagpur, Maharashtra, registered with MahaRERA as P50500030850 on 20 Sep 2021. The registration is recorded completed; possession was promised by 21 Jun 2024. The completion date has moved by 18 months from the original filing. 21 of the 37 units on this registration are recorded sold or booked.

At a glance

Project

  • NameWOODS RESIDENCY
  • TypePlotted
  • Location
    • WARDHA ROAD
    • SAHARA CITY
    • Gawasi Manapur
    • Nagpur (Rural)
    • Nagpur
    • 441108
  • Pincode441108
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P50500030850
  • ReraGenie IDRG-MH-03587

Builder

  • NameSACHIN SURYABHAN MOON
  • Entity typeIndividual
  • Other registrations2 more →
  • Completed2 of 3
  • Declared earlier projects3 →

Key dates

this monthRegisteredSep 2021First promiseDec 2022Revised toJun 2024Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on20 Sep 2021
  • Promised completion21 Jun 2024
  • Revised completionRevised to 21 Jun 2024 (originally 31 Dec 2022)
  • BuildingsNot stated in filing
  • Documents filed79 files

Current status

57%21 of 37 units booked
75.0%Work done, per cost certificate

Figures as on 26 Sep 2025, this project's latest MahaRERA filing.

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 26 Sep 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

NA Plot Without Structure:

ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities15

As on 26 Sep 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyNoNot applicable
Sewerage (Chamber, Lines, Septic Tank , STP)NoNot applicable
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area4,625 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityNAGPUR METROPOLITAN REGION DEVELOPMENT AUTHORITY (NMRDA)
Permissible FSI8100.0
Proposed, not sanctioned8,100 sq m

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKHAMLA, NAGPUR
Estimated costRs 1.05 cr
Cost incurredRs 78.75 lakh
Work done75.0%
BuildingWingEstimatedIncurred
-NARs 1.05 crRs 78.75 lakh

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectCONEARCHS ARCHITECT PLANNERS AND INTERIOR DESIGNERS
EngineerALLIANCE ASSOCIATES
EngineerRAJESH S REWATKAR
Chartered AccountantKUMAR & JAYAKRISHNAN
Chartered AccountantGAD & ASSOCIATES
Chartered AccountantSUMIT SANTOSH AGRAWAL &ASSOCIATES
PartnerRole in project
SACHIN SURYABHAN MOON-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT50500013274Dec 2022 → Dec 2023

Reason as filed by the promoterDEVELOPMENT WORK NOT COMPLETED.

EA08092502530Dec 2022 → Jun 2024

Reason as filed by the promoterThe purpose of this extension request is solely to enable us to upload the OC and complete the closure formalities on the MahaRERA portal, in accordance with the regulatory requirements.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 24 Jun 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 16 Sep 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 27 Aug 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 16 Sep 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 26 Sep 2025

Documents filed79

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: FORM 1 MAR-24.pdf26 Sep 2025
Form 2File: FORM 2 MAR-24.pdf26 Sep 2025
Form 3File: WOOD -MARCH -2024-FORM 3.pdf26 Sep 2025
Disclosure of Sold and Booked InventoryFile: SOLD-UNSOLD MAR-24.pdf26 Sep 2025
Form 1File: FORM 1 JUN-24.pdf26 Sep 2025
Form 2File: FORM 2 JUN-24.pdf26 Sep 2025
Form 3File: WOOD -JUNE 2024-FORM 3.pdf26 Sep 2025
Disclosure of Sold and Booked InventoryFile: SOLD-UNSOLD JUN-24.pdf26 Sep 2025
Completion CertificateFile: OC - WOODS RESIDENCY.pdf26 Sep 2025
Withdrawal Update Form 1File: FORM 1 DEC-23.pdf29 Aug 2025
Withdrawal Update Form 2File: FORM 2 DEC-23.pdf29 Aug 2025
Withdrawal Update Form 3File: WOOD -DEC -2023-FORM 3.pdf29 Aug 2025
Form 2A (FY 2021-2022)File: Form 2A MAR-22.pdf16 Aug 2025
Form 2A (FY 2023-2024)File: Form 2A MAR-24.pdf16 Aug 2025
Form 2A (FY 2023-2024)File: Form 2A MAR-24.pdf16 Aug 2025
Form 5 (FY 2021-2022)File: WOODS FORM 5 MAR-22.pdf16 Aug 2025
Form 5 (FY 2022-2023)File: WOODS FORM 5 MAR-23.pdf16 Aug 2025
Form 5 (FY 2023-2024)File: WOODS FORM 5 MAR-24.pdf16 Aug 2025
Form 5 (FY 2023-2024)File: WOODS FORM 5 MAR-24.pdf16 Aug 2025
Form 1File: FORM 1 SEPT-21.pdf14 Aug 2025
Form 2File: FORM 2 SEPT-21.pdf14 Aug 2025
Disclosure of Sold and Booked InventoryFile: SOLD-UNSOLD SEPT-21.pdf14 Aug 2025
Form 3File: WOOD -SEP -2021-FORM 3.pdf14 Aug 2025
Disclosure of Sold and Booked InventoryFile: SOLD-UNSOLD DEC-21.pdf14 Aug 2025
Form 1File: FORM 1 DEC-21.pdf14 Aug 2025
Form 2File: FORM 2 DEC-21.pdf14 Aug 2025
Form 3File: WOOD -DEC -2021-FORM 3 2.pdf14 Aug 2025
Form 3File: WOOD -MARCH -2022-FORM 3.pdf14 Aug 2025
Form 1File: FORM 1 MAR-22.pdf14 Aug 2025
Form 2File: FORM 2 MAR-22.pdf14 Aug 2025
Disclosure of Sold and Booked InventoryFile: SOLD-UNSOLD MAR-22.pdf14 Aug 2025
Disclosure of Sold and Booked InventoryFile: SOLD-UNSOLD JUN-22.pdf14 Aug 2025
Form 1File: FORM 1 JUN-22.pdf14 Aug 2025
Form 2File: FORM 2 JUN-22.pdf14 Aug 2025
Form 3File: WOOD -JUN -2022-FORM 3.pdf14 Aug 2025
Form 3File: WOOD -SEP -2022-FORM 3.pdf14 Aug 2025
Form 1File: FORM 1 SEPT-22.pdf14 Aug 2025
Form 2File: FORM 2 SEPT-22.pdf14 Aug 2025
Disclosure of Sold and Booked InventoryFile: SOLD-UNSOLD SEPT-22.pdf14 Aug 2025
Disclosure of Sold and Booked InventoryFile: SOLD-UNSOLD DEC-22.pdf14 Aug 2025
Form 1File: FORM 1 DEC-22.pdf14 Aug 2025
Form 2File: FORM 2 DEC-22.pdf14 Aug 2025
Form 3File: WOOD -DEC -2022-FORM 3.pdf14 Aug 2025
Form 3File: WOOD -MARCH -2023-FORM 3.pdf14 Aug 2025
Form 1File: FORM 1 MAR-23.pdf14 Aug 2025
Form 2File: FORM 2 MAR-23.pdf14 Aug 2025
Disclosure of Sold and Booked InventoryFile: SOLD-UNSOLD MAR-23.pdf14 Aug 2025
Disclosure of Sold and Booked InventoryFile: SOLD-UNSOLD JUN-23.pdf14 Aug 2025
Form 1File: FORM 1 JUN-23.pdf14 Aug 2025
Form 2File: FORM 2 JUN-23.pdf14 Aug 2025
Form 3File: WOOD -JUNE -2023-FORM 3.pdf14 Aug 2025
Form 3File: WOOD -SEP -2023-FORM 3 (2).pdf14 Aug 2025
Form 1File: FORM 1 SEPT-23.pdf14 Aug 2025
Form 2File: FORM 2 SEPT-23.pdf14 Aug 2025
Disclosure of Sold and Booked InventoryFile: SOLD-UNSOLD SEPT-23.pdf14 Aug 2025
Disclosure of Sold and Booked InventoryFile: SOLD-UNSOLD DEC-23.pdf14 Aug 2025
Form 1File: FORM 1 DEC-23.pdf14 Aug 2025
Form 2File: FORM 2 DEC-23.pdf14 Aug 2025
Form 3File: WOOD -DEC -2023-FORM 3.pdf14 Aug 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A.pdf15 Apr 2023
Disclosure of sold/ booked inventoryFile: INVENTORY.pdf15 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5.pdf15 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5.pdf15 Apr 2023
Declaration about Commencement CertificateFile: FORMAT D.pdf18 Sep 2021
Layout approvalFile: scan395new.pdf16 Sep 2021
Copy of Layout Approval (in case of layout)File: scan395new.pdf16 Sep 2021
Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE.pdf16 Sep 2021
Building plan approval or NA orderFile: NA ORDER.pdf27 Aug 2021
Building Plan Approval / NA Order for plotted developmentFile: NA ORDER.pdf27 Aug 2021
Commencement Certificates / NA Order for plotted developmentFile: NA ORDER.pdf27 Aug 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3.pdf17 Jul 2021
Proforma of Allotment letterFile: AGREEMENT TO SELL-RERA-ADITYA INFRA-GAWASI MANAPUR-SACHIN MOON-STD.pdf17 Jul 2021
Proforma of Allotment letterFile: Allotment Letter.pdf16 Jul 2021
Declaration in FORM BFile: FORM B.pdf15 Jul 2021
Layout approvalFile: Scan20190727165417.pdf24 Jun 2021
PAN CardFile: SACHIN MOON PAN.pdf24 Jun 2021
Copy of the legal title reportFile: Title verification.pdf24 Jun 2021
Details of encumbrancesFile: Non Encumbrance certificate.pdf24 Jun 2021
Copy of Layout Approval (in case of layout)File: Scan20190727165417.pdf24 Jun 2021

Promoter's earlier projects3

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
ADDITYA RESIDENCYGAWASI MANAPUR-CompletedDec 2022Dec 2022
SHIVAJI COMPLEXKALMESHWAR34CompletedDec 2021Dec 2021
VEDAARYAWARDHA ROAD224CompletedAug 2019Late, Aug 2019

How this compares with Nagpur

57%of this project is bookeddistrict median 35%
13%of Nagpur projects moved their completion datethis one moved by 18 months
22%of Nagpur registrations have lapsed or been cancelledthis one is completed

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep WOODS RESIDENCY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near SAHARA CITY2,800+ in Nagpur

2 kmWOODS RESIDENCYCompleted 15Lapsed / revoked 6Other 8Dot size: filed unitsN

Filed coordinates, straight-line distance. 29 registered projects within 2 km.

Builder: SACHIN SURYABHAN MOON

SACHIN SURYABHAN MOON has 3 registrations on MahaRERA, including ADDITYA RESIDENCY and WOODS RESIDENCY. Its filings disclose 3 earlier MahaRERA projects: declares 2 of 3 past projects completed on time. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What are my rights if WOODS RESIDENCY is delayed beyond 21 Jun 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of WOODS RESIDENCY?

The registered promoter entity is SACHIN SURYABHAN MOON, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in WOODS RESIDENCY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for WOODS RESIDENCY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at WOODS RESIDENCY?

The professionals named in the filing: Architect: CONEARCHS ARCHITECT PLANNERS AND INTERIOR DESIGNERS; Engineer: ALLIANCE ASSOCIATES; Engineer: RAJESH S REWATKAR; Chartered Accountant: KUMAR & JAYAKRISHNAN; Chartered Accountant: GAD & ASSOCIATES; Chartered Accountant: SUMIT SANTOSH AGRAWAL &ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in WOODS RESIDENCY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About WOODS RESIDENCY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save WOODS RESIDENCY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.